LIGHT POLE
OF 14.0m HEIGHT
DATE: 16-Dec-15
FOUNDATION DESIGNS
0 For approval
Rev. Revision Description Date
Consultant:
Owner:
MUSANDA PROJECT
Project:
Foundation Design
Client:
Project:
Document:
WIND LOADING ANALYSIS - Chimneys, Stacks, and Vertical Tanks, Light Poles
Per ASCE 7-05 Code for Cantilevered Structures Classified as Other Structures
Input Data: D
1 of 2 12/16/2015 10:12 AM
"ASCE705W.xls" Program
Version 1.1
Parameters Used in Both Item #2 and Item #3 Calculations (from Table 6-2):
^ = 0.143
b^ = 0.84
(bar) = 0.250
b(bar) = 0.45
c= 0.30
l= 320 ft.
(bar) = 0.333
z(min) = 30 ft.
2 of 2 12/16/2015 10:12 AM
"POLEFDN.xls" Program
Version 1.9
Input Data:
Weight of light pole including Solar palnel Aprox ,= 6.50 kN x 1.40 = 9.10 kN (Factored)
Horizontal Base Shear = 1.10 kN 1.10 kN (Ref. wind cal.)
Base Moment due to Wind Pressure = 10.85 kN 10.85 kN-m (Ref. wind cal.)
Soil Data:
Unit Weight of Soil, = 0.115 kcf 18.00 kN/m3 H=45.93176' Ground
Angle of Internal Friction, = 30.00 deg. 30.00 deg. Line
Depth to Resisting Surface, h2 = 0.000 ft. 0.000 m h1=0.328084'
Allow. Soil Bearing Pressure, Pa = 2.100 ksf 100.55 kN/m2 h2=0'
.
Pier Loadings:
Axial Load, Pv = 2.040 kips 9.07 kN Resisting
Horizontal Load, Ph = 0.250 kips 1.11 kN Surface L=6.15'
Distance from Ph to Top/Pier, H = 45.932 ft. 14.000 m
Externally Applied Moment, M = 8.000 ft-kips 10.85 kN-m Pier
Results: D=4.92126'
1 of 2 12/16/2015 10:32 AM
"POLEFDN.xls" Program
Version 1.9
Pier Plain Concrete Stresses: (Plain concrete allowable stresses from ACI 318-02, Chapter 22)
Axial Compressive Stress:
fa = 3.23 psi 0.02 N/mm² fa = (Pv+*D^2/4*(h1+h2+a/2)*0.15)/(*(D*12)^2/4)*1000
Combined Compression Stress: ( = 0.55 and divide ACI Code USD value by 1.6 for ASD)
fc = 13.76 psi 0.09 N/mm² fc = fb+fa (compression)
Fc(allow) = 1460.94 psi 10.07 N/mm² Fc(allow) = 0.85**(f'c*1000)/1.6 Fc(allow)>=fc, O.K.
Combined Tension Stress: ( = 0.55 and divide ACI Code USD value by 1.6 for ASD)
ft = 7.29 psi 0.05 N/mm² ft = fb-fa (tension)
Ft(allow) = 121.53 psi 0.84 N/mm² Ft(allow) = 5**SQRT(f'c*1000)/1.6 Ft(allow)>=ft, O.K.
Shear Stress: (divide ACI Code USD value by 1.6 for ASD)
fv = 2.12 psi 0.01 N/mm² fv = V(max)/(*(D*12)^2/4)*1000 (shear)
Fv(allow) = 58.93 psi 0.41 N/mm² Fv(allow) = 4/3*SQRT(f'c*1000)/1.6 Fv(allow)>=fv, O.K.
