Sei sulla pagina 1di 11

onver

PREVIOUS EXPERIENCE

Manchester Airport

• Supply, installation, commissioning of complete AGL


System for Runway 2.
• Contract 9 for Runway 2
• Contract 15 for Runway 2
• T1BA Control System Modifications
• Supply, installation, commissioning of complete AGL
System for Southern Through Taxiway including: cabling,
fittings, containerised CCR sub-station using ADB and
Siemens AGL equipment
• Fixed Ground Power Refurbishment
• Supply and installation of Inset Approach/ Supplementary
Approach and Threshold Lighting
• Upgrade and Installation of Inset Approach Fittings
• Runway Re-surfacing, AGL refurbishment
• Extensive upgrade of AGL Control System
• Foxtrot 3 Maintenance Works
• Supply and installation of Runway Centreline and
Touchdown Zone Lighting
• Terminal 2 Taxiway AGL & Docking Guidance System
Modifications
• Alpha Echo Works
• Pier B Refurbishment Electrics
• Alpha Echo Works
• Delta Taxiway Repairs Area 6 & 7A
• Illuminated Signs
• Taxiway 5 Refurbishment Work
• Taxiway Delta Reconstruction Area 10B
• R Sub Replacement AGL Control Panel
• Upgrade of ‘C’ sub-station
• Victor Delta Taxiway Work
• Refurbishment of Ground Power Units
• Taxiway Refurbishment Work
• Taxiway Sierra – AGL Design
• Airfield Pavement Maintenance
• Area 13 November Taxiway Modifications
• Electrical Survey of Airfield sub-stations
• Removal of Ground Power Units
• Supply and Install Electrical Power to ILS
• Y2K Testing

London Luton Airport

• Runway Resurfacing Enabling Works


• CAT III Lighting
• ‘26’ Approach Lighting Refurbishment
• Surface Movement Radar (SMR) Installation
• Hangar 202 Apron and Taxiway
• Refurbishment of Approach Masts
• Shutdown Repair Works
• Stand 16/17
• Stand 60/61 Taxiway and Apron Lighting
• Taxiway & Runway Remedial Works
• Alpha Bravo Link
• Supply, Install & Commission Wig Wags
• North Apron Modifications
• Apron Taxiway Refurbishment

2
Stansted Airport

• Upgrade of AGL Control System including implementation


of individual luminaire remote control and monitoring
system (BRITE II)
• Illuminated Signs Control
• Multiple Brilliancy Control
• Y2K Testing

East Midlands Airport

• 2nd Phase of CAT III Upgrade, design, supply and


installation using ADB and Siemens equipment
• AGL Control System Upgrade including supply of CCR’s
• Individual Lamp Control & Monitoring System using a
Alstom Smart Switch
• 1st Phase of CAT III Upgrade, supply and installation of
Runway Centreline Lighting using ADB fittings
• Cyclamen Project
• TDZ Electrical Upgrade
• Upgrade of CCR’s with Primary Current Tolerance
Monitoring Equipment
• Control Tower Upgrade

Birmingham International Airport

• Refurbishment and Upgrade of CAT III AGL System.


• Supply and installation of new Runway Centreline, High
Intensity and Supplementary Approach Luminaires,
Cabling and CCR’s.
• Supply and Installation of Taxiway Signs.
• Supply and install 7 Safegate Stand Docking Guidance
Systems and relocation.
• T2 Aircraft Stands

3
Liverpool John Lennon Airport

• Taxiway ‘U’ Works


• Terminal 1 Phase 4 Apron Extension Docking System

Doncaster Finningley Airport

• Conversion from MOD to Civil Airfield suitable for


• CAT I Operation
• Taxiway Charlie Works

Heathrow Airport

• Supply and commissioning of Strobe Approach Lighting


ADB equipment
• Test and Inspection of Sub-stations

Leeds Bradford Airport

• Taxiway AGL Works


• Southern Apron & Taxiway Lighting Control System
• AGL Control System
• Supply of Runway Centreline and End fittings for CAT
III Upgrade using ADB equipment
• Modifications to existing AGL Control System

Bristol International Airport

• AGL Refurbishment Works including maintaining CAT III


status.

Newquay Cornwall Airport

• AGL Design

4
Bournemouth Airport

• Design, manufacture, commission of AGL Control System


and CCR’s
• SCADA System

Gatwick Airport

• Supply of Approach & Runway AGL Services, Mimic and


Switch Panel in the VCR.

