Observation on Design Drawings of Roads and Box Culverts submitted by GDCL for approval

A) Box Culverts:

a) RCC Details of Box Culvert:

1. With reference to drawing nos. WB/PWD/DYC/CULVERT/18, 20 & 21, the usage of steel
25mm & 30mm  bar mark 3 & 4 (Drawing nos. 18 & 21) and Bar Mark 2, 3, 4 & 6 (drawing
No 20).

We suggest, without changing area of steel, may be used lower dia. rebar by reducing bar
spacing.

2. OPC Grade 43 cement conforming to IS: 8112 may be referred for M25 Grade concrete IS:
269 for OPC Grade 33, is obsolete.
3. Note 4, 5 & 11 are irrelevant.
4. Splice length (Lap in Reinforcement) in Note 6 (a) is not specific for compression and tension
zones.
5. In Load Design Calculations of all the Box Culverts considered Load per unit area for two
tracks instead of Load per unit area for Single track.

b) General Arrangement Drawing of Box Culvert:

1. With reference to the drawing nos. WB/PWD/DYC/CULVERT/01 to 17, shown stone pitching
on raft to the invert level of the culvert.

We suggested sandy soil filling with top 300mm crushed stone pitching with PCC M15 void
filling (Sketch attached).

2. Refer the Plan & Profile Drawings. Missing locations of the Box Culvert on Service Roads
tabulated as below,

S. No. Chainage Description Remarks

1 49+338 Both side Service Road Box Culverts required WB/PWD/DYC/P&P/04

2 49+568 RHS Service Road Box Culvert required WB/PWD/DYC/P&P/05

3 50+293 Both side Service Road Box Culverts required WB/PWD/DYC/P&P/06

4 56+168 Both side Service Road Box Culverts required WB/PWD/DYC/P&P/14


5 56+717 RHS Service Road Box Culvert required WB/PWD/DYC/P&P/15

B) Road Drawings:

1. Also refer,

Drawing No Part Of Drawing Observation

WB/PWD/DY
TCS-01 & TCS-02 Offset between pavement layers to be mentioned
C/TCS/01

WB/PWD/DY
TCS-02 Utility corridor is shown within the slope of S/Road
C/TCS/01

WB/PWD/DY
TCS-01
C/TCS/01

WB/PWD/DY
TCS-03
C/TCS/02
i) Location and total length of the Toe wall
is not matching with the schedule (item
WB/PWD/DY no 12.4)
TOE WALL
C/TCS/03 ii) TCS with both sides Toe wall may also
be provided.

WB/PWD/DY Applicable chainage list is not matching with the


TCS-05
C/TCS/03 Schedule-B, corrected accordingly.

2. Horizontal Curve Details is not provided in the Plan.


3. Horizontal and Vertical Profile Details in tabular form is not in Drawing.