D R* Pc Pt V(max) M(max)
2 of 2 12/16/2015 10:32 AM
TABLE OF CONTENTS
BASE PLATE DESIGN
Client:
Project:
Document:
General Parameters
Loads
Load P Mx My Load
Case (kN) (kNm) (kNm) Factor
1 7.65 1.5
10.35 1.6
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
BS5950 - 1990 X
L=450.0
L1=115.5 219.0
a4=60.0
W=450.0
219.0
Y Y
W1=115.5
a3=60.0
a1=60.0 a2=60.0
X
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
11.3 mm 44 kN 5 44 kN
-4.00
-2.00
20.0
40.0
60.0
80.0
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
2.00
4.00
6.00
Distance (mm)
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
2.0 mm
44 kN 5 44 kN
10.0 mm
-4.00
-2.00
20.0
40.0
60.0
80.0
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
2.00
4.00
6.00
Distance (mm)
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
450
116 219
219x3.5 CHS
450
219
330
4M27 gr 8.8
60
60 Plan 60
20
Elevation
DETAIL 1
EMBEDMENT CALCULATION
EMBEDMENT CALCULATION
Per Building Code Requirements for Structural Concrete ( ACI 318-08)
Design of (4) Stud Embed Plate Anchorage per Appendix D
Job Name: Subject: Date: 12/16/2015 9:33
Job Number: Originator: Checker:
Dimensions:
bx1 = 2.362198 in. 60.00 mm PL Edge Distance
bx2 = 2.362198 in. 60.00 mm PL Edge Distance
by1 = 2.362198 in. 60.00 mm PL Edge Distance
by2 = 2.362198 in. 60.00 mm PL Edge Distance
sx1 = 11.81099 in. 300.00 mm Spacing in x-dir.
sy1 = 11.81099 in. 300.00 mm Spacing in y-dir.
cx1 = 23.62198 in. 600.00 mm Edge Distance to Conc.
cx2 = 23.62198 in. 600.00 mm Edge Distance to Conc. Stud Reactions (k)
cy1 = 23.62198 in. 600.00 mm Edge Distance to Conc. Axial Rz Shear Rh
cy2 = 23.62198 in. 600.00 mm Edge Distance to Conc. #1: -0.45 0.88
#2: -0.45
0 45 0.88
0 88
Parameters: #3: -0.45 0.88
Anchor Dia., db = 7/8 in. 22.23 mm Eff.Stud Anchor Diameter #4: -0.45 0.88
Concrete, f'c= 5000 psi 34.47 N/mm² Specified Compressive strength of Concrete
Anchor, fy = 65 ksi 448.16 N/mm² Specified Yield strength of anchor steel
Anchor, futa = 65 ksi 448.16 N/mm² Specified Tensile strength of anchor steel
Steel Element = Ductile (Section D.1)
Embedment, hef = 29.52747 in. 750.00 mm The overall depth through which the anchor transfers force to and from the concrete.
Thickness, h a = 78.74 in. 2000.00 mm Thickness of member in which an anchor is located,
Supp. Reinf.? Yes Potential Failure Surfaces crossed by supplementary reinforcement (Section D.4.2.1)
Cracking Anticip.? No Cracking at service levels (Section D.6.2.7 Case? Case 2
Seismic (Chapt.21) No Anchors are located in structure assigned to Seismic Design Category C, D, E, or F. (Sect. D3.3)
Concrete Type = Normalwt (Section 2.2)
Per Sect. D.6.2.3? Yes For cast-in headed studs that are continuously welded to steel attachments having a minimum
thickness of > 3/8" and db/2 provided that: (a) spacing > 2.5 in. and (b) reinforcement is provided
at the corners if ca2 < 1.5hef.
