Rs
1. Total Value of work done as per account in column 7 entry ( A )
( For Contractors, This form provides only for payments for work actually
2. Deduct amount with held
Name of Contractor:- M/s Starcon - HKS (JV) , C-101-102, IIn
Name of work: Construction of Diversion weir, Intake, Shingle
(2x2MW) in distt- Rudraprayag.
( a ) From previous bills as per last Running Amount Bill Rs
( b ) From this bill .... ..... ...... ...... Agreement No.:- 01/GM(SHP)/16-17, Dated- 04.04.2016
No. and date of his last bill for this work :-15th R/Bill Dt.
04.10.2017
3. Balance , ie '' up - to date '' Quantity
Quantity Executed
4. Total amount of payments already made as per last Running Account bill No. up to Date as per
Executed Since Shown on Last
5. Payment now to be made as detailed below , Last Certificate Certificate Measurement Book
( a ) By recovery of amounts certificate to this work
Value of stock supplied as detailed in the ...... (a) 1 2 3
( b ) By recovery of amounts creditable to other heads of accounts ... ( b )]
By Deduction Rs.
(JV) , C-101-102, IInd Floor, Lajpat Nagar-I, New Delhi-110024. Date of Start:- 04.04.2016
weir, Intake, Shingle excluder, Power Duct & D-tank of kaliganga-I SHP Schedule/Extended date of Completion:- 03.04.2018
- 04.04.2016
k :-15th R/Bill Dt.
No. and date of this bill for this work :- 16th R/Bill Dated 01.12.2017
Amount ( Rs ) REMARKS
Items of work or supplies grouped under "subhead"
Unit Rate (Rs)
and "Sub-work" of Estimate Up to date Since Previous up to Previous Bill Amount
4 5 6 7 8 9
1.00- Trench Weir, Intake, Shingle Excluder
Cum 1/1.02- E/w in all kind of soils. 226.60 386914.97 0.00 386914.97
Cum 2/1.03- E/w for hard rock 675.40 1897286.40 0.00 1897286.40
Cum 3/1.04- E/w for structure. 229.50 104195.30 0.00 104195.30
Cum 4/1.05- PCC M10 (1:3:6) 6381.70 119018.71 0.00 119018.71
Cum 5/1.06- PCC M15 (1:2:4) 7153.40 400800.28 127898.07 272902.21
Cum 6/1.07 (A)- RCC M20 in Foundation 7973.30 20331.92 0.00 20331.92
Cum 7/1.07 (B)- RCC M25 in foundations 7973.30 6294121.40 3900855.67 2393265.73
Cum 8/1.08(B)- RCC M25 in walls 8646.60 394457.89 291736.28 102721.61
MT 9/1.09- Reinforcement for RCC 71700.00 1376855.10 0.00 1376855.10
Job 10/1.10- River Diversion 610763.00 305381.50 0.00 305381.50
Job 11/1.11- Dewatering. 300000.00 90000.00 0.00 90000.00
Cum /1.14 - HP stone filling. 590.80 19895.53 19895.53 0.00
Cum 12/1.15- RR masonary laid in 1:6 2990.10 249117.19 249117.19 0.00
Cum 13/1.16- RR Dry 1532.90 42292.71 0.00 42292.71
Cum 14/1.17- Wire Crates 2013.40 584389.35 0.00 584389.35
Sqm 15/1.18- C/S for foundations 184.90 61549.51 0.00 61549.51
Sqm 16/1.19- C/S for Walls 330.70 16535.00 0.00 16535.00
Cum 17/1.21-Cement Plum masonary. 4637.90 8834521.19 322722.45 8511798.73
Cum 18/1.22 - Demolishing of RCC 1003.10 196406.98 0.00 196406.98
2.00- Power Duct
Cum 18/2.02- E/w in all kind of soils.. 226.60 55995.13 0.00 55995.13
Cum 19/2.03- E/w for hard rock 675.40 238612.07 0.00 238612.07
Cum 20/2.04- E/w for structure. 229.50 89867.61 0.00 89867.61
Cum 21/2.09- RR masonary laid in 1:6 2990.10 902501.88 0.00 902501.88
Cum 22/2.10- RR masonary laid dry. 1532.90 136106.19 0.00 136106.19
Cum 23/2.11 - HP stone filling. 590.80 181718.26 0.00 181718.26
