Welcome to Supplier Training Week!

Please Sign the


May 4-8, 2015
Roster!

3CPR Program Training


Supplier Training Week
Christine Kavka
3CPR Program Manager
Supplier Operations
Process, Methods and Program Management
3CPR Program Overview

2
3CPR Program Overview

To manage Supplier-responsible product nonconformance


issues.
• This process is applied to prevent additional
nonconforming product from reaching the FCA
manufacturing facility.
• 3CPR utilizes a single sourced Third Party Service
Provider who will conduct containment and sorting of
Supplier product.

3
3CPR Program Overview

3CPR covers sorting and containment of nonconforming product at FCA


US (NAFTA) plants, sequencers (ILC’s), modular facilities, Mopar
distribution centers and supplier locations.
• Supplier is financially responsible for the sort
• Includes all Supplier Requested (Proactive) sorting and
containment
• Includes NAFTA supplier parts going to other regions of the world
(IRF – Inter-Regional Flow: Italy, Brazil, China, etc.)
• Does not include Engineering (IAA) Rework, Yard Hold/Audits and
Sub-Surface Porosity
• Approved Engineering (IAA) rework may be done before a 3CPR,
but a 3CPR must be performed after any Engineering (IAA) rework
is completed
• Non-Engineering (IAA) rework (reworking a part to bring it back into
print specification) is within 3CPR’s scope
4
3CPR Program Overview

• All projects are managed through the automated web based


application located at www.esupplierconnect.com and follow the
published 3CPR Policies.
• You must ask your internal esupplierconnect administrator for access
to the 3CPR application.

5
3CPR Program Overview

Provider Name (SMLC) Provider phone Number Provider Website Provider Email Assigned FCA Plant

PIC, A Trigo Company (54969) 877-742-8664 www.thepicgroup.com pic3cpr@thepicgroup.com Conner Assembly Plant
Dundee Engine Plant
Indiana Transmission Plant 1
Indiana Transmission Plant 2
Kokomo Transmission Plant
Mack Engine (1 & 2)
Sterling Heights Assembly Plant
Sterling Stamping Plant
Tipton Transmission Plant
Toledo Assembly Complex (Toledo
Supplier Park & Toledo North
Assembly Plant)
Toledo Machining
Trenton Engine Plant
Trenton South Engine Plant
Warren Stamping Plant
Windsor Assembly Plant

Visual Resources, LLC (65040) 877-224-8584 www.visualresourcesllc.com 3cpr@visualresourcesllc.com Belvidere Assembly Plant
Jefferson North Assembly Plant
Warren Truck Assembly Plant

Stratosphere Quality (63947) 855-845-9460 www.stratospherequality.com 3cpr@stratospherequality.com Baltimore Transformation Center


Brampton Assembly Plant
Mopar Parts Depots
Saltillo Truck Assembly Plant
Saltillo Van Assembly Plant
Saltillo Engine Plant
Saltillo South Engine Plant

PTI (15895) 313-365-3999 www.ptiqcs.com 3cpr@ptiqcs.com Toluca Assembly Plant

Formel D (10014) (49)22-41-996-0 www.formeld.com 3cpr@formeld.com Italy IRF & EMEA Level 2 Projects

Dream Hill (65451) (82)32-326-5590 www.drhill.co.kr 3cpr@drhill.co.kr Korea Level 2 Projects

Trigo (65577) +33 (0)1 41 44 05 85 www.trigo.net 3cpr@trigo.net Pernambuco, Brazil Plant


Rest of World (APAC, LATAM,
EMEA) IRF & Level 2 Projects

6
3CPR Program Overview

7
3CPR Program Overview

3CPR Provider sorts FCA inventory (pipeline), Supplier sorts at supplier


plant
• Provider sorts all parts past Supplier’s dock and 100% of Supplier’s
clean Certified Shipment
• Supplier sorts all parts to all plants before shipping until Provider finds a
clean Certified Shipment

8
3CPR Program Overview

3CPR Provider sorts at Supplier’s plant (L2 includes L1 unless L1 is


waived)
• Provider sorts all parts past supplier’s dock and all parts to all plants
prior to shipment for 15 to 999 days from supplier’s Permanent
Corrective Action (PCA) implementation date
• Exit clock resets if nonconforming part is found after PCA

9
3CPR Program Overview

External Engineering support


• Also known as CSL3 in EMEA
• Scope of project and corrective actions to be determined by SQ
management, SQE, Supplier, and 3rd party engineer
• Length of project dependent upon the corrective actions required
• Level 2 sorting may or may not be included or necessary
• Will be included in 3CPR system (implementation date TBD)

10
3CPR Program Overview

• A Supplier requested sort that will be created in the 3CPR system that
is neither mandated by the plant nor punitive against the Supplier’s
quality scorecard.
• These projects must follow the 3CPR process lifecycle, with the same
steps and same requirements as an FCA initiated 3CPR.

11
3CPR Program Overview

• Common Part 3CPR projects refer to Supplier parts that affect multiple
FCA Plants
• Each affected FCA plant will have a L1 sort initiated when the 3CPR
system reports that a Supplier part non-conformance affects more than
one FCA plant.
• Only the initial 3CPR project will affect the supplier scorecard. All
subsequent Common Part 3CPR projects will not affect the supplier
scorecard.

12
3CPR Program Overview

3CPR projects do impact a Supplier’s External Balanced Scorecard


(EBSC) Quality score.

