1. DESIGN
1.1 Postulated
1.2 Alternative
Pile type, size etc.
Pile group configuration
Alteration to pile cap
Casing required
Founding : level
: material
: final set
Method of founding: bulbous base;
underream; rock socket
Plant and equipment
2. SETTING OUT (Prior to installation)
3. PILING PLATFORM, PLANT AND
EQUIPMENT
3.1 Platform
Drawings and method
Installation CCP
Removal CCP
3.2 Plant and equipment
4. INSTALLATION ACCEPTANCE CRITERIA
(Refer to pile data sheet)
4.1 Materials and workmanship
4.2 Geometry
4.3 Embedments
4.4 Founding
4.5 Pile testing
Core drilling
Load test
Integrity : Frequency Response
: Cross-hole sonic
7. MEASUREMENT AND PAYMENT
STATUS INCLUDES
A Contractor's submission received C Inspected / Tested E Approved / Rejected
B Engineer's appraisal D Compliance Verified F Signed Off
CCP : Contractor's Competent Person
Note: Indicate N/A under Status if not applicable