9. IMPLEMENTACION DE S.S.H.H.
9.1 MOVIMIENTO DE TIERRAS - ELIMINACION DE MATERIAL 1.00 1.00 1.30 15.50 m3
9.2 SOLADO 1.00 0.05 14.86 0.743 m3
9.3 CIMENTACION 1.00 1.00 1.00 14.02 m3
9.4 SOBRECIMIENTO 1.00 24.77 0.15 0.40 m3
9.5 COLUMNAS PLACAS
9.5.1 Concreto 6.00 0.60 0.15 3.60 m3
9.5.1 Fierro 3/8" estribos placa 0.60 x 0.15 6.00 39.50 1.00 1.00 ML.
OBRA: PARQUE URBANIZACION INDEPENDENCIA AMERICANA
MUNICIPALIDAD DISTRITAL DE YANAHUARA
DPTO:AREQUIPA AREQUIPA PROV: AREQUIPA
UBICACIÓN ELEMENTOS UND TOTAL
CANT. LONG ANCHO ALTO
9.5.1 Fierro 3/8" estribos placa 0.40 x 0.15 4.00 29.50 1.00 1.00 ML.
9.5.1 Fierro 1/2" placa 0.60m x0.15m x 3.60 6.00 54.00 1.00 1.00 ML.
9.5.1 Fierro 1/2" placa 0.40m x0.15m x 3.60 4.00 27.00 1.00 1.00 ML.
9.5.1 Alambre N° 16 1.00 1.00 1.00 90.00 Kgrs.
9.5.1 Alambre N° 8 1.00 1.00 1.00 120.00 Kgrs.
9.6 VIGAS
9.6.1 Concreto
9.6.2 Fierro 3/8" estribos y vigas 1.00 1.00 1.00 52.00 ML.
9.6.3 Fierro 1/2" vigas de 0.20 x 0.30 1.00 1.00 1.00 104.00 ML.
9.6.4 Alambre N° 16 1.00 1.00 1.00 40.00 Kgrs.
9.6.5 Alambre N° 8 1.00 1.00 1.00 60.00 Kgrs.
9.7 MUROS
9.7.1 Ladrillo kk Eje 1 1.00 6.00 1.00 3.40 m2
9.7.2 Ladrillo kk Eje 2 1.00 2.75 1.00 3.00 m2
9.7.3 Ladrillo kk Eje 3 1.00 5.00 1.00 3.40 m2
9.7.4 Ladrillo kk Eje A 1.00 4.00 1.00 3.40 m2
9.7.5 Ladrillo kk Eje B 1.00 3.00 1.00 3.00 m2
9.7.6 Ladrillo kk Eje C 1.00 4.00 1.00 3.40 m2 81.85
9.8 LOSA DE TECHO e = 0.20
9.8.1 Concreto 1.00 1.00 1.00 2.23 m3
9.8.2 Ladrillo hueco e= 0.15 9.00 1.00 1.00 24.00 Unid
9.8.3 Fierro 1/4" 1.00 114.00 1.00 1.00 ML.
9.8.4 Fierro 1/2" 14.00 4.00 2.00 1.00 ML.
9.8.5 Alambre N° 16 1.00 1.00 1.00 30.00 Kgrs.
9.8.6 Alambre N° 8 1.00 1.00 1.00 40.00 Kgrs.
9.8.7 Carga 1.00 4.00 6.00 0.15 m3
9.8.8 Ladrillo Pastelero 1.00 4.00 6.00 1.00 m2
9.9 REVESTIMIENTOS REVOQUES Y ENLUCIDOS
9.9.1 Concreto piso y falso piso e = 15 cm. 5.70 3.85 0.15 3.29 m3
9.9.2 Tarrajeo interior 1.00 27.40 1.50 41.10 m2
9.9.3 Tarrajeo exterior 1.00 20.00 3.60 0.01 m2
9.9.4 Derrames 1.00 47.50 1.00 47.50 ML.
9.9.5 Ceramico Piso 1.00 4.00 6.00 24.00 m2
