GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT

HAZARDS AND EFFECTS MANAGEMENT PLAN


Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4

HEMP FOR PNEUMATIC TESTING


HAZARDS AND EFFECTS MANAGEMENT ASSESSMENT

(Potential Severity)
Task / Activity

Recovery Measures
(Letter & Number)
(Severity Rating)

Rating (Control in
PNEUMATIC TESTING

Consequence

Risk Rating
Probability

Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect

place)
(Potential to do Harm) (If the Hazard is released)

Mobilization of Pneumatic
Testing Materials.
 Loading of equipment with the instruction of manual
 Unsecured load of  Personal injury  Maintain the equipment stable and steady and maintain the
equipment  Slip/trip/fall centre of gravity.
 Inexperienced drivers and  Property damage  Secure the load with proper wire and ties
lack of training  Crush injury  Maintain the speed limit ERP, First aid, &
 Unsafe Manual handling  Pinch points  Maintain the safe distance from other vehicle MEDEVAC
2 B B2PA Contact / inform
 Uneven road surface  Stress and strain  Follow manual handling techniques always 1B respective authorities
 Obstructed access and Client/Company/ROP/
 Roll over the vehicle  Do not lift / pull abruptly or drop the pipe; place / move
POS/SFZ
egress  Heat stress slowly & cautiously.
 Poor weather condition  Cut due to sharp  Be watchful & cautious of the presence of objects, vehicle,
 Defective vehicle and Poor edges equipment, etc., in the surroundings
tyre condition  Abrasion  Maintain good communication and coordination with team
 Never put your body parts under the suspended loads

Page 1 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4

(Potential Severity)
Task / Activity

Recovery Measures
(Letter & Number)
(Severity Rating)

Rating (Control in
PNEUMATIC TESTING

Consequence

Risk Rating
Probability

Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect

place)
(Potential to do Harm) (If the Hazard is released)

Setting up of pneumatic  Discuss the STARRT before starting the job


Testing  Personal injury  Undergone adequate training as per the job requirement
 Lack of barrication & signs  Slip/trip/fall  Maintain an effective communication with the crew
 Poor manual handling  Fall of fittings or pipes members
 Obstructing the access and from height  Maintain a good housekeeping at the site always
egress  Crush injury  All defective items should remove immediately from the
 Failure to use mandatory  Pinch points site.
PPEs  Stress and strain  Report all unsafe condition and unsafe behaviour to the
 Poor communication with  Back pain due to poor supervisor
nearby supervisor manual handling  Verify the pressure ratings of hoses, fittings, gaskets, and
 Lack of inspection before  Cut due to sharp edges other manifold materials.
setting up the equipment  Abrasion  Ensure components are assessed for continued use.
 Lack of experience and  Electric shock due to  Use mandatory PPES and specific PPEs if required such
training faulty connection as helmet, gloves, safety goggles, ear plugs etc.
 Inadequate competency  Stress due to poor  Follow manual handling techniques always
 Lack of calibration ergonomic posture  A competent electrician must be available at site
certificate or sticker  Musculoskeletal ERP, First aid, &
 Valid Calibration certificate or sticker must be available MEDEVAC
 Flexible high pressure hose Disorder  Flexible high pressure hose must be secured Contact / inform
not anchored  Stress due to poor 3 B B3PA  Flexible hose assembly must be restrained or shielded to 1B respective authorities
 Electric equipment not ergonomic posture restrict whiplash hazard in the event of a failure/rupture. Client/Company/ROP/
earthed  Leak due to used gasket Restraint may be achieved using whip checks POS/SFZ
 Unavailability of Whip  Eye strain due to poor  Effective communication system must be maintained
checks. lighting in case of night  All electrical equipment must be earthed
 Lack of supervision work  Whip flash for securing the hose must be used whenever
 No test certificate for hoses  Fatigue due to lack of required
and other fittings rest  A competent supervision must be available at the time of
 Improper use of gasket  Land contamination oil operations
 Poor visibility spill  All relevant test certificate must be available for the hoses
 Unsecured pipe or fitting/ and other fittings
connection in the elevated
 Sufficient light must be provided in case of required
location
 Drip tray must be provided in case the use of diesel engine
and avoid contamination due to diesel spill
 Call emergency number if required
 Stop the job in case of adverse weather condition
 Maintain good housekeeping before, during after the job
 Secure the nearby appliances during the hydrostatic test
 Maintain a good posture to avoid ergonomic

Page 2 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4

(Potential Severity)
Task / Activity

Recovery Measures
(Letter & Number)
(Severity Rating)

Rating (Control in
PNEUMATIC TESTING

Consequence

Risk Rating
Probability

Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect

place)
(Potential to do Harm) (If the Hazard is released)