Cum 24/2.12 - Cement Plum masonary. 4637.90 11902613.80 0.00 11902613.80
3.00- Desilting Tank
Cum 25/3.01- Slip Clearance 71.00 18925.76 0.00 18925.76
Cum 26/3.02 E/w in all kind of soils. 226.60 76531.88 0.00 76531.88
Cum 27/3.03- E/w for hard rock 675.40 61792.35 0.00 61792.35
Cum 28/3.04- E/w for structures 229.50 58113.99 0.00 58113.99
Cum 29/3.05- PCC M10 6381.70 19272.73 0.00 19272.73
Cum 30/3.06- RCC M20 in Foundations 7973.30 151492.70 0.00 151492.70
Cum 31/3.07- RCC M20 in Wall 8646.60 286029.53 0.00 286029.53
Cum 32/3.08- Reinforcement for RCC 71700.00 175808.40 0.00 175808.40
Cum 33/3.15- RR masonary laid in 1:6 2990.10 549759.79 0.00 549759.79
Cum 34/3.16 - HP stone filling 590.80 416720.78 0.00 416720.78
Cum 35/3.17 - Cement plum masonary. 4637.90 9943611.22 0.00 9943611.22
Cum 36/3.18 - Demolishing of RCC 1003.10 18998.71 0.00 18998.71
Sqm 37/3.19- C/S for foundations 184.90 3882.90 0.00 3882.90
Sqm 38/ 3.20- C/S for walls 330.70 20744.81 0.00 20744.81
Total (Rs.) 46703171.42 4912225.21 41790946.21
Add 36.75% Above as per Agreement Condition (Rs.) 17163415.50 1805242.76 15358172.73
Total (A) (Rs.) 63866586.92 6717467.97 57149118.95
Name of Work: Construction of Penstock line & associated civil works, Power House Building, Switchyard
TRC and Flood Protection work of Kaliganga-II SHP(2X2.25) in Distrct Rudraprayag.
Recovery
Security @ 5.00% on (a) 5% 4772855.392945
TDS @ 2.00%on (c=a-b) 2% 1909142.157178
WCT @ 2.00% on (a-b) 2% 1909142.157178
Labour Cess 1% 954571.078589
Royelty as per MB no. 321926.3889
Cummulative bill
68,509,882.14
1,294,218.67
69,804,100.81
25653007.0480047
95457107.8589018
4772855.39294509
1909142.15717804
1909142.15717804
954571.078589018
321,926.39
9867637.17479018
3.18 Demolishing OF RCC Cum 1003.10 18.94
Total Amount
Add above @ 36.75% 36.75%
Total (A)
4 Extra Item
1 Grouting TMT Bar RM 980 651.7
2 S/F of75mmPVC RM 164 582.48
21.00 3882.9 -
62.73 20744.811 -
41790926.2 8,016,176.55
15,358,165.38 2,945,944.88
57,149,091.60 10,962,121.43
600.00 600.00
734,192.72 1,114,691.09
513,934.90 780,283.76
57,663,026.50 11,742,405.19
18,998.71
3,882.90
20,744.81
50,098,634.11
18411248.0351773
68,509,882.14
-
679,826.00
95,526.72
1,073,531.09
1,848,883.81
1,294,218.67
69,804,100.81
RA-16
Sr.no. Description UNIT Nos Length Hight Quantity in Remark's
cum
1 behind u/s raft (key) 1st 1 16.000 0.583 9.33
2 behind u/s raft (key) 1st 1 2.150 0.950 2.04
3 u/s raft 1st 1 18.900 1.433 27.09
4 u/s raft 2nd 1 18.900 3.200 60.48
5 behind u/s raft 1st 1 3.100 1.100 3.41
6 behind u/s raft 2nd 1 2.000 1.180 2.36
7 Bottom D/S raft 1 2.000 0.500 1.00
8 Bottom D/S in second raft 1 17.950 0.762 13.67
9 behind intake ( bottom of wing wall) 1 5.13
4.10 1.250
RA-15
Sr.no. Description UNIT Nos Length Hight Quantity in Remark's
cum
1 Back side wing wal sqm 2 6.70 1.04 13.94
2 extra Back side wing wal sqm 1 3.22 1.250 4.03
wing wall back side sqm 2 10.75 0.51 10.86
L- section wing wall back side sqm 2 7.6 0.75 11.40
3 power duct near d-tank sqm 1 12.5 1.25 15.63
4 power duct near d-tank sqm 1 7.5 1.3 9.75
power duct near d-tank sqm 1 6.92 2.12 14.67
5 power duct plum sqm
6 ch-46-57 sqm 1 11 1.16 12.76
7 ch-57-85 sqm 2 28 1.41 78.96
8 Total 171.98
RA-14
Sr.no. Description UNIT Nos Length Hight Quantity in Remark's
