CAAREER OVERVIEW
Onshore & Offshore Pipeline/Piping Engineer for Pre-Feed/Feed & DED including
performance Pipe stress analysis, Experience with Enquiry Requirements Base on Fidic
Yellow Book, Evaluation works shop(EWS) for bid document from contractor,
Pipeline/Piping Installation and Maintenance, Pipeline/Piping Engineering Estimation,
Supervised In-Line Inspection (ILI), Pipeline Project Management construction,
Supervised Piping Project Preventive Maintenance, With twelve years’ experience in Oil
and Gas industries.
I have been working for Oil and Gas project and am now seeking a new professional
challenge.
KEY STRENGTHS
Onshore Pipeline&Offshore Pipeline.
Experienced in piping construction and insulation project at EPC Company.
Experienced in Onshore& OffshorePipeline Engineering and Onshore Construction at
Project Management Consultancy (PMC) Company.
Capable read isometric drawings with MTO & Supports and work accordingly.
Solid knowledge of applicable Codes and Standards such as API, ASME and DNV.
Good knowledge of Feasibility study, conceptual design, FEED, detail
design/Engineering, and familiar with Stress Analysis Using CAESAR II, Pipe lay
analysis, RFQ, Data Sheet, Make a calculation Pipeline report such us Analysis
Thermal Expansion, Stability/Buoyancy Analysis, Up heal Buckling Analysis, Wall
Thickness Calculation, Hydro test Calculation, Bending Analysis, Free Span Analysis,
Pipe and Riser Stress Analysis, inteligent pig.
EMPLOYMENT HISTORY
1. EMPLOYER : PT. Titis Sampurna
Business Line : Operation & Maintenance oil and Gas (CNG,LNG,
LPG/Gas Extraction Plant), Investment in Oil & Gas sector.
Period : December 2016 until Present.
Position Held : Pipeline Engineer / Piping Engineer.
Project Involved :
1. 4 Km Gas Pipeline, Gas Providing Service And Compressor Gas
With Supporting Facilities In The Cantik Field, Lembak, South
Sumatera, PERTAMINA GAS (PERTAGAS)
2. Oil Pipeline 62,566 Km, Kaji – Pangabuan Oil Pipeline Remediation
Work Assessment, MEDCO ENERGI, by SMEC Denka Indonesia
3. Implementation Of Planned Maintenance (PM) By Using Windows
Shutdown In Cpp Donggi, Donggi-Matindok Field, Banggai Sulawesi
Tengah as Lead Piping. PT. Pertamina EP Asset 4
4. Bid Tender EPCI Pipeline Repair Manual, Lug and Bolt
Method/Mechanical Bolt-On Clamp (Sleeve) of KP 47 Grissik-
Singapore, TGI Onshore Jambi Pipeline, PT. Trasnportasi Gas
Indonesia
5. In-Line Inspection/ILI (Inteligent Pig) 60 Km 8” Pipeline Air Serdang
to SP. Beringin & 10” Pipeline SP. Beringin to SKG. Limau Timur.
Pertamina EP Prabumulih. PT Sinergi & PT. Rosen
6. Onshore Pipeline Gas Distribution from Pelabuhan Tanjung Perak -
Terminal Teluk Lamong 22 KM , 12” Seamless Pipe API 5L-X52, PT.
Indonesia power and PT.Pembangkitan Jawa Bali (PT. PJB)
Page 1 of 8
7. Onshore Pipeline Oil Distribution 165 Km, from Blok Station Tampi to
PT.SRMD – Jene. 6” Seamless pipe API 5L-Gr. B
8. Design engineering Gas Pipeline 12 inch from PT. PJB Gresik to PT.
Indonesia Power Tanjung Perak 22 Km.
Main Duties :
Piping Supervisor, Project Preventive Maintenance (PM)
Assessment Pipeline
Site survey pre-design Pipeline Engineering.
Preparation Pipeline Specifications.
Estimation Engineering/BOQ for Bid Stage.
Preparation for Master Derivable List (MDR).