Belfast City Airport

• Major Runway AGL Upgrade


• Installation of AGL Systems
• Design, manufacture, install, commission of new AGL
Control System

Belfast International Airport

• AGL Refurbishment Works


• Charlie/Delta Taxiway AGL Design and Construction
• 25 Approach Lighting
• Replace Runway Centreline and Touch Down Zone

Cardiff International Airport

• Control System and AGL Refurbishment


• Maintenance and Repair Work
• Runway Resurfacing Project

Cardiff Heliport

• Floodlighting
• AGL Installation

5
City of Derry Airport

• Runway Improvements

Coventry Airport

• AGL Simple Approach

Farnborough Airport

• Conversion from MOD to Civil Airfield suitable for


• CAT I Operation
• Apron Lighting and Aircraft Ground Power Units
• Floodlighting
• South Apron Existing Floodlighting

Jersey Airport

• Approach Survey and Design

Shannon Airport

• AGL Control System


• AGL Control System Phase 2

Dublin International Airport

• AGL Control System

Exeter Airport

• Approach Lighting Upgrade

6
H & I Benbecula

• Replacement of AGL and Associated Works

Donegal

• Electrical Upgrade Works

Bristol Filton

• 1st Phase of AGL Upgrade, supply and installation of


Runway Centreline and Edge Lighting, CCR’s and Control
System using ADB equipment

RAF St Athan

• Jet Fuel Store Installation


• Design, supply, installation of CL2B approach system using
Cegelec, Thorn and ADB equipment
• Supply and Installation of Airfield Traffic Lights
• Hydraulic Ring Main Repair Work

RAF Church Fenton

• AGL Refurbishment – Phase 1


• AGL Refurbishment – Phase 2
RAF Cranwell

• AGL Refurbishment

RAF Shawbury

• AGL Refurbishment

• AGL Repairs

7
RAF Mildenhall

• Static Earthing & AGL Works


• MCS Control System Works
• Electrical and Instrumentation Fuel Hydrants

RAF Alconbury

• Service and maintenance of Strobe Approach System

RAF Yeovilton

• Relocation of ACT Tower

BAe Warton

• AGL Refurbishment
• Case White and Nimrod Apron Project

RAF Wittering

• AGL Dummy Deck Facility

DERA Boscombe Down

• Sub Station Refurbishment


• Approach Lighting
• Alignment of PAPI’s

Middle Wallop

• New Modular Control System


• AGL for Helicopter Dispersal Area
• Hardened Aircraft Landing System

8
RAF Benson

• AGL Refurbishment
• Replace HIA Luminaires

RAF Fairford

• Design and Installation of AGL Systems


• Jet Fuel Store Installation Works
• Installation of New Wig Wag Light System
• Taxiway Modifications
• Localiser Survey Points

RAF Coltishall

• Remedial Works

RAF Coningsby

• Site Survey

RAF St Mawgan

• Taxiway and Runway Lighting


• Taxiway Resurfacing

RAF Kinloss

• Traffic Lights

RAF Mona

• Transfer AGL/MCS To Tower

9
Woodford Aerodrome

• AGL Control System


• Upgrade AGL

RAF Waddington

• Repairs to MCS System

RMB Chivenor

• MCS Upgrade

RAF Scampton

• AGL A & B Centre MCS Equipment

RNAS Culdrose

• Design Runway 07:25 & 18 Simple Approach

RAF Gibraltar

• AGL A & B Centre MCS Equipment


• MCS/Road Traffic Crossing Control System

Siauliai Airport - Lithuania

• AGL Control System & CCR’s

Norman Manley Airport - Jamaica

• Supply and installation of AGL Refurbishment

10
VC Bird International Airport - Antigua

• Control System and AGL Upgrade

Cheddi Jagan International - Guyana

• Rehabilitation of Runway 06-24

Skavsta Airport, Stockholm - Sweden

• Phase 1 Works – AGL & Navaids Refurbishment including


conversion from Parallel to Series Cabling, CCR’s and AGL
Control System

Montserrat International Airport

• AGL, Navaids and Met Systems, Electrical Works

Grenada

• Apron Lighting and Taxiway Upgrade

Barbados

• Runway Lighting Modifications and Communication


Systems

Lynden Pindling International - Bahamas

• Refurbishment of Runway Lighting Runway 14/32

Malta International Airport

• AGL Control System

atg airports automation house, lowton business park, newton road, warrington, england wa3 2ap
11
telephone +44 (0) 1942 685 555 fax +44 (0) 1942 685 518 email web@atgairports.com web www.atgairports.com

Potrebbero piacerti anche