 Diesel leak while filling in  Rectify all faulty electrical connections


the diesel engine  Proper and adequate torqueing should be applied while
 Lack of competent tightening the bolts in the joints
electrician for connecting  Secure all elevating hose connection
electrical appliances 3 B B3PA  Keep away from line of fire
 Inadequate tightening of  Take periodic rest
flange joints
 Poor ergonomic posture
 Bad weather condition
 Poor housekeeping
Performing Pneumatic  Personal injury  Use required ear plug and ear muff if required
Testing  Slip/trip/fall  Stop the pump in case of high pressure leaking
 High pressure leaking  Damaging the property  Signage and barrication should provide for unauthorized
 Lack of signage and  Injury due to loosen bolts entry and warning tape should be “yellow and black”
barrication due to high pressure  Relevant and Mandatory PPE must be worn such as
 Unauthorized entry  Fall of fittings or pipes helmet, gloves, goggle, coverall , etc
 Failure to use mandatory from height  Evacuate and report in case of any emergency situation
PPEs  Crush injury comes
 Rupture of pipe line  Fatality due to flying  Stop the job in case of failure in the hydrostatic
 Rupture of hose and gauge objects generated due to  Remove all defective and damaged fitting and equipment
line high pressure rupture and put ‘Do not use’ Tag ERP, First aid, &
 Flying of loosen fasteners  Pinch points  Tighten all bolts and ensure the tightness of bolts with MEDEVAC
due to high pressure  Structure damage due to torque wrenches Contact / inform
4 B B4PA
 Sudden increase of rupturing of pipe  Never give sudden increase of pressure and put gradual 1B respective authorities
pressure  Stress and strain increase of pressure to avoid rupture of pipe Client/Company/ROP/
 Failure to valve and gauge  Leak due to used gasket  Check every valve and gauge before starting the work. POS/SFZ
 Failure of control valve  Eye strain due to poor  Effective and adequate supervision must be available
 Failure to meet the lighting in case of night before, during the task
emergency situation work  Check the calibrated pressurized gauge always whether
 Lack of supervision  Noise Induced Hearing the pressure is increasing beyond the designed mark or
 Over pressurized plant Loss limit
 Unguarded rotating parts of  Call emergency team in case of such situation arises
Air compressor  Remove the defective and damaged manifold
 Use ear plug and ear muff accordingly
 Maintain a safe distance from the high pressurized line
 All rotating parts should have guard and never remove it.

Page 3 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4

(Potential Severity)
Task / Activity

Recovery Measures
(Letter & Number)
(Severity Rating)

Rating (Control in
PNEUMATIC TESTING

Consequence

Risk Rating
Probability

Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect

place)
(Potential to do Harm) (If the Hazard is released)

 Damaged manifold or  Land contamination  Adequate lighting should provide if required


other fittings due to diesel leak  Never ever encounter in between line of fire
 Defective pipes fittings  Body parts in line of  Use the signage such as “ HYDRO TESTING IN
 Defective and damaged fire area PROGRESS, KEEP AWAY”
pressure valve  Maintain an effective communication with crew members
 Oil Leakage of diesel  Never ever do job if the job hazards are unknown and
engine or air compressor ask the supervisor
due to defects  During the test, from filling up and until the end of
 Incorrect isolation of line pressurization all non-essential people must be out of
the test area
 Provide proper identification for each legitimate crew ERP, First aid, &
on their helmet either by colored tape on safety helmet
MEDEVAC
or stickers to easily identify authorized personnel in the Contact / inform
4 B B4PA working area.
1B respective authorities
 Calibrated safety pressure relief valve to be installed to Client/Company/ROP/
ensure no over pressurization and control sudden POS/SFZ
 Never tamper with or tighten any fittings (i.e.
connections, bolts, hoses, and the like) while under
pressure or during pressure up stage.
 Good coordination is essential to avoid performing
pneumatic test at the same time with other
 During holding time, the system pressure gauge shall be
observed from a safe distance for the indication
of the leakage
 Never tighten connections that are under pressure. If a
leak develops,
 Depressurize to a safe level and then re-tighten.

Page 4 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4

(Potential Severity)
Task / Activity

Recovery Measures
(Letter & Number)
(Severity Rating)

Rating (Control in
PNEUMATIC TESTING

Consequence

Risk Rating
Probability

Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect

place)
(Potential to do Harm) (If the Hazard is released)