Results:
1. Steel strength of anchor in tension: (Section D.5.1)
Nsa =Asefuta (Equation D-3)
Ase, N = 0.6 in
2 Effective Cross Sectional Area of Anchor
Nsa = 39.00 kips Φ= 0.75
ΦNsa = 29.25 kips / bolt Nu,max = 0.45 kips => OK
(continued)
2. Concrete Breakout strength of anchor in tension: (Section D.5.2)
Ncbg = Anc ec,Ned,Nc,NYcp,NNb (Equation D-5)
Anco
2
Anc = 3487.49 in
2 2
Anco = 7846.84 in Anco = 9hef
e'Nx = 0.00 in Eccentricity of all tension forces on a group of anchors in the x dir.
e'Ny = 0.00 in Eccentricity of all tension forces on a group of anchors in the y dir.
c,N = 1.25 c,N = 1.25 for Cast-in-place anchors
Ycp,N = 1 cp,N = 1.0 for Cast-in-place anchors
= 1
kc = 24 kc = 24 for Cast-in-place anchors
Nb = 272.29 kips Nb = kf'c1/2hef3/2
Nb,max = 16f'c1/2hef5/3 if 11in. < h ef < 25in.
Φ= 0.75
ΦNcbg = 113.46 kips Nua = 1.80 kips => OK
2
Abrg = 0.88 in
Ca1 = 23.62
Ca2 = 23.62
Ca2 / Ca1 = 1.00 1.0 < Ca2 / Ca1 < 3.0
Factor = 0.50
Nsb = N/A kips Ca1 > 0.4 hef => Not Applicable (Section D.5.4.1) Φ= 0.75
Nsbg = N/A kips Ca1 > 0.4 hef and/or s > 6ca1=> Not Applicable (Section D.5.4.2)
2
Ase,V = 0.60 in Effective Cross Sectional Area of Anchor
futa = 65.00 ksi
Vsa = 39.00 kips/bolt Φ= 0.65
ΦVsa = 25.35 kips/bolt Vu,max = 0.88 kips => OK
(continued)
6. Concrete Breakout strength of anchor in shear: (Section D.6.2)*
Vb = 8 (le/da)0.2da1/2f'c1/2Ca11.5 (Equation D-25)
Vcbg = Avc ec,Ved,Vc,Vh,VVb (Equation D-22)
Avco
ha = 78.74 in Thickness of member in which an anchor is located
le = 7.00 in Load bearing length (le = minimum of hef or 8 d a ))
da = 0.88 in d a = d b (Outside diameter of shaft of headed stud)
kcp = 2.00 kcp = 1.0 (for hef < 2.5in.); kcp = 2.0 (for hef > 2.5in.)
Ncbg = 151.27 kips from Equation D-5 (See previous Section D.5.2 calcs)
Vcpg = 302.55 kips Φ= 0.75
ΦVcpg = 226.91 kips Vu,max = 3.54 kips => OK
Vu,max = sum of each bolt shear
(continued)
8. Interaction of tensile and shear forces: (Section D.7)
Tension Ratio = NUA
ΦNn
Steel: 0.015 Steel strength of anchor in tension
Breakout: 0.016 Concrete Breakout strength of anchor in tension
Pullout: 0.012 Pullout strength of anchor in tension
Sideface Blowout: N/A Concrete Side-Face Blowout strength of Headed anchor
in tension
Shear Ratio = VUA
ΦVn
Steel: 0.035 Steel strength of anchor in shear
Breakout (Case2): 0.030 Concrete Breakout strength of anchor in shear - perp.
Breakout (Case3): 0.013 Concrete Breakout strength of anchor in shear - parallel
Pryout: 0.016 Concrete Pryout strength of anchor in shear
Conc. Edge dist, act = 23.62 in Actual lesser of four edge distances, cy1/2 & cx1/2 OK
Edge dist, min = 1.50 in Minimum steel edge distance per Table J3.4
Edge dist, act = 2.36 in Actual lesser of four edge distances, cy1/2 & cx1/2 OK
Req'd thick., ha,min = 30.28 in. ha,min = hef + 0.75"
Client:
Project:
Document:
Sketch of Base
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
BS8110 - 1997
Y
C1
X
D1
B
A
Y
Mx
P
Hx
X
Z
X X
1.50
1.50
1.50 1.50
1.50 1.50
Y Y
Mx Mx
P P
Hx Hx
1.40
1.40
1.60 1.60
0.40 0.40
DATE: 16-Dec-15
FOUNDATION DESIGNS
0 For approval
Rev. Revision Description Date
Consultant:
Owner:
MUSANDA PROJECT
Project:
Foundation Design
Client:
Project:
Document:
WIND LOADING ANALYSIS - Chimneys, Stacks, and Vertical Tanks, Light Poles
Per ASCE 7-05 Code for Cantilevered Structures Classified as Other Structures
Input Data: D
1 of 2 12/16/2015 10:50 AM
"ASCE705W.xls" Program
Version 1.1
Parameters Used in Both Item #2 and Item #3 Calculations (from Table 6-2):
^ = 0.143
b^ = 0.84
(bar) = 0.250
b(bar) = 0.45
c= 0.30
l= 320 ft.
