PLANILLA DE METRADOS

OBRA: PARQUE URBANIZACION INDEPENDENCIA AMERICANA


MUNICIPALIDAD DISTRITAL DE YANAHUARA
DPTO:AREQUIPA AREQUIPA PROV: AREQUIPA
UBICACIÓN ELEMENTOS UND TOTAL
CANT. LONG ANCHO ALTO

2. OBRAS DE PINTURA - LATEX


2.1 MUROS - CIELOS RASOS
2.1.1 Muro cancha de fronton 1.00 12.78 5.00 63.9 M2
2.1.2 Muros S.S.H.H. - exteriores 1.00 20.00 3.00 60 M2
2.1.3 Muros S.S.H.H. - Interiores 1.00 29.00 1.50 43.5 M2
2.1.4 Muros Portales de ingresos 2.00 5.50 3.00 33 M2
2.2 CIELOS RASOS S.S.H.H. 1.00 3.70 5.70 21.09 M2
2.3 PARAPETOS
2.3.1 Parapetos con torrentera 1.00 179.95 2.35 422.88 M2
2.3.2 Parapetos perimetricos 1.00 180.37 1.35 243.50 M2
2.3.3 Parapetos cancha de fulbito 1.00 23.56 1.35 31.806 M2
2.3.4 Dados base - columnas estructura techo cancha de fulbito 12.00 3.88 0.60 27.936 M2
2.4 COLUMNAS
2.4.1 Columnas circulares pergolas 42.00 0.80 3.00 100.8 M2
2.4.2 Columnas rectangulares - monumentos 7.00 2.13 4.20 62.622 M2
2.5 GRADERIAS
2.5.1 Paso 1.00 116.65 0.50 58.33 M2
2.5.2 Contra paso 1.00 116.65 0.45 52.49 M2
1,221.85
3. OBRAS DE PINTURA - ESMALTE
3.1 LOSAS DEPORTIVAS
3.3.1 Losa de fronton 2.00 13.36 10.51 280.83 M2
3.3.2 Losa de voley 1.00 22.14 12.47 276.09 M2
3.2 CARPINTERIA METALICA 1.00 1.00 525.00 525.00 M2
3.3 BANCAS DE CONCRETO 9.00 5.50 0.50 24.75 M2
3.4 JUEGOS DE NIÑOS 1.00 1.00 17.00 17.00 M2
3.5 BANCAS DE MADERA 7.00 1.90 1.30 17.29 M2
1,140.95
4. OBRAS DE PINTURA - BARNIZ
4.1 PERGOLAS CAMINERIA 8.00 1.00 7.05 56.40 M2
4.2 PERGOLAS ESTARES 2.00 1.00 10.25 20.50 M2
4.3 COLUMNAS DE LADRILLO CARAVISTA - PERGOLA 4.00 3.00 2.00 24.00 M2
100.90
5. REPOSICION DE MALLA OLIMPICA
5.1 ARCOS DE FULBITO 1.00 1.00 20.00 15.00 M2
5.2 OTROS 1.00 1.00 15.00 15.00 M2
35.00
6. REPOSICION DE GRASS NATURAL.
6.1 GRASS NATURAL PARA AREAS FALTANTES 1.00 1.00 272.56 M2
272.56
7. COLOCACION DE GRASS SINTETICO CANCHA
7.1 DESMANTELAMIENTO DE GRASS SINTETICO EXISTENTE 1.00 31.40 18.20 m2.
7.2 ELIMINACION DE GRASS ANTIGUO 1.00 1.00 1.00 2.00 volquetada
7.3 GRASS SINTETICO 40mm 8800 Dtex 1.00 31.40 18.20 m2.
7.4 PEGAMENTO ESPECIAL PARA GRASS SINTETICO 1.00 1.00 1.00 8.00 lata
7.5 CAUCHO ANTI DESLIZANTE PARA GRASS SINTETICO 1.00 1.00 1.00 571.48 m2
7.6 CINTAS DE POLIESTER 1.00 1.00 1.00 395.00 ml