• A 5 point deduction is taken for each Level 1 project initiated

• A 10 point deduction is taken for each Level 2 project initiated

• A 10 point deduction will be taken for each Level 3 project initiated

• Deductions remain on the scorecard for 6 months

• Exceptions: Supplier Requested and Common Part projects

13
3CPR Program Overview

• Sampling or “Lot Sorting” is the activity of not sorting all material or a


family of part numbers in the pipeline.
• The 3CPR Provider is to sort 100% of all inventories in the pipeline
back to the Supplier plant.
• Sampling or "lot" sorting is prohibited.

14
3CPR Program Overview

15
3CPR Program Overview

The Supplier must support 3CPR activity within 24 hours


of project initiation with both:
1. Input of a valid PO # in the 3CPR Details page, and
2. Provide to the 3CPR Provider an electronic copy of the
fully funded & signed PO with a minimum value of
$5000 (US & CDN), $2000 USD (MEX, LATAM &
APAC), or €5000 (EMEA).

16
3CPR Program Overview

If a Supplier fails to provide a PO to the 3CPR Provider within 24 hours of


project initiation, the Supplier is subject to the following:

• Loss of clean point at the FCA plant


• Loss of Supplier certified shipment status and date (if already sorted)
• Loss of L2 Kick Off Meeting Information
• Loss of inspection team arrival
• Loss of Permanent Corrective Action 7-step implementation date (if input)
• Loss of exit clock count down
After 24 hours, the Supplier will be locked out of the 3CPR project and
sorting will stop, leaving the FCA plant unprotected.
To reopen the project, the Supplier must provide a copy of the PO to the
3CPR Provider. The Provider will enter the PO into the system, unlock the
project and resume sorting.

17
3CPR Process for Level 1 & Level 2

Project Notification Email

18
3CPR Process for Level 1 & Level 2

19
3CPR Level 1 Process

20
3CPR Level 1 Process

• The 3CPR L1 scope shall cover all safely accessible products beyond
the responsible Supplier of record manufacturing facility.
• This includes but is not limited to ILC’s, Sub-assembly Suppliers who
have consigned FCA product, Sequence and Kit Service Facilities,
Modular Suppliers, and other similar facilities.
• All facilities where FCA product may reside are subject to the same
requirements and expectations as included in the 3CPR Policies.
• These types of facilities may be listed in a project as an ILC or Modular
for purpose of identifying the affected pipeline for a given 3CPR
activity.

21
3CPR Level 1 Process

• The Supplier’s first Certified Shipment MUST be 100% sorted by the


3CPR-P and must be found 100% clean.
• If the Certified Shipment is not clean, the Provider will notify FCA and
the Supplier of the Dirty Certified Shipment.
• The project will be escalated to a 3CPR Level 2 and the Provider will
continue to sort incoming shipments until the Provider’s L2 certified
material is received at the FCA plant.

22
3CPR Level 1 Process

23
3CPR Level 1 Process

24
3CPR Level 2 Process

25
3CPR Level 2 Process

• Containment cannot be broken once the 3CPR Provider has certified


product for shipment. This includes repackaging/resorting/reworking
certified material.
• If a Supplier needs to break containment, the material must be
recertified in ready to ship condition by the 3CPR Provider. If sorting of
ready to ship material is not possible, then the Provider, Supplier and
FCA SQ Project Initiator shall agree to an upstream inspection point
and upstream criteria to be inspected which allows the shipment to
remain certified.
• The 3CPR Provider is required to observe all packaging processes to
preserve 3CPR containment certifications. This requires a Provider
inspector to be on the Supplier shipping dock when 3CPR material is
being shipped.

26
3CPR Level 2 Process

• The PCA is the action determined to be the best of all alternatives in


addressing and permanently eliminating the root cause.

• The PCA shall be approved by FCA Supplier Quality prior to


implementation.

• Once approval is achieved, the PCA implementation date is required to


be entered into the 3CPR application.

• The implementation date activates the 3CPR Level 2 project exit clock.

• If a nonconforming part is identified after PCA implementation, the


project exit clock will reset and the countdown will restart.

27
3CPR Level 2 Process

The Kick-Off Meeting and Inspection Team fields are completed by the 3CPR-P.
28
3CPR Level 2 Process

29
3CPR Email Warnings & Prevention

1. No Valid PO: Warning if PO isn’t accepted by 3CPR-P in 3CPR WBS with 24 hrs of
project initiation
Prevent: Enter a valid Purchase Order in the project on day one to avoid a warning
notice
2. No Certified Shipment (CS) Input: Warning after 24 hours (FCA notified after 3 days)
Prevent: Enter known or estimated certified shipment date on day one to avoid a
warning notice
3. Dirty Supplier Certified Shipment: Warning if certified shipment input as dirty
Prevent: Make certain certified shipments are without any nonconformances or
required rework
4. L2 repeat non-conformance: Warning if Level 2 has a repeat non-conformance
Prevent: Ensure parts presented to L2 team are reject free (supplier pre-sort
recommended)
5. No KO meeting: Warning if L2 KO meeting not input in 48 hrs of approved supplier
valid PO
Prevent: Supplier give valid PO, 3CPR Provider approves, 1st day of L2 project &
KO meeting within 2 days

30
3CPR Provider Contact Information

For questions or to ask for assistance, please contact:

3CPR@fcagroup.com

31
3CPR Program Training

32
3CPR Program Training

Please complete the evaluation


on the mobile app!