Sei sulla pagina 1di 2

MAEDA VIETNAM CO., LTD.

PROJECT : SPVB BN END GAME WAREHOUSE 2016

PJ CODE : 2015-40 REV : 0


CONSTRUCTION SCHEDULE (MONTHLY)/JULY.2016 REF :
2016.04.29-SPVB BN_MASTER
SCHDL (R3)
DATE : June 28, 2016

JUNE.2016 JULY.2016 AUG.2016


Item Activity In-charge 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE

B CONSTRUCTION WORK

WAREHOUSE
B-1 DELIVERY STEEL STRUCTURE DELIVERY

B-2 ZONE 1,2,3,4,5 (22-24A/M-F) ERECTION ERECTION ZONE 1->ZONE 4

B-4 ZONE 5 (NEAR OFFICE AREA) ZONE 5

B-3 ZONE 6 (21-22/M-F) ZONE 6 (CONNECT PURLIN)

B-4 ZONE 7 (LOADING BAY) ZONE 7 (LOADNING BAY)

B-5 BRACING, ACCESSORIES FOR STEEL STRC BRACING, ACCESSORIES FOR STEEL STRC

B-6 ROOFING WORK ROOFING WORK

B-7 FOUNDATION & GROUND BEAM FOUNDATION & GB 21-24A/G+11000 ->F)


(21-24B/G+11000->F)
B-8 FOUNDATION & GROUND BEAM FOUNDATION & GB 24A->24B/G->F PILE CAP OF SLAB

(24A-24B/ G->F)
B-9 SLAB WORK LEVELING & COMPACTION FOR SLAB

B-10 SLAB WORK UG DRAINAGE SYSTEM INSIDE WH

B-11 REMOVE AXIS LINE 21

REST HOUSE & MOTORBIKE PARK


B-11 FINISHING WORK FINISHING WORK

B-12 PAINTING WORK PAINTING WORK

B-13 MISC WORK FINISHING MISC WORK FINISHING

B-14 CLEANING CLEANING

B-15 LED LIGHTING INSTALL ORDER LED LIGHT INSTALL

B-16 MVC INTERNAL INSP MVC INSP

B-17 REPAIR DEFECT WORK REPAIR DEFECT WORK

B-18 INSP BY OWNER & HAND OVER CLIENT INSP

EXTERNAL WORK
B-19 DRAINAGE SYSTEM DRAINAGE SYSTEM (PC PIPE & OPEN GUTTER)

B-20 CONCRETE ROAD EXTERNAL ROAD WORK


MAEDA VIETNAM CO., LTD. PROJECT : SPVB BN END GAME WAREHOUSE 2016

PJ CODE : 2015-40 REV : 0


CONSTRUCTION SCHEDULE (MONTHLY)/JULY.2016 REF :
2016.04.29-SPVB BN_MASTER
SCHDL (R3)
DATE : June 28, 2016

JUNE.2016 JULY.2016 AUG.2016


Item Activity In-charge 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE

C M&E WORK
TEMPORARY WORK
C-1 TEMPORARY STORAGE & OFFICE

C-2 ORDER MATERIALS


LIGHTING

CONDUIT

CABLE

EX HAUST FAN (ROOF TYPE)

SUBMERSIBLE PUMP
WAREHOUSE
C-3 REPAIR EXISTING UNDERGROUND SYSTEMS
(IF NEED)
C-4 UNDERGROUND CONDUIT & SLEEVE

C-5 ELECTRICAL SUPPORT FABRICATE FOR TRUNKING, LIGHTING …

UNDERGROUND FOR EXTERNAL LIGHTING

C-6 MECHANICAL SUPPORT FABRICATE FOR SUBMERSIBLE PUMP, EXHAUST FAN …

UNDERGROUND PIPING FOR SUBMERSIBLE PUMP

REST HOUSE
C-7 LIGHTING & FAN.. WIRING INSTALLATION FANS INSTALLATION LAMP

C-8 SOCKET OUTLET WIRING EQUIPMENT

C-9 TRUNKING & DISTRIBUTION PANEL DB-PANEL CONECT TO EXISTING SYSTEM

C-10 SANITARY INSTALLATION SANITARY

MOTORBIKE/CAR PARK
C-11 CONDUIT & WIRING FOR LIGHTING WIRING INSTALLATION LAMP

REMARKS :

Prepared by (MVC) ;
Date : Jun 28/ '2016 Name : DO QUANG DUNG Tile : SITE MANAGER Signature :
Issued by (MVC) ;
Date : Jun 28/ '2016 Name : LE VINH THUY Tile : PROJECT MANAGER Signature :
( ✘ TICK AS APPLICABLE ) FORM REF : CS1M REV. : 03 / 2007.APR.01