Review, analysis problem, calculation, and final design based on Design Master
Derivable List (MDL):
Wall Thickness Pipe Calculation.
Pipeline free span calculation.
Pipeline Crossing Analysis as API 1102.
Field Bend Analysis and calculation (natural, cold, and hot bending).
Pipeline Buoyancy Analysis and calculation.
Pipeline Lowering Analysis, etc.
Review and arrange for pipe stress analysis.
Page 2 of 8
3. EMPLOYER : PT. Mahakarya Andalan Nusantara
Business Line : OIL & GAS Engineering Consultancy Company.
Period : June 2016 until October 2016.
Position Held : Pipeline Engineer
Project Involved :
Company Client PT. PGN (PT. PERUSAHAAN GAS NEGARA).
Job Distribution Network Reliability SBU Region :
1. Pipeline onshore for Bekasi, Cilegon, Bogor and Palembang PIM 2
Area Network Reliability, Carbon steel pipe API 5L-X52 and API 5L Gr.
B:
Detail Engineering Desain Bekasi Area, start point at MR/S
Rawa Lumbu to MR/S Narogong, Pipe 8” 14 Km long.
Detail Engineering Desain Cilegon Area, start point at Bukit Al
Kadra Anyer, Pipe 16” 0.5 Km long.
Detail Engineering Desain Cilegon Area, start point Bukit
Pelindo II, Pipe 16” 1.3 Km long.
Detail Engineering Desain Bogor Area, Simpang Gas Alam –
Ice Woody (Jalan Raya Bogor), Pipe 10” 3.8 Km long.
Detail Engineering Desain Bogor Area, PT. Maxim – Cibinong
(Jalan Raya Bogor), Pipe 10” with 2.9 Km long.
Detail Engineering Desain Bogor Area, Warung Jambu – PT.
Good year, Pipe 8” with 2.15 Km Long.
Detail Engineering Desain Bogor Area, Taman PAM – PT.
Unitex (Jl. Raya Tajur), Pipe 10” with 2.91 Km Long.
Detail Engineering Desain Bogor Area, Tepung Tapioka –
Warung Jambu Area Bogor, Pipe 10” with 3.25 Km Long.
Detail Engineering Desain Bogor Area, Looping Pipa Citeureup
– Jalan Raya Bogor, Pipe 10” with 8.8 Km Long.
Detail Engineering Desain Palembang Area, PIM 2, Pipe 6”
with 4.4 Km Long.
2. Pipeline onshore for Cirebon, and Bekasi Area Network Reliability,
Polyethilene (PE) Pipe:
Pipeline onshore Cirebon area, Looping DTR R/S Sector I to
R/S sector R. Pipe PE 125 mm, 0.8 KM long.
Pipeline onshore Cirebon area, Looping DTR R/S Sector I to
R/S sector SA. Pipe PE 125 mm, 0.55 KM long.
Pipeline onshore Cirebon area, Looping DTR R/S Sector MB to
R/S sector T. Pipe PE 125 mm, 0.012 KM long.
Pipeline onshore Looping Cirebon area, DTR DTM Kalijaga to
R/S sector Gardenia. Pipe PE 125 mm, 0.7 KM long.
Pipeline onshore Looping Bekasi area, Looping R/S Sector
Setia Mekar. Pipe PE 63 mm, 0.1 KM long.
Pipeline onshore Looping Bekasi area, Looping R/S Sector
Rawa Tembaga. Pipe PE 63 mm, 0.1 KM long.
Pipeline onshore Looping Bekasi area, Looping R/S Sector
Margahayu. Pipe PE 63 mm, 0.1 KM long.
Main Duties:
Site survey for Hot Tapping Point, HDD Entry and Exit Point, Sectional Valve
Point/Location.
Prepare analysis problem, calculation, and final detail design based on Design
Submission Schedule(DSS):
Wall Thickness Pipe Calculation.
Pipeline free span calculation.
Pipeline Crossing Analysis as API 1102.
Field Bend Analysis and calculation (natural, cold, and hot bending).