9.9.6 Ceramico pared h= 1.50 1.00 27.40 1.50 41.10 m2 68.39
9.10APARATOS SANITARIOS
9.5.1 Inodoros 1.00 3.00 1.00 3.00 Unid.
9.5.1 Urinarios 1.00 1.00 1.00 1.00 Unid.
9.5.1 Lavabos 1.00 4.00 1.00 4.00 Unid.
9.11 GRIFERIA INODOROS 1.00 3.00 1.00 3.00 Unid.
9.12 GRIFERIA URINARIOS 1.00 1.00 1.00 1.00 Unid.
9.13 GRIFERIA LAVABOS 1.00 4.00 1.00 4.00 Unid.
9.14 TUBERIA DESAGUE 4" 1.00 22.00 1.00 22.00 ML.
9.14 TUBERIA DESAGUE 3" 1.00 9.00 1.00 9.00 ML.
9.14 TUBERIA DESAGUE 2" 1.00 12.00 1.00 12.00 ML.
9.14 TUBERIA AGUA 1/2" 1.00 25.00 1.00 25.00 ML.
9.14 SUMIDEROS DE 2" 1.00 1.00 2.00 2.00 Unid.
9.15 REGISTROS ROSCADOS DE 4" 1.00 1.00 2.00 2.00 Unid.
9.16 LLAVES DE PASO 1/2" 1.00 1.00 4.00 4.00 Unid.
9.17 CAJA DE DESAGUE 1.00 1.00 1.00 1.00 Unid.
AISLAMIENTO
3.00 2.20 2.40 15.84
3.00 0.47 2.40 3.38
3.00 0.45 2.40 3.24
ZONA DE BAÑOS 3.00 0.50 1.70 2.55
EJE 6 25.01
DRILO PANDERETA
EJE A 77.33
M2
M2
403.02
AISLAMIENTO
3.00 2.20 2.00 13.20
3.00 0.47 2.00 2.82
3.00 0.45 2.40 3.24
ZONA DE BAÑOS 3.00 0.50 2.00 3.00
EJE 6 22.26
PARAPETO
64.00 0.15 0.20 52.80
29.00 0.30 0.25 39.88
TARRAJEO DE COLUMNAS
C-4 M2
C-5 421.15
AISLAMIENTO
3.00 2.20 2.00 13.20
3.00 0.47 2.00 2.82
3.00 0.45 2.40 3.24
ZONA DE BAÑOS 3.00 0.50 2.00 3.00
EJE 6 22.26
PARAPETO
64.00 0.15 0.20 52.80
29.00 0.30 0.25 58.00
TARRAJEO DE COLUMNAS 474.83
M2
C-4
C-5 1 3.90 13.73 53.55
1 1.35 14.79 19.97
FALSO PISO DE 2 1 4.25 11.51 48.92
1 3.35 1.11 3.72
ANILES GRANDES 1 3.35 16.18 54.20
PASADIZO 1 3.02 2.80 8.46
LAVANDERIA 1 4.85 16.15 78.33
PASADIZO 2 1 3.95 3.40 13.43
ANILES MEDIANOS 1 1.50 3.95 5.93
GUARDIANIA 1 3.80 3.95 15.01
ANILES MEDIANOS 1 1.20 8.40 10.08
BAÑADO 1 4.47 4.30 19.22
ALMACEN 1 4.47 4.25 19.00
COCINA 2 6.73 4.30 57.88
PASADIZO 1 2.60 3.75 9.75
CIRUGIA 1 4.75 4.78 22.71
RECUPERACION 1 17.00 1.50 25.50
CUARENTENA 1 11.50 0.80 9.20
ICIOS HIGIENICOS
OFICINA
VEREDAS M2 392.50
M2 72.58
AISLAMIENTO
CUARENTENA 1 3.95 3.40 13.43
1 1.50 3.95 5.93
PISO CERAMICO 3 1 3.80 3.95 15.01
1 4.47 4.30 19.22
BAÑADO 1 4.47 4.25 19.00
ALMACEN
COCINA
CIRUGIA
RECUPERACION
77.33
M2