Provide Expansion loop in vertical drop

Distance between two headers is to short, Insulation will clash. pls increase.
Distance between two headers is to short, Insulation will clash. pls increase.

Plant Scrubber & steam line clash


Clash with hand rail & why expander in the line ? PID shows same line size

There are so many piping. Proper support from civil to be design, assignment to be sent if
required.
Chiller line clash with column.

CW return line size is 50 NB as per PID.


CA line not shown for chiller package
Trim valve for CT basin, feed biturn & flushing tank not shown.
Expansion loop required in CHW line
BOP of both line to be same for providing single support.

CW line clash
Do not reduce size of line for such small portion.

Acid hose connection valve to be placed in side the curb wall end.
Caustic hose connection valve to be extended towards the curb wall end.
Isolation valve required.

Isolation valve required in suction


Also check discharge line check valve missing & there is two isolation valve. Two valve not
required.
Three line should not be routed. Single line will go at around 500 MM bop & taping shall be
near the individual tank.

Acid line connection not done with bittern line.


Caustic line clash in pipe rack

Caustic line, chlorine line, water line compressed air, instrument air, line etc to be extended
up to chlorine shed.
Pls droop line (Acid & caustic) outside of rack & also near column to take support.

All piping drop in between rack to be avoided.


Caustic line is not connected with Plant scrubber.

Recirculation line 50-cas-a1a-1415 is not routed.


Also process water line 50-pw-a1a-1414 is not shown.

All tapping from process line as per PID 1700. Is not shown.
RO feed pump along with piping is not shown.
Also RO water line to boiler & RO reject line to flushing tank T-1101 to be show.
Condensate tank T-1702 along with is not found
Sealing water supply & return line all tapping to be shown as per PID