(bar) = 0.333
z(min) = 30 ft.
2 of 2 12/16/2015 10:50 AM
"POLEFDN.xls" Program
Version 1.9
Input Data:
Weight of light pole including Solar palnel Aprox ,= 6.23 kN 6.23 kN (Factored)
Horizontal Base Shear = 1.42 kN 1.42 kN (Ref. wind cal.)
Base Moment due to Wind Pressure = 10.85 kN 10.85 kN-m (Ref. wind cal.)
Soil Data:
Unit Weight of Soil, = 0.115 kcf 18.00 kN/m3 H=45.93176' Ground
Angle of Internal Friction, = 30.00 deg. 30.00 deg. Line
Depth to Resisting Surface, h2 = 0.000 ft. 0.000 m h1=0'
Allow. Soil Bearing Pressure, Pa = 4.000 ksf 191.52 kN/m2 h2=0'
.
Pier Loadings:
Axial Load, Pv = 1.400 kips 6.23 kN Resisting
Horizontal Load, Ph = 0.320 kips 1.42 kN Surface L=6.56'
Distance from Ph to Top/Pier, H = 45.932 ft. 14.000 m
Externally Applied Moment, M = 0.500 ft-kips 0.68 kN-m Pier
Results: D=3.28083'
1 of 2 12/16/2015 11:05 AM
"POLEFDN.xls" Program
Version 1.9
Pier Plain Concrete Stresses: (Plain concrete allowable stresses from ACI 318-02, Chapter 22)
Axial Compressive Stress:
fa = 3.45 psi 0.02 N/mm² fa = (Pv+*D^2/4*(h1+h2+a/2)*0.15)/(*(D*12)^2/4)*1000
Combined Compression Stress: ( = 0.55 and divide ACI Code USD value by 1.6 for ASD)
fc = 31.46 psi 0.22 N/mm² fc = fb+fa (compression)
Fc(allow) = 1460.94 psi 10.07 N/mm² Fc(allow) = 0.85**(f'c*1000)/1.6 Fc(allow)>=fc, O.K.
Combined Tension Stress: ( = 0.55 and divide ACI Code USD value by 1.6 for ASD)
ft = 24.56 psi 0.17 N/mm² ft = fb-fa (tension)
Ft(allow) = 121.53 psi 0.84 N/mm² Ft(allow) = 5**SQRT(f'c*1000)/1.6 Ft(allow)>=ft, O.K.
Shear Stress: (divide ACI Code USD value by 1.6 for ASD)
fv = 3.55 psi 0.02 N/mm² fv = V(max)/(*(D*12)^2/4)*1000 (shear)
Fv(allow) = 58.93 psi 0.41 N/mm² Fv(allow) = 4/3*SQRT(f'c*1000)/1.6 Fv(allow)>=fv, O.K.