cum
wing wall (hill side) 1ST LIFT SQM 2 7.00 1.220 17.08
ch 0-17
Back side wing wal 1ST LIFT SQM 2 5.50 1.45 15.91
Back side wing wal 1ST LIFT SQM 2 4.00 1.42 11.33
Back side wing wal 1ST LIFT SQM 2 7.45 1.45 21.61
ch 0-17
Back side wing walL 2ND LIFT SQM 2 5.00 1.200 12.00
Back side wing wal 2ND LIFT SQM 2 5.50 1.200 13.20
approach road
1 st lift SQM 1 6.69 1.0225 6.84
2nd lift SQM 1 7.07 1.22 8.63
power duct area
ch-25-31 SQM 1 6.15 0.64 3.94
ch-31-46 SQM 1 15 0.715 10.73
Total 121.26
Shuttering RA 12
Sr.no. Description UNIT Nos Length Hight Quantity in Remark's
cum
1
trench back side 12.5 1.425
sqm 1 17.81
3
wing wall side (hill side) 2nd lift 8.5 1.25
sqm 2 21.25
4 wing wall side (hill side) further 3.0 1.25
length 2nd ift sqm 2 7.50
5
wing wall side (hill side) 3rd lift 8.6 1.2
sqm 2 20.64
6
total this bill 67.20
2
Plum for weir behind Open trench 1 11 1.25 13.75
3 3rd lift 1 6.31 1.25 7.89
4 Plum concrete under the key 1 7 1.25 8.75
5
Plum concrete under the In-take 1 3.93 1.25 4.92
6 plum concrete infront of Intake 1 4.31 1.25 5.39
kg 01 hks jv RA 04
kg 01 RA 03
KG 01 RA 04
RA-10
Downstream Key 1st lift
Verical bar 16 72 3.00 0.70 3.50
Side bar 16 2 3.00 0.6
16 50 5.200
Upstream raft main bar bottom
16 50 5.200
16 13 25.900
distribution bottom
16 13 24.900
16 50 6.55 0.15
Upstream raft main bar Top
16 50 7.05 0.15
16 15 19.100 2 2
distribution Top
16 16 19.100 1.5 1.5
C.L. Lap Cutting length Total Length
d e f
7.20 518.40
3.60 7.20
0.00 0.00
0.8 16.15 32.30
0.8 16.35 32.69
0.8 16.54 33.08
0.8 16.74 33.47
0.8 16.93 33.86
0.8 17.12 34.24
0.8 17.31 34.62
0.8 14.75 44.25
0.8 3.80 136.80
0.8 4.80 172.80
3.90 15.60
3.40 13.60
0.8 17.16 34.31
0.8 17.31 34.62
0.8 17.47 34.94
0.8 17.62 35.25
0.8 17.78 35.56
0.8 17.94 35.87
0.8 18.09 36.18
0.00 0.00
8.60 60.20
3.40 13.60
4.40 8.80
0.8 20.35 244.20
2.80 8.40
0.00 0.00
6.20 601.40
0.8 21.10 253.20
19.70 59.10
0.00 0.00
0.8 6.00 300.00
0.8 6.00 300.00
1.6 27.50 357.50
1.6 26.50 344.50
0.8 7.50 375.00
0.8 8.00 400.00
1.6 24.70 370.50
1.6 23.70 379.20
1.58 819.20
1.58 11.38
0.00 0.00
1.58 51.04
1.58 51.66
1.58 52.27
1.58 52.89
1.58 53.51
1.58 54.11
1.58 54.71
1.58 69.93
1.58 216.18
1.58 273.07
1.58 24.65
1.58 21.49
1.58 54.22
1.58 54.71
1.58 55.21
1.58 55.70
1.58 56.19
1.58 56.69
1.58 57.18
0.00 0.00
1.58 95.13
1.58 21.49
1.58 13.91
1.58 385.90
1.58 13.27
0.00 0.00
1.58 950.36
1.58 400.12
1.58 93.39
0.00 0.00
1.58 474.07
1.58 474.07
1.58 564.94
1.58 544.40
1.58 592.59
1.58 632.10
1.58 585.48
1.58 599.23
middle 25mm 8 2 16
U/S RAFT 25 8 1 10
Total 42
Plum in Weir
1.00 3.77
(.4+.6+.2+.15+.90+1.25)/6 0.58 7.96
1.80 1.49
1.80 1.10
(2.2+2.10)/2 2.15 1.24
(1+1.15+1.25)/3 1.13 31.60
(1.1+1.15+1.20)/3 1.15 6.52
Width
spillway
1st lift cum 1 14.2 (2++1.7+.40+.40)/4
L- section 1st lift cum 1 (3.3+4.80)/2 4.05
2nd lift cum 1 14.2 (2+.4)/2
L- section 2nd lift cum 1 3.4
3rd lift cum 1 14.2 (1.9+.4)/2
L- section 3rd lift cum 1 (1.8+2.15)/2 1.975
4th lift cum 1 14.2 ((1.90+1.80)/2+(.4+.30)/2)/2
L- section 4th lift cum 1 (.8+1.60)/2 1.2
Height Remark's
Quantity
in cum
Total 83.314
HP FILLING
Sr.no. Description NOS. Length Height
Width
spill way area
Behind 2nd lift 1 12.7 (1.6+1.6+.50)/3 1.233 (.7+.4)/2
Behind 3rd lift
(.90+.80+.35+.