9. IMPLEMENTACION DE S.S.H.H.
9.1 MOVIMIENTO DE TIERRAS - ELIMINACION DE MATERIAL 1.00 1.00 1.30 15.50 m3
9.2 SOLADO 1.00 0.05 14.86 0.743 m3
9.3 CIMENTACION 1.00 1.00 1.00 14.02 m3
9.4 SOBRECIMIENTO 1.00 24.77 0.15 0.40 m3
9.5 COLUMNAS PLACAS
9.5.1 Concreto 6.00 0.60 0.15 3.60 m3
9.5.1 Fierro 3/8" estribos placa 0.60 x 0.15 6.00 39.50 1.00 1.00 ML.
OBRA: PARQUE URBANIZACION INDEPENDENCIA AMERICANA
MUNICIPALIDAD DISTRITAL DE YANAHUARA
DPTO:AREQUIPA AREQUIPA PROV: AREQUIPA
UBICACIÓN ELEMENTOS UND TOTAL
CANT. LONG ANCHO ALTO
9.5.1 Fierro 3/8" estribos placa 0.40 x 0.15 4.00 29.50 1.00 1.00 ML.
9.5.1 Fierro 1/2" placa 0.60m x0.15m x 3.60 6.00 54.00 1.00 1.00 ML.
9.5.1 Fierro 1/2" placa 0.40m x0.15m x 3.60 4.00 27.00 1.00 1.00 ML.
9.5.1 Alambre N° 16 1.00 1.00 1.00 90.00 Kgrs.
9.5.1 Alambre N° 8 1.00 1.00 1.00 120.00 Kgrs.
9.6 VIGAS
9.6.1 Concreto
9.6.2 Fierro 3/8" estribos y vigas 1.00 1.00 1.00 52.00 ML.
9.6.3 Fierro 1/2" vigas de 0.20 x 0.30 1.00 1.00 1.00 104.00 ML.
9.6.4 Alambre N° 16 1.00 1.00 1.00 40.00 Kgrs.
9.6.5 Alambre N° 8 1.00 1.00 1.00 60.00 Kgrs.
9.7 MUROS
9.7.1 Ladrillo kk Eje 1 1.00 6.00 1.00 3.40 m2
9.7.2 Ladrillo kk Eje 2 1.00 2.75 1.00 3.00 m2
9.7.3 Ladrillo kk Eje 3 1.00 5.00 1.00 3.40 m2
9.7.4 Ladrillo kk Eje A 1.00 4.00 1.00 3.40 m2
9.7.5 Ladrillo kk Eje B 1.00 3.00 1.00 3.00 m2
9.7.6 Ladrillo kk Eje C 1.00 4.00 1.00 3.40 m2 81.85
9.8 LOSA DE TECHO e = 0.20
9.8.1 Concreto 1.00 1.00 1.00 2.23 m3
9.8.2 Ladrillo hueco e= 0.15 9.00 1.00 1.00 24.00 Unid
9.8.3 Fierro 1/4" 1.00 114.00 1.00 1.00 ML.
9.8.4 Fierro 1/2" 14.00 4.00 2.00 1.00 ML.
9.8.5 Alambre N° 16 1.00 1.00 1.00 30.00 Kgrs.
9.8.6 Alambre N° 8 1.00 1.00 1.00 40.00 Kgrs.
9.8.7 Carga 1.00 4.00 6.00 0.15 m3
9.8.8 Ladrillo Pastelero 1.00 4.00 6.00 1.00 m2
9.9 REVESTIMIENTOS REVOQUES Y ENLUCIDOS
9.9.1 Concreto piso y falso piso e = 15 cm. 5.70 3.85 0.15 3.29 m3
9.9.2 Tarrajeo interior 1.00 27.40 1.50 41.10 m2
9.9.3 Tarrajeo exterior 1.00 20.00 3.60 0.01 m2
9.9.4 Derrames 1.00 47.50 1.00 47.50 ML.
9.9.5 Ceramico Piso 1.00 4.00 6.00 24.00 m2
9.9.6 Ceramico pared h= 1.50 1.00 27.40 1.50 41.10 m2 68.39
9.10APARATOS SANITARIOS
9.5.1 Inodoros 1.00 3.00 1.00 3.00 Unid.
9.5.1 Urinarios 1.00 1.00 1.00 1.00 Unid.
9.5.1 Lavabos 1.00 4.00 1.00 4.00 Unid.
9.11 GRIFERIA INODOROS 1.00 3.00 1.00 3.00 Unid.
9.12 GRIFERIA URINARIOS 1.00 1.00 1.00 1.00 Unid.
9.13 GRIFERIA LAVABOS 1.00 4.00 1.00 4.00 Unid.
9.14 TUBERIA DESAGUE 4" 1.00 22.00 1.00 22.00 ML.
9.14 TUBERIA DESAGUE 3" 1.00 9.00 1.00 9.00 ML.
9.14 TUBERIA DESAGUE 2" 1.00 12.00 1.00 12.00 ML.
9.14 TUBERIA AGUA 1/2" 1.00 25.00 1.00 25.00 ML.
9.14 SUMIDEROS DE 2" 1.00 1.00 2.00 2.00 Unid.
9.15 REGISTROS ROSCADOS DE 4" 1.00 1.00 2.00 2.00 Unid.
9.16 LLAVES DE PASO 1/2" 1.00 1.00 4.00 4.00 Unid.
9.17 CAJA DE DESAGUE 1.00 1.00 1.00 1.00 Unid.

