0 valutazioniIl 0% ha trovato utile questo documento (0 voti)
21 visualizzazioni1 pagina
The field inspection report documents a punch list inspection for an HDPE, LLDPE, and mLLDPE plant project. It lists 15 punch list items to be signed off by representatives from the site contractor, contractor, and owner. Upon completion of any punch list work, the relevant representatives would sign and date their columns to indicate acceptance of the work.
The field inspection report documents a punch list inspection for an HDPE, LLDPE, and mLLDPE plant project. It lists 15 punch list items to be signed off by representatives from the site contractor, contractor, and owner. Upon completion of any punch list work, the relevant representatives would sign and date their columns to indicate acceptance of the work.
The field inspection report documents a punch list inspection for an HDPE, LLDPE, and mLLDPE plant project. It lists 15 punch list items to be signed off by representatives from the site contractor, contractor, and owner. Upon completion of any punch list work, the relevant representatives would sign and date their columns to indicate acceptance of the work.
Project Name Switchgear Name Panel Type Document Title Ekc Dwg. No. Total Sheet:::::: 11039-0-LPL-06 5 Bahregan Storage Tanks Development IRP/23, SS1/IRP/23, SS2/IRP/23