1 13.2 (2+1.1+2.0+2.35)/4 1.863 25+.90+.50)/6
Behind 4th lift 1 13.2 0.750
Total
Height Quantity Remark's
in cum
0.6 8.614833
0.62 15.16075
1 9.9
Total 33.676 cum
Sr.no. Description unit Length
in wall
2nd lift 19
3rd lift 19
4th lift 19
Total 33.740
Height Quantity
Width in cum
((.72+.68+.65+.61+.59+.54+.50)/7+
(.78+.75+.71+.65+.60+.56+.50)/7)/2 0.631 0.72 8.638
((.78+.75+.71+.65+.60+.56)/6+
(.87+.82+.78+.72+.63+.58)/6)/2 0.676 1.25 16.065
((.87+.82+.78+.72+.63+.58)/6+
(.94+.88+.84+.76+.67+.60)/6)/2 0.724 1.25 17.202
((.94+.88+.84+.76+.67+.60)/6+(1.02
+.91+.88+.80+.70+.62)/6)/2 0.764 1.25 18.135
1.8 1 15.840
(1.78+1.90+2.10+2.25)/4 2.0075 (.65+.55+.58+.70)/4 0.62 23.648
((2.35+2.40+2.47+2.45)/4+(2.28+2.
35+2.60+2.60)/4)/2 2.4375 0.6 27.788
(14.18+14.05+14.03)/3 14.09 0.6 160.588
(1.15+1.30)/2 1.225 (.68+.60+.70+.60)/4 0.645 14.815
Total 489.240
Remark's
Remark's
M-15
Sr.no. Description unit Length
1 M15 RA-17
2 TOP OF PLUM & behind wing wall CUM 7.70
Total 1.20
Total 17.879
shuttering
Sr.no. Description UNIT Nos Length Hight Quantity Remark's
in sqm
shuttering
Sr.no. Description UNIT Nos Length Hight Quantity Remark's
in sqm
Total 73.51
distribution
1st & 2nd treanch 16 6 6.65 6.65
16 4 1.5 1.5
48
49 1st treanch
50 raft top - bottom both
51 main bar 16 190 0.3 1.7 0.3 2.3
52 distribution bar 16 18 0.4 19.9 20.3
53 lap 16 18 0.8
54
55 vertical bar
56 u/s side main bar 12 4 0.35 2.2 2.55
57 12 4 0.35 2.275 2.625
58 12 4 0.35 2.35 2.7
59 12 4 0.35 2.425 2.775
60 12 4 0.35 2.5 2.85
61 12 4 0.35 2.575 2.925
62 12 4 0.35 2.65 3
63 12 4 0.35 2.725 3.075
64 12 4 0.35 2.8 3.15
65 12 4 0.35 2.875 3.225
66 12 4 0.35 2.95 3.3
67 12 4 0.35 3.025 3.375
68 12 4 0.35 3.1 3.45
69 12 4 0.35 3.17 3.52
70 12 4 0.35 3.25 3.6
71 12 4 0.35 3.325 3.675
72 12 4 0.35 3.4 3.75
73 12 4 0.35 3.475 3.825
74 12 4 0.35 3.55 3.9
75 12 4 0.35 3.625 3.975
76 12 4 0.35 3.7 4.05
77 12 4 0.35 3.775 4.125
78 12 4 0.35 3.85 4.2
79 12 3 0.35 3.925 4.275
80
81 u/s side distribution bar
82 12 3 0.3 19.8 20.1
83 12 1 17.9 17.9
84 12 1 15.3 15.3
85 12 1 13.4 13.4
86 12 1 11 11
87 12 1 9.5 9.5
88 12 1 6.5 6.5
89 12 1 4.6 4.6
90 lap 12 6 0.6 0.6
91
92 d/s side
93 vertical bar 12 4 0.35 2.1 2.45
94 12 4 0.35 2.175 2.525
95 12 4 0.35 2.25 2.6
96 12 4 0.35 2.325 2.675
97 12 4 0.35 2.4 2.75
98 12 4 0.35 2.475 2.825