9.18 INSTALACIONES ELECTRICAS


9.18.1 Alambre electrico TWG N° 14 2.00 1.00 1.00 2.00 Rollos
9.18.2 Tubos de P.V.C. 5/8" 10.00 1.00 1.00 10.00 Unid.
9.18.3 Codos de P.V.C: de 5/8" 20.00 1.00 1.00 20.00 Unid.
9.18.4 Llaves termomagneticas 2.00 1.00 1.00 2.00 Unid.
9.18.5 Llave diferencial 1.00 1.00 1.00 1.00 Unid.
9.18.6 Caja de llaves electricas con tapa 1.00 1.00 1.00 1.00 Unid.
9.18.7 Cajas octogonales 6.00 1.00 1.00 6.00 Unid.
OBRA: PARQUE URBANIZACION INDEPENDENCIA AMERICANA
MUNICIPALIDAD DISTRITAL DE YANAHUARA
DPTO:AREQUIPA AREQUIPA PROV: AREQUIPA
UBICACIÓN ELEMENTOS UND TOTAL
CANT. LONG ANCHO ALTO
9.18.8 luminarias 6.00 1.00 1.00 6.00 Unid.
9.18.9 tomacorrientes 2.00 1.00 1.00 2.00 Unid.
9.18.10 interruptores dobles 2.00 1.00 1.00 2.00 Unid.

9.17 ACABADOS - VANOS


9.19.1 Puertas metalicas de 1.00 x 2.40 2.00 1.00 1.00 2.00 Unid.
9.19.1 Ventanas altas de 0.60 x 2.00 vidrio templado de 6 mm 2.00 2.00 0.60 2.40 m2.
9.20.1 Cerrduras de puertas de doble golpe 2.00 1.00 1.00 2.00 Unid.
9.21.1 Divisiones metalicas con tres puertas para inodoros 3.00 1.00 1.00 3.00 Unid.
EJE 5 1.00 0.65 2.80 1.82
1.00 2.00 2.00 4.00
1.00 1.30 2.80 3.64
1.00 2.00 2.00 4.00
1.00 0.65 2.80 1.82
15.28

4.00 3.31 1.50 19.86


2.00 2.50 1.50 7.50
27.36

AISLAMIENTO
3.00 2.20 2.40 15.84
3.00 0.47 2.40 3.38
3.00 0.45 2.40 3.24
ZONA DE BAÑOS 3.00 0.50 1.70 2.55
EJE 6 25.01

EJE K 1.00 4.21 2.40 10.10


1.00 3.10 2.40 7.44
1.00 1.39 2.40 3.34
OFICINA 1.00 4.58 2.40 10.99
EJE 6´ 31.87
EJE K
EJE M 1.00 2.51 2.40 6.02
EJE 8 1.00 0.70 2.40 1.68
1.00 1.00 2.40 2.40
GUARDIANIA 1.00 2.42 2.40 5.81
EJE A 1.00 2.00 2.40 4.80
EJE B 20.71 -
186.317
EJE 4

ILO KK CARAVISTA 6.00 1.92 1.30 14.98


7.00 3.75 1.30 34.13

CANILES 1.00 9.18 1.20 11.02


EJE 2 3.00 1.25 1.20 4.50

10.00 1.45 1.30 18.85


EJE 2´ 10.00 2.20 1.30 28.60

10.00 1.45 1.50 21.75


EJE 4 10.00 3.50 1.50 52.50
186.32
142.44
EJE 6 142.44

12.00 2.75 2.30 75.90


MURO DE LADRILLO PANDERETA CARAVISTA 9.00 3.02 2.30 62.51
CERCO DE LADRILLO 1.00 1.75 2.30 4.03
38.36
EJE 8
EJE N
7.00 2.74 2.00 38.36

