1 Galian
Pondasi Bangunan 0.3x0.3x0.3 m3 0.27 10.00 0.30
2 Urugan
Building & Corridor m3 18.51 1.00
3 Pemadatan
Pondasi Bangunan m2 0.90 10.00 0.30
Building m2 64.00 1.00
Coridor m2 28.57 1.00
4 Lantai Kerja, t = 5 cm
Building m2 64.00 1.00
Coridor m2 28.57 1.00
5 Struktur Kayu
Balok 6/12
Kolom ( Balok 6/12) m 25.00 10.00 2.50
Sloof (Balok 6/12) m 44.00 1.00 44.00
Ring Balok (Balok 6/12) m 44.00 1.00 44.00
Kuda2 (6/12) m 58.42 5.00 11.68
Kayu 5/7
Wall Frame (5/7) m 43.40 7.00 6.20
Top of Roof m 17.00 1.00 17.00
Usuk m 167.93 1.00 167.93
Rangka Ceiling m 240.00 1.00 240.00
6 Dinding
Vertikal
Grid 1/C-B m2 8.80 1.00 4.00
Grid 2/C-B m2 8.80 1.00 4.00
Grid 3/B-A m2 8.80 1.00 4.00
Grid D/C-A m2 17.60 1.00 8.00
Horisontal
Grid A/3-4 m2 8.80 1.00 4.00
Grid B/3-1 m2 17.60 1.00 8.00
Grid C/4-1 m2 26.40 1.00 12.00
7 Asbes
Asbes 150 x 105 (45.000) m2 41.12 2.00
0.30 0.30
0.30 0.30
0.20 92.57
0.30
64.00
28.57
0.30
64.00
28.57
-
-
-
-
-
-
-
outline 40 m
vertikal 100 m
horisontal 100 m
2.20
2.20
2.20
2.20
2.20
2.20
2.20
2.57 16.00
Description Unit Koefisien Unit Rate Total Amount
1 m3 Galian Tanah
Upah : m3 1 450,000.00 450,000.00
Total 450,000
Rounded 450,000
1 m3 Urugan Tanah
Upah : m3 1 225,000.00 225,000.00
Total 225,000
Rounded 225,000
1 m2 pemadatan
Upah : m2 1 75,000.00 75,000.00
Total 75,000
Rounded 75,000
1 m3 Lantai Kerja
Material :
Cement Holcim zak 2.100 90,000.00 189,000.00
Concrete sand m3 0.322 375,000.00 120,780.00
Split m3 0.589 375,000.00 220,692.60
Labour m3 1.000 300,000.00 300,000.00
Total 830,473
Rounded 830,470
per m2 41,523.50
1 unit pintu
Material :
Kayu Meranti 5/7mm m3 0.025 7,275,000.00 178,237.50
Plywood 9mm lbr 0.672 225,000.00 151,169.04
Nail kg 0.250 22,500.00 5,625.00
Engsel unit 3.000 37,500.00 112,500.00
Grendel unit 2.000 45,000.00 90,000.00
Tools ls 1.000 15,000.00 15,000.00
Laobur unit 1.000 150,000.00 150,000.00
Total 702,532
Rounded 702,530
1.50
300,000.00 300,000.00 300,000.00
Total 300,000
Rounded 300,000
1.50
150,000.00 150,000.00 150,000.00
Total 150,000
Rounded 150,000
1.50
50,000.00 50,000.00 50,000.00
Total 50,000
Rounded 50,000
1.50
60,000.00 60,000.00 126,000.00
250,000.00 250,000.00 80,520.00
250,000.00 250,000.00 147,128.40
200,000.00 200,000.00 200,000.00
Total 553,648
Rounded 553,650
27,682.50
1.50
4,850,000.00 4,850,000.00 38,412.00
15,000.00 15,000.00 5,250.00
10,000.00 10,000.00 10,000.00
50,000.00 50,000.00 50,000.00
Total 103,662
Rounded 103,660
1.50
4,850,000.00 4,850,000.00 17,823.75
15,000.00 15,000.00 3,750.00
10,000.00 10,000.00 10,000.00
50,000.00 50,000.00 50,000.00
Total 81,574
Rounded 81,570
1.50
150,000.00 150,000.00 51,229.51
15,000.00 15,000.00 3,750.00
10,000.00 10,000.00 10,000.00
50,000.00 50,000.00 50,000.00
Total 114,980
Rounded 114,980
1.50
4,850,000.00 4,850,000.00 118,825.00
150,000.00 150,000.00 100,779.36
15,000.00 15,000.00 3,750.00
25,000.00 25,000.00 75,000.00
30,000.00 30,000.00 60,000.00
10,000.00 10,000.00 10,000.00
100,000.00 100,000.00 100,000.00
Total 468,354
Rounded 468,350
1.50
85,000.00 85,000.00 29,030.05
15,000.00 15,000.00 3,750.00
10,000.00 10,000.00 10,000.00
50,000.00 50,000.00 50,000.00
Total 92,780
Rounded 92,780
1.50
500,000.00 500,000.00 500,000.00
10,000.00 10,000.00 10,000.00
45,000.00 45,000.00 45,000.00
Total 555,000
Rounded 555,000
1.50
70,000.00 70,000.00 31,111.11
15,000.00 15,000.00 15,000.00
10,000.00 10,000.00 10,000.00
50,000.00 Total 56,111
Rounded 56,110
Item Item Description Quantity Unit Rate
BUILDING
Cat
Dinding 193.60 m2 67,500.00
Ceiling 64.00 m2 67,500.00
Total
PAGAR
Total
RAP
Amount Rate Amount
183,375,518.30 125,448,657.03
5,898,525.28 12,023,933.60
189,274,043.58 137,472,590.63