D R* Pc Pt V(max) M(max)
2 of 2 12/16/2015 11:05 AM
TABLE OF CONTENTS
BASE PLATE DESIGN
Client:
Project:
Document:
General Parameters
Loads
Load P Mx My Load
Case (kN) (kNm) (kNm) Factor
1 10 1.5
25 1.6
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
BS5950 - 1990 X
L=450.0
L1=115.5 219.0
a4=60.0
W=450.0
219.0
Y Y
W1=115.5
a3=60.0
a1=60.0 a2=60.0
X
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
-10.0
-5.00
20.0
40.0
60.0
80.0
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
5.00
10.0
15.0
Distance (mm)
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
2.0 mm
114 kN 6 114 kN
12.2 mm
-10.0
-5.00
20.0
40.0
60.0
80.0
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
5.00
10.0
15.0
Distance (mm)
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
450
116 219
219x3.5 CHS
450
219
330
4M27 gr 8.8
60
60 Plan 60
20
Elevation
DETAIL 1
EMBEDMENT CALCULATION
EMBEDMENT CALCULATION
Per Building Code Requirements for Structural Concrete ( ACI 318-08)
Design of (4) Stud Embed Plate Anchorage per Appendix D
Job Name: Subject: Date: 12/16/2015 11:08
Job Number: Solar Light Pole 14 m -MUSANDA PROJECT Originator: Checker:
Dimensions:
bx1 = 2.362198 in. 60.00 mm PL Edge Distance
bx2 = 2.362198 in. 60.00 mm PL Edge Distance
by1 = 2.362198 in. 60.00 mm PL Edge Distance
by2 = 2.362198 in. 60.00 mm PL Edge Distance
sx1 = 11.81099 in. 300.00 mm Spacing in x-dir.
sy1 = 11.81099 in. 300.00 mm Spacing in y-dir.
cx1 = 13.77949 in. 350.00 mm Edge Distance to Conc.
cx2 = 13.77949 in. 350.00 mm Edge Distance to Conc. Stud Reactions (k)
cy1 = 13.77949 in. 350.00 mm Edge Distance to Conc. Axial Rz Shear Rh
cy2 = 13.77949 in. 350.00 mm Edge Distance to Conc. #1: -0.45 0.88
#2: -0.45
0 45 0.88
0 88
Parameters: #3: -0.45 0.88
Anchor Dia., db = 7/8 in. 22.23 mm Eff.Stud Anchor Diameter #4: -0.45 0.88
Concrete, f'c= 5000 psi 34.47 N/mm² Specified Compressive strength of Concrete
Anchor, fy = 65 ksi 448.16 N/mm² Specified Yield strength of anchor steel
Anchor, futa = 65 ksi 448.16 N/mm² Specified Tensile strength of anchor steel
Steel Element = Ductile (Section D.1)
Embedment, hef = 29.52747 in. 750.00 mm The overall depth through which the anchor transfers force to and from the concrete.
Thickness, h a = 78.74 in. 2000.00 mm Thickness of member in which an anchor is located,
Supp. Reinf.? Yes Potential Failure Surfaces crossed by supplementary reinforcement (Section D.4.2.1)
Cracking Anticip.? No Cracking at service levels (Section D.6.2.7 Case? Case 2
Seismic (Chapt.21) No Anchors are located in structure assigned to Seismic Design Category C, D, E, or F. (Sect. D3.3)
Concrete Type = Normalwt (Section 2.2)
Per Sect. D.6.2.3? Yes For cast-in headed studs that are continuously welded to steel attachments having a minimum
thickness of > 3/8" and db/2 provided that: (a) spacing > 2.5 in. and (b) reinforcement is provided
at the corners if ca2 < 1.5hef.