DRILO PANDERETA

EJE A 77.33
M2

07.00.00 REVOQUES ENLUCIDOS Y MOLDURAS 1 2.09 1.50 3.14


TARRAJEO PRIM 1 0.75 1.50 1.13
1 2.60 1.50 3.90
1 3.65 1.50 5.48
COCINA 2 0.25 1.50 0.75
1 4.16 0.40 1.66
2 3.10 1.50 9.30
1 2.15 1.50 3.23
1 1.50 1.50 2.25
RUGIA EUTANASIA 1 3.80 1.50 5.70
2 0.90 1.50 2.70
1 3.65 1.50 5.48
BAÑADO 1 2.20 1.50 3.30
1 0.95 2.00 1.90
1 0.98 2.00 1.96
4 0.25 2.00 2.00
1 2.68 2.00 5.36
SSHH 1 0.80 1.80 1.44
1 2.57 1.20 3.08
1 2.68 1.20 3.22
1 2.88 1.20 3.46
1 2.90 1.20 3.48
1 0.45 1.20 0.54
1 0.30 1.20 0.36
1 0.58 1.20 0.70
1 1.53 1.20 1.84

M2
403.02

1.00 2.25 2.80 6.30


TARRAJEO INTERIORES 5.00 1.00 1.50 7.50
1.00 0.35 2.80 0.98
1.00 3.70 2.80 10.36
EJE G 1.00 2.75 2.80 7.70
1.00 3.25 2.80 9.10
1.00 4.25 2.80 11.90
EJE H 1.00 3.25 2.80 9.10
1.00 3.05 2.80 8.54
EJE I 1.00 3.25 2.80 9.10
1.00 3.20 2.80 8.96
EJE J 1.00 0.98 2.80 2.74
1.00 2.00 2.00 4.00
EJE K 1.00 0.98 2.80 2.74
1.00 0.65 2.80 1.82
EJE 3´ 1.00 3.20 2.00 6.40
1.00 0.65 2.80 1.82
1.00 1.30 2.80 3.64
1.00 0.65 2.80 1.82
1.00 1.60 2.00 3.20
1.00 2.00 2.00 4.00
1.00 3.65 2.80 10.22
1.00 2.24 2.80 6.27
1.00 0.76 2.80 2.13
1.00 2.15 2.80 6.02
EJE 4 1.00 6.73 2.80 18.84
1.00 3.80 2.80 10.64
1.00 0.50 2.80 1.40
1.00 0.50 2.80 1.40
1.00 3.20 2.00 6.40
EJE 5 1.00 0.65 2.80 1.82
1.00 2.00 2.00 4.00
1.00 1.30 2.80 3.64
1.00 2.00 2.00 4.00
1.00 0.65 2.80 1.82
200.33

4.00 3.31 0.50 6.62


2.00 2.50 0.50 2.50
9.12

AISLAMIENTO
3.00 2.20 2.00 13.20
3.00 0.47 2.00 2.82
3.00 0.45 2.40 3.24
ZONA DE BAÑOS 3.00 0.50 2.00 3.00
EJE 6 22.26

EJE K 1.00 4.21 2.40 10.10


1.00 3.10 2.40 7.44
1.00 1.39 2.40 3.34
OFICINA 1.00 4.58 2.40 10.99
EJE 6´ 31.87
EJE K
EJE M 1.00 2.51 2.40 6.02
EJE 8 1.00 0.70 2.40 1.68
1.00 1.00 2.40 2.40
GUARDIANIA 1.00 2.42 2.40 5.81
EJE A 1.00 2.00 2.40 4.80
EJE B 20.71

