Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
AREAS (ha)
CULTIVO DE
REFERENCIA Total
Campaña Campaña
Area Enero Feb. Mzo Abril Mayo Junio JulioAgost.Set. Oct. Nov. Dic.
Principal Secund.
(Has)
Algodón 28 28 28 28 28 28 28 28 0
Arroz 75 45 45 45 45 45 30 30 30 30 30 45 30
Maiz 22 10 10 10 10 12 12 12 12 10 12
Menestras 12 12 12 12 12 0 12
Area
cultivada
por mes 137 83 83 83 83 73 28 0 54 54 54 54 30 83 54
(Has)
Eto
Enero Feb. Marzo Abril Mayo Junio Julio Agost. Set. Oct. Nov. Dic.
mm/día
4.05 4.20 4.26 3.85 3.27 2.79 2.6 2.89 3.23 3.58 3.76 3.91
mm/mes
125.55 117.6 132.06 115.5 101.37 83.7 80.6 89.59 96.9 110.98 112.8 121.21
m3/mes/ha
1,255.50 1,176.00 1,320.60 1,155.00 1,013.70 837.00 806.00 895.90 969.00 1,109.80 1,128.00 1,212.10
Fuente: Formulador, Metodo Penman Cropwat.
Prec. efec. Enero Feb. Marzo Abril Mayo Junio Julio Agost. Set. Oct. Nov. Dic.
mm 7.40 1.30 1.20 1.40 0.00 0.00 0.00 0.00 0.00 0.30 0.30 0.10
(m3/mes/ha)
95.58 13.00 12.00 14.00 0.00 0.00 0.00 0.00 0.00 3.88 3.75 1.29
Fuente: Formulador, para estimar la precipitación efectiva método Cropwat
Coeficiente de Riego o Kc de los Cultivos
Situación Sin Proyecto
PRIMERA CAMPAÑA SEGUNDA CAMPAÑA
CULTIVO
Area (Ha) Enero Feb. Marzo Abril Mayo Junio Julio Area (Ha) Agost. Set. Oct. Nov. Dic.
Algodón 28 0.59 0.86 1.20 1.10 0.95 0.77 0
Arroz 45 0.90 1.10 1.10 1.10 0.89 30 0.90 1.10 1.10 1.10 0.89
Maiz 10 0.52 0.87 0.83 0.57 12 0.52 0.87 0.83 0.57
Menestras 0 12 0.50 0.85 0.80 0.53
Kc. Ponderado 83 0.75 0.99 1.10 1.04 0.91 0.77 54 0.73 0.99 0.97 0.86 0.89
Fuente: Formulador
DESCRIPCIÓN Enero Febrero Marzo Abril Mayo Junio Julio Agosto Set. Octubre Nov. Dic. Total
1. Kc ponderado 0.75 0.99 1.10 1.04 0.91 0.77 0.00 0.73 0.99 0.97 0.86 0.89
2. Evotranspiración Potencial (m3/mes/ha) 1,255.50 1,176.00 1,320.60 1,155.00 1,013.70 837.00 806.00 895.90 969.00 1,109.80 1,128.00 1,212.10
3. Evotranpiración Real o Uso consuntivo
(m3/mes/ha) (1*2) 941.63 1,165.42 1,453.98 1,196.58 925.51 644.49 0.00 651.32 962.22 1,079.84 965.57 1,078.77
4. Precipitación Efectiva (m3/mes/ha) 95.58 13.00 12.00 14.00 0.00 0.00 0.00 0.00 0.00 3.88 3.75 1.29
5. Déficit de Humedad (m3/mes/ha) (3-4) 846.04 1,152.42 1,441.98 1,182.58 925.51 644.49 0.00 651.32 962.22 1,075.96 961.82 1,077.48
6. Eficiencia de riego del proyecto en % 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
7. Requerimiento de agua o modulo de riego
(m3/mes/ha) (5/6) 4,230.21 5,762.08 7,209.90 5,912.90 4,627.54 3,222.45 0.00 3,256.60 4,811.09 5,379.80 4,809.09 5,387.39
8. Numero de día de mes 31 28 31 30 31 30 31 31 30 31 30 31
9. Numero de horas de jornada diaria
de riego 24 24 24 24 24 24 24 24 24 24 24 24