Pipeline Buoyancy Analysis and calculation for swampy and river
crossing area.
Pipeline Lowering Analysis, etc.
Page 3 of 8
Analysis and calculation for loads of pipe support on bridges using pipe stress
analysis.
Prepare document Analysis and calculation Road crossing for boring activity,
River crossing (boring and sinker), Cleaning, Pigging/Gauging, Hydro test,
Drying-N2 Purging, Pre commissioning/commissioning and Gas In.
Arrange As build Allignment sheet as per actual site condition.
Page 4 of 8
External Corrosion Coating Design.
On-Bottom Analysis Report.
Design Calculation Wall Thickness.
Pipeline free span calculation.
Pipeline Crossing Analysis as API 1102.
Field Bend Analysis and calculation (natural, cold, and hot bending).
Pipeline Buoyancy Analysis and calculation.
Anchoring analysis.
Pipeline Lowering Analysis.
Pipeline Cathodic Protection Analysis and calculation.
Pipeline Onshore Installation Procedure:
Installation Aboveground Piping Procedure.
Installation Underground Piping Procedure.
Pipe Coating and Wrapping Procedure.
Procedure of Cleaning, Flushing and Blowing.
Procedure of Trenching & Backfill.
Procedure of Pigging.
General Procedure of Road & River Crossing.
Pipeline pre-commissioning & Hydro testing.
Pipeline stress analysis report and Riser Stress Analysis.
5. EMPLOYER : PT. Connusa Energindo
Business Line : Project Managemenet Construction (PMC), Consultancy Company
for Power Plant, Oil and Gas Sectors.
Period : Sept. 2013 until 22 August 2014.
Position Held : Pipeline Engineer
Project Involved :
Client PT. PGN (PT. PERUSAHAAN GAS NEGARA) :
1. SBU 2 Relocation Project, Kalisogo – Waru Gas Distribution Pipeline
Project (CP-20), 30 Km long.
2. SBU 2 Relocation Project, Ajinomoto – Cheil Jedang Gas Distribution
Pipeline Project (CP-18), 27 Km long.
3. SBU 2 Relocation Project, Otsuka - Purwosari Gas Distribution
Pipeline Project (CP-19), 15 Km long.
4. SBU 2 Relocation Project, Japanan Metering Station Project (CP-17)
5. SBU 2 Relocation Project, Semarang Gas Distribution Pipeline
Project (CP-16),48 Km long.
Main Duties:
Experience with Enquiry Requirements Base on Fidic Yellow Book.
EWS, Evaluation works shop for bid document from contractor.
Site survey for feasibility studies / pre-design Pipeline Engineering.
Estimation Engineering/BOQ.
Prepare Employer’s Requirements–Chapter Onshore Pipeline.
Review Material Take Off (MTO).
Review, analysis problem, calculation, and final design based on Design
Submission Schedule(DSS) / Master Derivable List (MDL):
Wall Thickness Pipe Calculation.
Pipeline free span calculation.
Pipeline Crossing Analysis as API 1102.
Field Bend Analysis and calculation (natural, cold, and hot bending).
Pipeline Buoyancy Analysis and calculation.
Pipeline Lowering Analysis, etc.
Review and arrange for pipe stress analysis.
Detail design/Engineering.
Page 5 of 8
Project Involved :
1. Piping Onshore pigging Facility Upgrade Bacth 1, ConocoPhilips.
2. Piping Suban 13, 14 dan 2 Shutdown Tie Ins Provision Project.
ConocoPhilips.
Main Duties:
Prepare Material Take Off (MTO).
Quality Assurance of Piping Engineering Works.
Analysis problem, calculation, and final design.
Line check and command for construction.
Check & review the design drawing as per P&ID.
Prepare shop drawing as per design approved client.
Prepare test package as per test block diagram.
Prepare as built drawing.
Prepare BOQ.
Prepare and arrange document for contract administration.
Controlling document.
Prepare and arrange a budget plan.
Prepare and arrange a plan and work schedule.
Prepare and arrange Master deliverable list.