EJE 4 2.00 16.85 0.50 16.85


2.00 9.20 0.50 9.20

PARAPETO
64.00 0.15 0.20 52.80
29.00 0.30 0.25 39.88
TARRAJEO DE COLUMNAS

C-4 M2
C-5 421.15

1.00 2.25 2.80 6.30


TARRAJEO EXTERIORES 5.00 1.00 1.50 7.50
1.00 0.35 2.80 0.98
1.00 3.70 2.80 10.36
EJE G 1.00 2.75 2.80 7.70
1.00 3.25 2.80 9.10
1.00 4.25 2.80 11.90
EJE H 1.00 3.25 2.80 9.10
1.00 3.05 2.80 8.54
EJE I 1.00 3.25 2.80 9.10
1.00 3.20 2.80 8.96
EJE J 1.00 0.98 2.80 2.74
1.00 2.00 2.00 4.00
EJE K 1.00 0.98 2.80 2.74
1.00 0.65 2.80 1.82
EJE 3´ 1.00 3.20 2.00 6.40
1.00 0.65 2.80 1.82
1.00 1.30 2.80 3.64
1.00 0.65 2.80 1.82
1.00 1.60 2.00 3.20
1.00 2.00 2.00 4.00
1.00 3.65 2.80 10.22
1.00 2.24 2.80 6.27
1.00 0.76 2.80 2.13
1.00 2.15 2.80 6.02
EJE 4 1.00 6.73 2.80 18.84
1.00 3.80 2.80 10.64
1.00 0.50 2.80 1.40
1.00 0.50 2.80 1.40
1.00 3.20 2.00 6.40
EJE 5 1.00 0.65 2.80 1.82
1.00 2.00 2.00 4.00
1.00 1.30 2.80 3.64
1.00 2.00 2.00 4.00
1.00 0.65 2.80 1.82
200.33

4.00 3.31 0.50 6.62


2.00 2.50 0.50 2.50
9.12

AISLAMIENTO
3.00 2.20 2.00 13.20
3.00 0.47 2.00 2.82
3.00 0.45 2.40 3.24
ZONA DE BAÑOS 3.00 0.50 2.00 3.00
EJE 6 22.26

EJE K 1.00 4.21 2.40 10.10


1.00 3.10 2.40 7.44
1.00 1.39 2.40 3.34
OFICINA 1.00 4.58 2.40 10.99
EJE 6´ 31.87
EJE K
EJE M 1.00 2.51 2.40 6.02
EJE 8 1.00 0.70 2.40 1.68
1.00 1.00 2.40 2.40
GUARDIANIA 1.00 2.42 2.40 5.81
EJE A 1.00 2.00 2.40 4.80
EJE B 20.71

EJE 4 2.00 16.85 0.50 16.85


2.00 9.20 0.50 9.20

PARAPETO
64.00 0.15 0.20 52.80
29.00 0.30 0.25 58.00
TARRAJEO DE COLUMNAS 474.83
M2
C-4
C-5 1 3.90 13.73 53.55
1 1.35 14.79 19.97
FALSO PISO DE 2 1 4.25 11.51 48.92
1 3.35 1.11 3.72
ANILES GRANDES 1 3.35 16.18 54.20
PASADIZO 1 3.02 2.80 8.46
LAVANDERIA 1 4.85 16.15 78.33
PASADIZO 2 1 3.95 3.40 13.43
ANILES MEDIANOS 1 1.50 3.95 5.93
GUARDIANIA 1 3.80 3.95 15.01
ANILES MEDIANOS 1 1.20 8.40 10.08
BAÑADO 1 4.47 4.30 19.22
ALMACEN 1 4.47 4.25 19.00
COCINA 2 6.73 4.30 57.88
PASADIZO 1 2.60 3.75 9.75
CIRUGIA 1 4.75 4.78 22.71
RECUPERACION 1 17.00 1.50 25.50
CUARENTENA 1 11.50 0.80 9.20
ICIOS HIGIENICOS
OFICINA
VEREDAS M2 392.50

1 3.90 13.73 53.55


1 1.35 14.79 19.97
PISO DE 2" CONC 1 4.25 11.51 48.92
1 3.35 1.11 3.72
ANILES GRANDES 1 3.35 16.18 54.20
PASADIZO 1 3.02 2.80 8.46
LAVANDERIA 1 4.85 16.15 78.33
PASADIZO 2 1 1.20 8.40 10.08
ANILES MEDIANOS 2 6.73 4.30 57.88
GUARDIANIA 1 4.75 4.78 22.71
ANILES MEDIANOS 1 17.00 1.50 25.50
PASADIZO 1 11.50 0.80 9.20
CUARENTENA
OFICINA
VEREDAS
1 8.00 0.90 7.20
1 8.55 1.20 10.26
1 16.00 0.65 10.40
1 3.95 6.58 25.99
1 4.00 6.58 26.32