99 12 4 0.35 2.55 2.9
100 12 4 0.35 2.625 2.975
101 12 4 0.35 2.7 3.05
102 12 4 0.35 2.775 3.125
103 12 4 0.35 2.85 3.2
104 12 4 0.35 2.925 3.275
105 12 4 0.35 3 3.35
106 12 4 0.35 3.075 3.425
107 12 4 0.35 3.15 3.5
108 12 4 0.35 3.225 3.575
109 12 4 0.35 3.3 3.65
110 12 4 0.35 3.375 3.725
111 12 4 0.35 3.45 3.8
112 12 4 0.35 3.525 3.875
113 12 4 0.35 3.6 3.95
114 12 4 0.35 3.675 4.025
115 12 4 0.35 3.75 4.1
116 12 3 0.35 3.825 4.175
117
118 d/s side distribution bar
119 12 3 0.3 19.8 20.1
120 12 1 17.9 17.9
121 12 1 15.3 15.3
122 12 1 13.4 13.4
123 12 1 11 11
124 12 1 9.5 9.5
125 12 1 6.5 6.5
126 12 1 4.6 4.6
127 lap 12 6 0.6 0.6
128
B/W 1st & 2nd trench top + bottom steel bar 16 11 19 1.2 20.2
lap 16 11 0.8 0.8
184 behind plate to u/s raft to trench 12 95 0.3 0.8 0.7 1.8
231
232 top main bar
233 16 95 2.25 2.25
234 Distribution bar TOP - Bottom
235 16 22 0.4 19.8 20.2
236 lap 16 22 0.8 0.8
237
238 2nd treanch wing wall left side
239 vertical bar 16 22 0.3 4.55 4.85
240
241 bridge steel bar
242 railing bar
243 16 6 6.8 6.8
244 16 6 14.4 14.4
245 lap 16 6 14.4 0.8 15.2
246 bottom support bar 16 46 1 1
24 1.58 37.92
19.5 1.58 30.81
12 1.58 18.96
72 1.58 113.76
61.8 1.58 97.644
84 1.58 132.72
84 1.58 132.72
1324.8 1.58 2093.184
76.8 1.58 121.344
1430.4 1.58 2260.032
76.8 1.58 121.344
14.35 1.58 22.673
0.8 1.58 1.264
95 1.58 150.1
31185.487 kg
total 31.185 mt
E/W
Sr.no. Description unit Length Height
Width
Total3
Quantity Remark's
in cum
7.06875
1.522125
8.59
Sr.no. Description unit Length
Width
Total 13.079
Sr.no. Description unit rmt unit weight Quantity in
cum
1 I- section mt 44.5 24.2 1076.90
2 Channel mt 21.1 16.8 354.48
3 angle 40*40*5 mt 28 3.00 84.00
4 plate 3.15mm thickness mt 21.28 24.72 526.04
5 bridge pipe mt 44.8 3.56 159.49
6 angle 50*50*6 mt 91.46 4.5 411.57
7 angle 50*50*6 mt 37 4.5 166.50
8 d/s plate for trench 5*1250*6300 mt 23.68 39.25 929.44
9 u/s plate for trench 5*1250*6300 mt 25.715 39.25 1009.31
10 channel 150*150*12mm mt 74.6 27.3 2036.58
11 hold fast mt 45.6 3 136.80
12 6891.11
Total
13 6.89
Remark's
kg
mt
6731.63
6.73
S.NO PARTICULAR QTY Rate Amount
EARTHWORK
1.03 Hard rock 13.08 675.4 8833.5516 13.08
Total 7726333
Total 11639291
522.98
Cement 62.76
MB amt. 15295347
actual amt 11639291.42
Total amt.
adjustment 3656055.577
40% of
adjustment 1462422.231
487474.077