 Personal injury  Discuss the STARRT before starting the job


 Damaged pneumatic line  Slip/trip/fall  Obtain valid Permit from PEC prior to start activity
 Wrong calculation of  Damaging the property  Undergone adequate training as per the job requirement
pressure requirement  Injury due to loosen bolts  Maintain an effective communication with the crew
 Defective valve and gauge due to high pressure members
 Lack of competency  Fall of fittings or pipes  Maintain a good housekeeping at the site always
 Lack of training from height  All defective items should remove immediately from the
 Raise the pressure beyond  Injury due to flying site.
the capacity of the objects generated due to  Report all unsafe condition and unsafe behaviour to the
designed marking high pressure rupture supervisor
 Damaged pressure relief  Pinch points  Use mandatory PPES and specific PPEs if required such
valve  Structure damage due to as helmet, gloves, safety goggles, ear plugs etc.
 Lack of valid calibration and rupturing of pipe  Follow manual handling techniques always
other certificates  Stress and strain  Valid Calibration certificate or sticker must be available
 Not barricaded and cordon  Eye strain due to poor  Provide signage and barrication of the activity to alert the
the area lighting in case of night nearby
 Unauthorized entry of work  Never give sudden air pressure in the line and give only
personnel  Noise Induced Hearing gradual increasing the air pressure ERP, First aid, &
 Sudden increase of air Loss  Maintain a safe distance from the high pressurized line MEDEVAC
pressure in the line  Fragmentation into 3 B B3PA specially on each pipe and hose connections Contact / inform
 Rupture of the pipe line and shrapnel.  Must be available effective supervision during the job 1B respective authorities
hose fittings  By reflex action from  All valid calibration documents or sticker must be available Client/Company/ROP/
 Improper anchoring of sudden noise personnel in the site and the test equipment should be in good POS/SFZ
tubing nearby could expose condition and adequately maintained.
 Lack of supervision themselves to injury  Prohibit all unauthorized entry and alert the nearby
 Part under test break-ups  Lightweight materials activities personnel
 Explosive noise and could cause the part to  Maintain a proper anchoring or securing of tubing and the
pressure wave or pulse act as projectile, test equipment shall be examined to ensure that it is totally
develop from gross rapture propelled by the tight
 Equipment motions resulting discharge force  Never tamper with or tighten any fittings (i.e. connections,
resulting from gross rapture bolts, hoses, and the like) while under pressure or during
pressure up stage.
 Good coordination is essential to avoid performing
pneumatic test at the same time with other operation
 written safety plan required securing the exclusion zone for
the duration of the test. Ensure communication is
established between all patrols and incident commander.
 No authorized entry at pressure-testing event unless you
are part of the testing team.
 work will be suspended where pressure testing is being
conducted

Page 5 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4

(Potential Severity)
Task / Activity

Recovery Measures
(Letter & Number)
(Severity Rating)

Rating (Control in
PNEUMATIC TESTING

Consequence

Risk Rating
Probability

Residual Risk
Control Measures Proposed
HSE Hazard Hazard Effect

place)
(Potential to do Harm) (If the Hazard is released)

 During pressure testing events, distinct warning signs,


such as DANGER – HIGH PRESSURE
 TESTING IN PROGRESS must be posted at the test site
and additional locations identified in the job specific safety
plan.
 Shall inspect test heads to confirm all components are in
good condition and meet working Pressure requirements.
 Always use gas cylinders trolley for moving cylinder one
Use of nitrogen gas cylinder location to another location and make sure secured with
chain blocks.
 Wrong handling of  Property damage  Always use protective caps for all gas cylinders
compressed gas cylinder at  Personnel  Use proper transportation facility (up right position/vertical
Injury/Fatality and fall prevention used) store to site.
site  Always check joints by using of leak detection fluid(don’t
 Unsafe transportation of use household soaps or detergents)
 During the test, from filling up and until the end of
nitrogen cylinders to site pressurization, all non-essential people must be out of the
test area
 Provide proper identification for each legitimate crew on
their helmet either by colored tape on safety helmet or
ERP, First aid, &
stickers to easily identify authorized personnel in the
MEDEVAC
working area.
Contact / inform
4 B B4PA  Blinds, valves, flanges and connection joints not pressure 2B respective authorities
tested shall be left un-isolated and expose for examination Client/Company/ROP/
during testing, provided that the valve closure is suitable POS/SFZ
for the propose test pressure
 During holding time, the system pressure gauge shall be
observed from a safe distance for the indication of the
leakage
 Calibrated safety pressure relief valve to be installed to
ensure no over pressurization and control sudden increase
`in pressure during testing
 Ensure there is overpressure protection. The set pressure
of a pressure relief device should not be more than the
greater of the test pressure plus the maximum test
pressure. The device must be tested prior to each strength
test to ensure it is fit for service.
 Third part certificate required for pressure relief valve

Page 6 of 7
GALFAR ENGINEERING & CONTRACTING SALALAH LPG PROJECT
HAZARDS AND EFFECTS MANAGEMENT PLAN
Contract No – 131/ 853
Doc No: SLPG-H-1000-03001-035-001-4

Existing : Information OK Training: Controls Adequate? : OK Controlling Authority : Construction


Manager/ Supervisor

Signed: Date : 02.10.2019


Prepared by: SIBIN

Signed: Date : 02.10.2019


Reviewed by: SAMI DABAS

Signed: Date :
Approved by:

APPENDIX 1: HAZARDS AND EFFECTS MANAGEMENT ASSESSMENT

Page 7 of 7