Mission Hills
Earthquake Resistant Pipeline
Project Description system with enhanced fire
protection and improved water
The Mission Hills Earthquake
system reliability.
Resistant Pipeline is a pilot
project using Earthquake
Resistant Ductile Iron Pipe
Construction Information
(ERDIP) that is made in the LADWP crews will replace
U.S. The project is an integral approximately 4,740 feet of
part of LADWP’s efforts to build existing 8, 12, & 16-inch
a seismic-resilient water pipe mainline pipe with a 12-inch
network. The Mission Hills American-made ERDIP, along
location was selected for its portions of Stranwood Avenue,
close proximity to an active fault Sepulveda Boulevard and San
line and a liquefaction zone. Fernando Mission Blvd. To
minimize impacts to the
Additionally, the pipe is over 50- community, crews will work in
years old and in need of small, manageable sections that
can be covered at the end of
each work day.

Construction will require


temporary lane reductions along
Sepulveda Blvd. and temporary
street closures along San
Fernando Mission Blvd.
Motorists will be detoured to
adjacent streets. Temporary
tow-away/no parking signs will
be posted as needed. Access to
local businesses and the
surrounding neighborhood will
be maintained throughout
construction.

LADWP will give a 48-hour


replacement. Seismic resiliency
advance notice when temporary
here is essential to maintaining service interruptions are needed
water system reliability as well to make water main
as protecting the numerous connections. Other than this
critical facilities that are located connection work, service
along this corridor such as interruptions throughout the
medical services, police and fire project are expected to be
minimal.
stations, and an emergency
shelter. otoño Construction on this project will
Project Region
begin in fall 2019 and is
Schedule Mission Hills
estimated to be complete by
Fall 2019 – winter 2020. Work hours are to
Winter 2020 The completed project will be determined.
provide an earthquake-resilient
A l t d| John.Cox@ladwp.com
W. Valley District Superintendent: John Cox | 818-775-5422 j t Cit T k
Assistant Superintendent: Monty Bridges | 818-775-5451 | Monty.Bridges@ladwp.com
Rev. 5.17.19 W. Valley District Engineer: Genevieve Han | 213-367-1275| Genevieve.Han@ladwp.com