The document outlines a scope of work for a building project divided into demolition work, new work, and mechanical & electrical work. It details the floors and areas where work will take place, such as walls, floors, roofs, and landscaping. Responsibilities are assigned to different people for elements like demolition of walls and floors on the ground and first floors, new construction of walls, floors, and roofs in locations like the food court, hall and new shop lot. Mechanical work includes lamps, PA systems and projectors in the hall overseen by Anis, while loose furniture like tables and chairs in the hall will be handled by Syuhada.
The document outlines a scope of work for a building project divided into demolition work, new work, and mechanical & electrical work. It details the floors and areas where work will take place, such as walls, floors, roofs, and landscaping. Responsibilities are assigned to different people for elements like demolition of walls and floors on the ground and first floors, new construction of walls, floors, and roofs in locations like the food court, hall and new shop lot. Mechanical work includes lamps, PA systems and projectors in the hall overseen by Anis, while loose furniture like tables and chairs in the hall will be handled by Syuhada.
The document outlines a scope of work for a building project divided into demolition work, new work, and mechanical & electrical work. It details the floors and areas where work will take place, such as walls, floors, roofs, and landscaping. Responsibilities are assigned to different people for elements like demolition of walls and floors on the ground and first floors, new construction of walls, floors, and roofs in locations like the food court, hall and new shop lot. Mechanical work includes lamps, PA systems and projectors in the hall overseen by Anis, while loose furniture like tables and chairs in the hall will be handled by Syuhada.
CHARGE GROUND WALL FOOD COURT FIZA FLOOR FLOOR HALL AZREEN WALL HALL & TOILET FIZA
LANDSCAPE MIDDLE OF THE FIZA
DEMOLITION BUILDING WORK FIRST FLOOR HALL ROOF LIFT (NEAR ERRA ESCLATOR)
DOOR HALL ERRA
ELEMENT FLOOR WORK LOCATION/ AREA PERSON IN
CHARGE GROUND WALL FOOD COURT GUDIE FLOOR FLOOR FOOD COURT AZREEN ROOF SPACE FRAME SYIKIN LANDSCAPE BUS PARKING SYIKIN FIRST FLOOR FLOOR NEW SHOP LOT, AZREEN HALL FRAME HALL AFIQ NEW SHOP NEW WORK LOT WALL / GLASS NEW SHOP (REPLACE GUDIE THE LANDSCAPE HALL ROOF SPACE FRAME SYIKIN DOOR HALL ERRA
ELEMENT FLOOR WORK LOCATION / PERSON IN
AREA CHARGE HALL MECHANICAL & FIRST LAMP NEW SHOP ANIS LOT ELECTIRCAL FLOOR PA SYSTEM HALL ANIS PROJECTOR HALL ANIS SUNDRISE FIRST FLOOR STAGE HALL ANIS LOOSE FIRST FLOOR TABLE HALL SYUHADA FURNITURE CHAIR HALL SYUHADA