Page 6 of 8
Checked the received supplies to ensure they were in order Inspected supplies
before purchase (pipe and fitting).
Supervised and re-check offloading and distribution of delivered supplies.
EDUCATION
Bachelor of Mechanical Engineering, BRAWIJAYA UNIVERSITY, Malang, graduated in
2007
Mechanical Engineering, UJUNG PANDANG STATE POLYTECHNIC, Ujung Pandang,
graduated in 2004
TECHNICAL TRAINING
Basic Sea Survival Training, held by PT. Safetindo Perkasa, Certificate, No.
BSS/SPOT/11738/2015, Valid from 28 January 2015 until 28 January 2018.
The Engineering and Technology of Subsea System Oil and Gas : Case Studies and
Assessment on Shallow Ultra-Deep Water(ASME B31.4& DNV OS F101), held by
Institution of Engineers Indonesia ( IEI ), August 2015, certificate.
Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids(ASME
B31.4) and Gas Transmission and Distribution Piping Systems(ASME B31.8) held by
Institution of Engineers Indonesia ( IEI ), September 2013, certificate.
Pipe Stress Analysis training using CAESAR II.5 held by Ap-greid Oil & Gas Design
Course, Certificate, March 2013.
DESIGN TRAINING
PIPING 3D MODELLING DESIGNER using PDMS, PT. SINERGY MITRA UTAMA, at
Mechanical Engineering Dept. Mercu Buana University, certificate, 2010.
Piping Drafting Training (Semi Piping Designer) – held by ap-greid oil & gas
design course, 2013
Drafter (AUTOCAD 2 & 3D),BLKI (Balai latihan kerja Indonesia), Makassar, certificate.
MANAGEMENT TRAINING
Project Quality Management Mechanical Equipment and Piping, Case Study : Oil
&Gas, Power Plant, and Mining (ISO/TS 29001,API Q1), held by Institution of
Engineers Indonesia ( IEI ), July 2019, certificate.
Legal Contract on Engineering Procurement and construction (EPC) / Turnkey
Projects, FIDIC Contract Guide : General Condition Of contract, claims, Dsipute and
Arbitration, held by Institution of Engineers Indonesia ( IEI ), June2015, certificate.
Training & Workshop Microsoft Project 2016, held by Arthamitra, April 2019.
ENGINEERING TRAINING/SEMINARS
Page 7 of 8
Commissioning Engineer, using software Commissioning Data Management, held by
Petros Oil Gas Training, Certificate, 2018.
Post trenching study during pipelines and operation - The post trenching study
considering local analysis approach using ABAQUS finite element software - , Held by
PT. Energy Bangun, 11 Sep. 2015
In-house Workshop Spec. Subsea Hose and Floating Hose, PHE ONWJ, December
2015.
Potential of Co2 Utilization From Oil And Gas Field Production, Expert Association of
Oil and Gas Production Facilities Indonesia (IAFMI, Ikatan Ahli Fasilitas Produksi
Minyak dan Gas Bumi Indonesia), Friday 21 july 2017, Jakarta.
Which technologies are best for my pipeline? Leak Detection and Simulation (LDS), By
ATMOS INTERNATIONAL Training Event - Indonesia 27 September 2017, Jakarta
ROSOFT TRAINING Held By Rosen, Kuala Lumpur, 2018
COMPUTER LITERATE
Engineer &Design Software:
CAESAR II
Orcaflex
Mooses
PDMS
Auto Cad 2D & 3D
Spread Sheet :
Microsoft Office Excel
Microsoft Project
MathCad
Commissioning Data Management
Word Processing and Presentation:
Microsoft Office Word
Microsoft Office Power Point
Microsoft Project
PROFESSIONAL MEMBERSHIP
Institution of Engineers Indonesia (IEI), Reg. Number : 0905.09.025445
Joint International Research Centre on Subsea Technology (JIRC-ST) - international
society of ocean, mechanical and aerospace scientists and engineering (ISOMAse)
REFERENCES
Referees will be provided upon request
Page 8 of 8