Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
(Potential Severity)
Task / Activity
Recovery Measures
(Letter & Number)
(Severity Rating)
Rating (Control in
PNEUMATIC TESTING
Consequence
Risk Rating
Probability
Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect
place)
(Potential to do Harm) (If the Hazard is released)
Mobilization of Pneumatic
Testing Materials.
Loading of equipment with the instruction of manual
Unsecured load of Personal injury Maintain the equipment stable and steady and maintain the
equipment Slip/trip/fall centre of gravity.
Inexperienced drivers and Property damage Secure the load with proper wire and ties
lack of training Crush injury Maintain the speed limit ERP, First aid, &
Unsafe Manual handling Pinch points Maintain the safe distance from other vehicle MEDEVAC
2 B B2PA Contact / inform
Uneven road surface Stress and strain Follow manual handling techniques always 1B respective authorities
Obstructed access and Client/Company/ROP/
Roll over the vehicle Do not lift / pull abruptly or drop the pipe; place / move
POS/SFZ
egress Heat stress slowly & cautiously.
Poor weather condition Cut due to sharp Be watchful & cautious of the presence of objects, vehicle,
Defective vehicle and Poor edges equipment, etc., in the surroundings
tyre condition Abrasion Maintain good communication and coordination with team
Never put your body parts under the suspended loads
Page 1 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4
(Potential Severity)
Task / Activity
Recovery Measures
(Letter & Number)
(Severity Rating)
Rating (Control in
PNEUMATIC TESTING
Consequence
Risk Rating
Probability
Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect
place)
(Potential to do Harm) (If the Hazard is released)
Page 2 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4
(Potential Severity)
Task / Activity
Recovery Measures
(Letter & Number)
(Severity Rating)
Rating (Control in
PNEUMATIC TESTING
Consequence
Risk Rating
Probability
Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect
place)
(Potential to do Harm) (If the Hazard is released)
Page 3 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4
(Potential Severity)
Task / Activity
Recovery Measures
(Letter & Number)
(Severity Rating)
Rating (Control in
PNEUMATIC TESTING
Consequence
Risk Rating
Probability
Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect
place)
(Potential to do Harm) (If the Hazard is released)
Page 4 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4
(Potential Severity)
Task / Activity
Recovery Measures
(Letter & Number)
(Severity Rating)
Rating (Control in
PNEUMATIC TESTING
Consequence
Risk Rating
Probability
Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect
place)
(Potential to do Harm) (If the Hazard is released)
Page 5 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4
(Potential Severity)
Task / Activity
Recovery Measures
(Letter & Number)
(Severity Rating)
Rating (Control in
PNEUMATIC TESTING
Consequence
Risk Rating
Probability
Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect
place)
(Potential to do Harm) (If the Hazard is released)
Page 6 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4
Signed: Date :
Approved by:
Page 7 of 7