Introduction
The European electricity grid is undergoing major expansions to
accommodate the switch to renewable sources and more decentralised
energy production. The European Network of TSOs for Electricity
(ENTSOE) foresees a need for approximately 48.000km of new or
upgraded extra high voltage routes over the next 10 years.
Insert Text
Public Acceptance
Not only transmission ……its any shiny new infrastructure!
(Image taken from the ‘Save the Goring Gap’ Campaign Website in relation to the Great Western
Electrification through the Chilterns.)
Overhead Line Colloquium
Public Acceptance
Decision-makers and professionals have become increasingly aware
of the influence that social impact and psychological effects may
have on project acceptability and, consequently, on total costs
(Goodland 1994 Goodland R. 1994. Environmental sustainability and the power sector. Rowan 2009 Refining the attribution of significance in social
impact assessment.)
Eurostars Project
Eurostars supports international innovative projects led by
research and development- performing small- and medium-
sized enterprises (R&D-performing SMEs).
Eurostars is a joint programme between EUREKA and the
European Commission, co-funded from the national budgets of
36 Eurostars Participating States and Partner Countries and by
the European Union through Horizon 2020
The role of SMEs for the economy has never been so important.
Eurostars aims to bring increased value to the economy, higher
growth and more job opportunities.
Provides Grant funding (60%) for projects that are successfully
meet the target thresholds.
Overhead Line Colloquium
Eurostars Project
We successfully secured a Eurostars project for our ComPylon
project.
Collaboration between Bystrup, Allied & Norco Composites
Project is to develop and test a fully working prototype of the
Composite Pylon.
Initially our aims were for a 400kV Pylon however we believe a
132kV would be more feasible and practical.
Aim higher
Overhead Line Colloquium
ComPylon Structure
Overhead Line Colloquium
Surge impedance, ZC , of fully composite pylon is lower than Eagle and Donau pylons.
Since IC is larger than IMIC , therefore, theoretically no lightning current can strike the phase
conductor.
Therefore lower is better! Less attractive to Lightning
Electrical Requirements Overhead Line Colloquium
Mechanical Design
Elasticity Lateral
Vertical Force
Load
Torsion
Bending
Moment
Tension
Force
Buckling
Longitudinal
Global
Stability Shear
Compression
Overturning Forces
Moment
Loading
Overhead Line Colloquium
Unloaded Wind
Interface Design
Insert Text Insulator Resilient joint requirements:
>1000kN – Tension
& Compression
>200kNm Torsion
>1350kNm Bending
Overhead Line Colloquium
Torsional & Shear Capability
Overhead Line Colloquium
Work Packages
36 Month Project
(WP1) Project Management Scope
(WP2) Specifications and preliminary design
(WP3) Mechanical and Electric Calculations and Analyses
(WP4) Production and Assembly of Prototype Pylon
(WP5) Mechanical and Electrical Testing
(WP6) Exploitation & Dissemination
Overhead Line Colloquium
Questions?