Sei sulla pagina 1di 3

To Do List

For: [Name]
[42]

Due
Status Priority PICK Owner Project / Task Notes
Date
Easy / Low
Planning high 11/20/11 Jack Task Name 1 Some notes about Task 1
Value
Easy / High Some notes about Task 2 thas are long
Approved - 11/21/11 Jill Task Name 2
Value enough to span two different lines
Pending Hard / Low
low 11/22/11
Review Value

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

To Do List Template by Vertex42.com


Status Priority PICK
- - -
Planning high Easy / Low Value Add
Additems
itemstotothese
theselists
liststotomodify
modifywhat
whatisis
Pending Approval med Easy / High Value shown in the corresponding drop-down
shown in the corresponding drop-down
lists
listsininthe
theToDoList
ToDoListtable.
table.This
Thistechnique
technique
Approved low Hard / High Value
makes
makes use of dynamic namedranges
use of dynamic named ranges
In Progress Hard / Low Value and
Pending Review anddatadatavalidation.
validation.
On Hold The
ThePICK
PICK(Possible,
(Possible,Implement,
Implement,
Completed Challenge,
Challenge,Kill)
Kill)column
columnisisfor
forranking
ranking
tasks
tasks according to Difficulty(Easy
according to Difficulty (Easyoror
Hard)
Hard)and
andPayoff
PayoffValue
Value(Low
(LowororHigh).
High).
See
See the PICK Chart pageon
the PICK Chart page on
Vertex42.com
Vertex42.comfor formore
moreinformation
informationabout
about
this
thismethod.
method.
odify
odifywhat
whatisis
drop-down
drop-down
is technique
his technique
d ranges
ed ranges

ent,
ment,
rranking
ranking
Easy
(Easyoror
wororHigh).
High).
n
mation
mationabout
about

Potrebbero piacerti anche