M2 72.58
AISLAMIENTO
CUARENTENA 1 3.95 3.40 13.43
1 1.50 3.95 5.93
PISO CERAMICO 3 1 3.80 3.95 15.01
1 4.47 4.30 19.22
BAÑADO 1 4.47 4.25 19.00
ALMACEN
COCINA
CIRUGIA
RECUPERACION

77.33
M2

10.00.00 ZOCALOS 1 2.09 1.50 3.14


ZOCALO DE CER 1 0.75 1.50 1.13
1 2.60 1.50 3.90
1 3.65 1.50 5.48
COCINA 2 0.25 1.50 0.75
1 4.16 0.40 1.66
2 3.10 1.50 9.30
1 2.15 1.50 3.23
1 1.50 1.50 2.25
RUGIA EUTANASIA 1 3.80 1.50 5.70
2 0.90 1.50 2.70
1 3.65 1.50 5.48
BAÑADO 1 2.20 1.50 3.30
1 0.95 2.00 1.90
1 0.98 2.00 1.96
4 0.25 2.00 2.00
1 2.68 2.00 5.36
SSHH 1 0.80 1.80 1.44
1 2.57 1.20 3.08
1 2.68 1.20 3.22
1 2.88 1.20 3.46
1 2.90 1.20 3.48
1 0.45 1.20 0.54
1 0.30 1.20 0.36
1 0.58 1.20 0.70
1 1.53 1.20 1.84
UND 8.00
13.00.00 CARPINTERIA METALICA
UND 5.00
MINISTRO Y COLOCACION DE PUERTAS
UND DE METAL 4.00
PUERTAS METALI UND 4.00
PUERTA METALICA UND 3.00
PUERTA METALICA UND 1.00
PUERTA METALICA UND 1.00
PUERTA METALICA UND 1.00
PUERTA NETALICA CON MALLA OLIMPICA GALVANIZADA 1"X1.5" N 8
OUERTA METALICA CON VENTANA DE VIDRIO 1.2X3M
PUERTA METALICA C/PLANCHA 3X2.3M
PUERTA METALICA UND 1.00
UND 2.00
VENTANAS METALUND 1.00
UND 3.00
VENTANA DE FIERRO
UND 3.00
VENTANA DE FIERRO
UND 1.00
VENTANA DE FIERRO
UND 5.00
VENTANA DE FIERRO C/PERFIL 2.00X0.50X2.5M
VENTANA DE FIERRO C/PERFIL 0.50X0.50X1.9M 30.00
VENTANA DE FIERRO
UND 30.00 UND
VENTANA DE FIERRO C/PERFIL 1.00X1.00M 0.00
UND 6.00
CANILES 20.00
PUERTA GUILLOTINA 8.00
MALLA METALICA PROTECTORA CO 26.00
PUERTA MAS CERCA METALICA CON MA 4.00
PUERTA MAS CERCA METALICA CON MALLA 1.45X2.00M
PUERTA MAS CERCA
M 61.00
COMEDEROS DOBLES
COMEDEROS SIMPLES
REJILLAS UND 16.00
REJILLA DE ACER UND 52.00
UND 95.00
COBERTUTA CON M2 162.00
VIGAS DE TUBO METALICO 100X50X2.5 10.00
CORREASDE TUBO 10 0.30 0.30 0.90 UND
CORREAS DE ANGULO METALICO 1"x1"x1/8"
COBERTURA DE FIBRAFORTE Y TRANSLUCIDO
BLOCK DE VIDRIO
M2
403.02
1 AREA :
PINTURA 421.15
PINTURA LATEX 1 AREA :
194.00
PINTURA EN MURO 1 AREA :

PINTURA LATEX EN MUROS EXTERIORES 02 MANOS


1 63.00 0.2 0.4 5.04
PINTADO DE CIE 1 63.00 1 1 63
1 89.00 1 1 89
CERCO DE MALLA 1 30.00 1 1 30
DEMOLICION DE C 1 30.00 1 1 30
DESMONTAJE DE CERCO DE MALLA
INSTALACION DE MALLA DE ACERO
INSTALACION DE TUBO METALICO PARA CERCO DE MALLA
PINTADO DE TUBOS PARA CERCO DE MALLA