Results:
1. Steel strength of anchor in tension: (Section D.5.1)
Nsa =Asefuta (Equation D-3)
Ase, N = 0.6 in
2 Effective Cross Sectional Area of Anchor
Nsa = 39.00 kips Φ= 0.75
ΦNsa = 29.25 kips / bolt Nu,max = 0.45 kips => OK
(continued)
2. Concrete Breakout strength of anchor in tension: (Section D.5.2)
Ncbg = Anc ec,Ned,Nc,NYcp,NNb (Equation D-5)
Anco
2
Anc = 1549.99 in
2 2
Anco = 7846.84 in Anco = 9hef
e'Nx = 0.00 in Eccentricity of all tension forces on a group of anchors in the x dir.
e'Ny = 0.00 in Eccentricity of all tension forces on a group of anchors in the y dir.
c,N = 1.25 c,N = 1.25 for Cast-in-place anchors
Ycp,N = 1 cp,N = 1.0 for Cast-in-place anchors
= 1
kc = 24 kc = 24 for Cast-in-place anchors
Nb = 272.29 kips Nb = kf'c1/2hef3/2
Nb,max = 16f'c1/2hef5/3 if 11in. < h ef < 25in.
Φ= 0.75
ΦNcbg = 50.42 kips Nua = 1.80 kips => OK
2
Abrg = 0.88 in
Ca1 = 13.78
Ca2 = 13.78
Ca2 / Ca1 = 1.00 1.0 < Ca2 / Ca1 < 3.0
Factor = 0.50
Nsb = N/A kips Ca1 > 0.4 hef => Not Applicable (Section D.5.4.1) Φ= 0.75
Nsbg = N/A kips Ca1 > 0.4 hef and/or s > 6ca1=> Not Applicable (Section D.5.4.2)
2
Ase,V = 0.60 in Effective Cross Sectional Area of Anchor
futa = 65.00 ksi
Vsa = 39.00 kips/bolt Φ= 0.65
ΦVsa = 25.35 kips/bolt Vu,max = 0.88 kips => OK
(continued)
6. Concrete Breakout strength of anchor in shear: (Section D.6.2)*
Vb = 8 (le/da)0.2da1/2f'c1/2Ca11.5 (Equation D-25)
Vcbg = Avc ec,Ved,Vc,Vh,VVb (Equation D-22)
Avco
ha = 78.74 in Thickness of member in which an anchor is located
le = 7.00 in Load bearing length (le = minimum of hef or 8 d a ))
da = 0.88 in d a = d b (Outside diameter of shaft of headed stud)
kcp = 2.00 kcp = 1.0 (for hef < 2.5in.); kcp = 2.0 (for hef > 2.5in.)
Ncbg = 67.23 kips from Equation D-5 (See previous Section D.5.2 calcs)
Vcpg = 134.47 kips Φ= 0.75
ΦVcpg = 100.85 kips Vu,max = 3.54 kips => OK
Vu,max = sum of each bolt shear
(continued)
8. Interaction of tensile and shear forces: (Section D.7)
Tension Ratio = NUA
ΦNn
Steel: 0.015 Steel strength of anchor in tension
Breakout: 0.036 Concrete Breakout strength of anchor in tension
Pullout: 0.012 Pullout strength of anchor in tension
Sideface Blowout: N/A Concrete Side-Face Blowout strength of Headed anchor
in tension
Shear Ratio = VUA
ΦVn
Steel: 0.035 Steel strength of anchor in shear
Breakout (Case2): 0.047 Concrete Breakout strength of anchor in shear - perp.
Breakout (Case3): 0.021 Concrete Breakout strength of anchor in shear - parallel
Pryout: 0.035 Concrete Pryout strength of anchor in shear
Conc. Edge dist, act = 13.78 in Actual lesser of four edge distances, cy1/2 & cx1/2 OK
Edge dist, min = 1.50 in Minimum steel edge distance per Table J3.4
Edge dist, act = 2.36 in Actual lesser of four edge distances, cy1/2 & cx1/2 OK
Req'd thick., ha,min = 30.28 in. ha,min = hef + 0.75"
Client:
Project:
Document:
Sketch of Base
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
BS8110 - Y
1997
C1
X
D1
B
A
Y
Mx
P
Hx
X
Z
1.00
1.00 1.00
1.00 1.00
Y Y
Mx Mx
P P
Hx Hx
1.40
1.40
1.60 1.60
0.40 0.40