1.2. Classification
The vessel is designed in accordance to the "Rules for the Classification and
Construction of Sea-going Steel Ships" (QCVN 21:2010/BGTVT) and “Rules for the
Survey and Construction of Steel Ships" ClassNK for offshore supply vessel operating at
un-restricted ocean going, international voyage.
2. MACHINERY
The design conditions for all machinery components and systems:
Maximum environmental temperature: Tmax = 40oC
Relative humidity: max = 85 %
Seawater temperature: Tn = 32oC
Working principle
External Fi-Fi pump, driven by main engine, sucks water from sea chests mixing
with foam then pump to monitors.
Some main pipe size
Inlet pipe of Fi-Fi pump DN350 (355,6 x 11,1)
Outlet pipe of Fi-Fi pump DN200 (216,3 x 8,2)
DN350 (355,6 x 11,1)
Pipe to monitors DN150 (165,2 x 7,1)
2.2.10. Engine room ventilating system
Equipment
Two axial air supply fans.
Fire damper, air duct…
Working principle
Fresh air is supplied from 2 axial flow fans which are arranged on forcastle deck. In
the engine room, fresh air is distributed by a steel air duct system and insufflators. Ducts are
fitted to ventilate necessary place such as main engines, generator sets, main switchboard,
battery container area...
SESCO.L90.D.501-02 MACHINERY SPECIFICATIONS Page 14/15
2.2.11. Air conditioning system
Equipment
Air conditioner central units.
Packaged air conditioner for control room
Fans, fire damper, air duct, insulating materials …
Working principle
The system shall consist of one central unit and necessary air distributing.
Air conditioner system is used to serve accommodation area such as crew rooms,
office room, club…Temperature is about 24oC – 26oC. Humidity is about 50% - 60%.
2.2.12. Filling, sounding and air vet pipe
Air vent pipe
All tanks are arranged air vent pipe. The hight of air vent pipe head no lower than
760mm on main deck and no lower than 450mm on other decks.
The thickness of air vent pipe according to “Rules for the Classification and
Construction of Sea-going Steel Ships” (QCVN 21:2010/ BGTVT) and “Rules for the
Survey and Construction of Steel Ships" ClassNK
Air vent pipe head of oil tanks are wire net (approved type).
Air vent pipe head of sewage treatment is led to compass deck.
Air vent pipe head is self closing type (except air vent pipe of sea chest).
Filling, sounding pipe
All tanks are arranged filling, sounding pipe. Tanks are not hull structure shall be
arranged flat glass level gauge with self closing valve (approved type).
Pipe material accords to liquid in tanks.
All sounding heads shall be fitted with brass head caps with name plate for the
identification.
Sounding heads of tanks in bottom plan are equipped with self closing and check
valve.
Striking plate or other effective device shall be provided to protect the shell plating
under sounding pipe.
2.2.13. Sanitary water supply system
Equipment
Fresh water hydrofore pumps.
Fresh water heater.
Filters, fitting, pipes…
Working principle
Hydrophore pump supply fresh water with the presure in system P = 1,5 kG/cm 2 to
galley, toilet, …
Hot water is led to shower. Hot water pipe is isolated.
Some main pipe size
Main fresh water pipe DN50 (60,5 x 3,9)
Pipe to basin DN20 (27,2 x 2,9)
Pipe to basin closet DN25 (34,0 x 3,4)
Pipe to water heater DN25 (34,0 x 3,4)
Main hot water DN32 (42,7 x 3,6)
Pipe to shower DN20 (27,2 x 2,9)
SESCO.L90.D.501-02 MACHINERY SPECIFICATIONS Page 15/15
2.2.14. Sanitary water discharge system
Equipment
Sewage treatment.
Filters, fitting, pipes…
Working principle
Discharges from toilet bowl, drain from basin and deck scuppers in toilet and
bathroom,... is led to sewage tank when the ship in restricted area. A sewage treatment plan
is fitted up to treated sewage. Capacity of sewage treatment is 42 persons per day.
Sewage pump is provided to discharge the sewage tanks when ship is ashore. One
standard flange is provided to connect to ashore receiving terminal.
2.2.15. Fresh water supply system
Equipment
Fresh water transfer pumps.
Fresh water generator.
Fresh water tanks.
Filters, fitting, pipes…
Working principle
Fresh water transfer pumps in the workshop room shall be arranged to transfer fresh
water from one compartment to another compartment and vice-versa and from such tanks to
international shore connections on main deck.
Fresh water generator makes fresh water from water in sea chest and fresh water has
taken to fresh water tank.
Some main pipe size
Main fresh water pipe DN125 (139,8 x 6,6)
Fresh water pipe DN80 (89,1 x 5,5)
DN65 (76,3 x 5,2)
Inlet of fresh water pump DN100 (114,3 x 6,0)
2.2.16. Exhaust gas system
Exhaust pipe is isolated. Temperature on outside of exhaust pipe is not exceed 60 oC.
Expansion joints are equipped to each engine.
Main engine exhaust pipe DN350 (355,6 x 11,1)
Generator set exhaust pipe DN200 (216,3 x 8,2)
Emergency generator set exhaust pipe DN80 (76,3 x 5,2)
2.2.17. Spilled oil treatment system
Equipment
Fire and generator set pump, ejector.
Filters, fitting, pipes…
Working principle
Fire and generator set pump sucks water from either sea chest. Sea water shall be
mixed with oil clean material from hull structure detergent tank. The mixed liquid shall be
spary on the sea to treat oil.
Some main pipe size
Main pipe DN80 (89,1x5,5)
SESCO.L90.D.501-02 MACHINERY SPECIFICATIONS Page 16/15
Pipe from clean material detergent tank DN40 (48,6 x 3,7)
Pipe to nozzles DN65 (76,3x 5,2)