MURO DE MANPOSTERIA DE
M3
PIEDRA
OBRA: CONSTRUCCIÓN CASA ARTESANAL CUTUTU (OBRA FINA) CONTRATISTA: CONSTRUCTORA LEVELMAN
SUPERVISOR: Ing. (e) Angel R. Challagua Nina
ZONA: OESTE CUTUTU
FECHA: 22 DE JULIO DE 2013
DETALLE DEL CERTIFICADO PLANILLA DE AVANCE Nro.1 (UNO)
OBRA AUTORIZADA CONTRATO MODIFICATORIO OBRA CERTIFICADA
ORDEN DE CAMBIO
TOTALES
CANT. IMPORTE EN Bs. Nº1 Nº1 VOLUMEN IMPORTE EN Bs.
No. UNID
DESCRIPCION DE TRABAJOS PROPU EN EL TOTAL A IMPORTE IMPORTE IMPORTE IMPORTE
. ANTERIO
PRECIO IMPORTE CANTIDAD IMPORTE CANTIDAD IMPORTE
R AL DIA %
ESTA PRESENTELA FECHA ANTERIOR ACTUAL TOTAL TOTAL
1 MURO DE MANPOSTERIA DE PIEDRA M3 5.72 111.78 639.38 0.00 0.00 0.00 0.00 0.00 199.29 199.29 0.00 22276.64 22276.64 22276.64 3484.09%
2 Err:509 M3 5.72 758.70 4339.76 0.00 0.00 0.00 0.00 0.00 Err:508 Err:508 0.00 Err:508 Err:508 Err:508 Err:508
3 Err:509 M3 1.66 1,200.71 1993.18 0.00 0.00 0.00 0.00 0.00 Err:508 Err:508 0.000 Err:508 Err:508 Err:508 Err:508
4 Err:509 ML 4.14 20.66 85.53 0.00 0.00 0.00 0.00 0.00 Err:508 Err:508 0.00 Err:508 Err:508 Err:508 Err:508
5 Err:509 M2 54.36 162.39 8827.52 0.00 0.00 0.00 0.00 0.00 Err:508 Err:508 0.00 Err:508 Err:508 Err:508 Err:508
9 Err:509 M3 1.29 3,148.78 4061.93 0.00 0.00 0.00 0.00 0.00 Err:508 Err:508 0.00 Err:508 Err:508 Err:508 Err:508
RESUMEN DE MONTOS
RESUMEN FINANCIERO
OBRA: " CONSTRUCCIÓN CASA ARTESANAL HUACUTA " CONTRATISTA: Ing. Jonas David Negretty Huarayo
HUACUTA SUPERVISOR: T.S. Gonzalo Ordoñez Mostacedo
ZONA: DISTRITO AYMAYA
FECHA: 16 DE ABRIL DE 2014
DETALLE DEL CERTIFICADO PLANILLA DE AVANCE Nro.1 (UNO)
OBRA AUTORIZADA OBRA CERTIFICADA
TOTALES
UNID. CANT. IMPORTE EN Bs. VOLUMEN IMPORTE EN Bs.
No. DESCRIPCION DE TRABAJOS DE PROPU PRECIO IMPORTE ANTERIOR EN EL TOTAL A IMPORTE IMPORTE IMPORTE IMPORTE
%
MED. ESTA UNITARIO TOTAL AL DIA PRESENTELA FECHA ANTERIOR ACTUAL TOTAL TOTAL
1 MURO DE MANPOSTERIA DE PIEDRA M3 184.54 85.85 15842.76 0.00 199.29 199.29 0.00 17109.18 17109.18 17109.05 107.99%
2 Err:509 Err:509 1.39 171.71 238.68 0.00 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509
3 Err:509 Err:509 154.04 53.17 8190.31 0.00 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509
4 Err:509 Err:509 1.00 55.89 55.89 0.00 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509
5 Err:509 Err:509 2.00 60.37 120.74 0.00 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509
6 Err:509 Err:509 3.00 48.29 144.87 0.00 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509
7 Err:509 Err:509 1.00 2,905.30 2905.30 0.00 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509
8 Err:509 Err:509 1.00 696.14 696.14 0.00 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509
9 Err:509 Err:509 1.00 667.52 667.52 0.00 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509
10 Err:509 Err:509 402.54 48.29 19438.66 0.00 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509
11
12
13
14
15
16
RESUMEN DE MONTOS
REPRESENTANTE LEGAL SUPERVISOR DE OBRA JEFE DE PLANIFICACIÓN OFICIAL MAYOR TÉCNICO ALCALDE G. A. M. U.
RESUMEN FINANCIERO
PRECIO CANTIDA
PRECIO PRECIO
CANT. PRECIO D CANTIDAD CANTIDAD PRECIO CANTIDAD PRECIO
ITEM DESCRIPCION Unid UNITARIO PROG. TOTAL Bs. REVISAD REVISADA
TOTAL
REVISADA TOTAL Bs. REVISADA TOTAL Bs.
Bs. TOTAL Bs. Bs.
A
TOTAL= Err:509
PRECIO CANTIDA
PRECIO PRECIO
CANT. PRECIO D CANTIDAD CANTIDAD PRECIO CANTIDAD PRECIO
ITEM DESCRIPCION Unid UNITARIO PROG. TOTAL Bs. REVISAD REVISADA
TOTAL
REVISADA TOTAL Bs. REVISADA TOTAL Bs.
Bs. TOTAL Bs. Bs.
A
Ing: JONAS DAVID NEGRETTY HURAYO Ing: (e) ANGEL R. CHALLAGUA NINA
T. S. MARCELO MUÑOZ FERNADEZ Arq: JUAN MARCELO ESCOBAR ESCOBAR Ing: HILARIÓN FLORES CHAMBI
ZONA: SUD
FECHA: 25/08/2013
OBRA AUTORIZADA
Unid. VALORES CONTRACTUALES
No. DESCRIPCION DE TRABAJOS de Precio
Monto del item
Cantidad unitario
en (Bs)
Med. (Bs)
NUEVOS ITEMS
7 Err:509 M2 Err:509 267.27 Err:509
TOTALES Err:509