Total Material Total Manpower Total Equipment Total Subcontractor

S.No BOQ Item Activity Qty Unit Total Dry Cost Remarks
Cost Cost Cost Cost
1 Light Fixures 74 Nos 129,200.00 2,928.00 132,128
Light point wirngs & Control 1 Items 50,720.00 50,720
2 Small Power & Isolator 28 Nos 2,720.00 336.00 3,056
Small Power ponting Wirings 1 Items 11,760.00 11,760
3 DB 1 Nos 3,650.00 216.00 3,866
4 SMDB 1 Nos 18,750.00 576.00 19,326
5 PA System 1 Items 32,200.00 32,200

6 Fire Alarm & Em. Lighting 1 Items 65,099.00 65,099

7 CCTV & ACS system 1 Items 73,662.00 73,662

8 Lightning Protection 1 Items 103,680.00 103,680

9 Telephone & Data 1 Items 70,000.00 70,000

10 BMS Interface 1 Items 65,000.00 65,000

11 Replacement of Standby Generator Set to Prima Generator 1 Items 236,500.00 236,500

TOTAL in AED 866,997