10. Requerimiento de agua o módulo de riego
(lts/seg/ha) = 7*1000)/(8*9*60min.*60seg) 1.579 2.382 2.692 2.281 1.728 1.243 0.000 1.216 1.856 2.009 1.855 2.011
11.-Area Total (ha) 83 83 83 83 73 28 0 54 54 54 54 30
12.- Total demanda de agua (lts/seg) 131 198 223 189 126 35 0 66 100 108 100 60
13.- Total volumen de agua demand. (MMC) (1) 0.351 0.478 0.598 0.491 0.338 0.090 0.000 0.176 0.260 0.291 0.260 0.162 3.494
(1) MMC: millones de m3
DESCRIPCIÓN Enero Febrero Marzo Abril Mayo Junio Julio Agosto Set. Octubre Nov. Dic. Total
1. Kc ponderado 0.74 0.98 1.08 1.00 0.91 0.77 0.00 0.51 0.86 0.82 0.55 0.00
2. Evotranspiración Potencial (m3/mes/ha) 1,255.50 1,176.00 1,320.60 1,155.00 1,013.70 837.00 806.00 895.90 969.00 1,109.80 1,128.00 1,212.10
3. Evotranpiración Real o Uso consuntivo
(m3/mes/ha) (1*2) 922.79 1,157.18 1,427.57 1,157.31 925.51 644.49 0.00 456.91 833.34 904.49 620.40 0.00
4. Precipitación Efectiva (m3/mes/ha) 95.58 13.00 12.00 14.00 0.00 0.00 0.00 0.00 0.00 3.88 3.75 1.29
5. Déficit de Humedad (m3/mes/ha) (3-4) 827.21 1,144.18 1,415.57 1,143.31 925.51 644.49 0.00 456.91 833.34 900.61 616.65 -1.29
6. Eficiencia de riego del proyecto en % 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44
7. Requerimiento de agua o modulo de riego
(m3/mes/ha) (5/6) 1,862.56 2,576.27 3,187.32 2,574.30 2,083.89 1,451.15 0.00 1,028.78 1,876.36 2,027.83 1,388.46 -2.91
8. Numero de día de mes 31 28 31 30 31 30 31 31 30 31 30 31
9. Numero de horas de jornada diaria
de riego 24 24 24 24 24 24 24 24 24 24 24 24
10. Requerimiento de agua o módulo de riego
(lts/seg/ha) = 7*1000)/(8*9*60min.*60seg) 0.695 1.065 1.190 0.993 0.778 0.560 0.000 0.384 0.724 0.757 0.536 -0.001
11.-Area Total 108 108 108 108 88 33 0 64 64 64 64 0
12.- Total demanda de agua (lts/seg) 75 115 129 107 68 18 0 25 46 48 34 0
13.- Total volumen de agua demand. (MMC) (1) 0.201 0.278 0.344 0.278 0.183 0.048 0.000 0.066 0.120 0.130 0.089 0.000 1.737
(1) MMC: millones de m3
FUENTE ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
Oferta MMC 0.535 0.604 0.669 0.648 0.602 0.390 0.134 0.241 0.324 0.335 0.233 0.134 4.849
TOTAL MMC 0.535 0.604 0.669 0.648 0.602 0.390 0.134 0.241 0.324 0.335 0.233 0.134 4.849
OFERTA EN 0.200 0.250 0.250 0.250 0.225 0.150 0.050 0.090 0.125 0.125 0.090 0.050
M3/SEG
Fuente: Autoridad Local de Agua
MMC: Millones de m3
FUENTE ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
Oferta MMC 0.535 0.604 0.669 0.648 0.602 0.390 0.134 0.241 0.324 0.335 0.233 0.134 4.849
TOTAL MMC 0.535 0.604 0.669 0.648 0.602 0.390 0.134 0.241 0.324 0.335 0.233 0.134 4.849
OFERTA EN 0.200 0.250 0.250 0.250 0.225 0.150 0.050 0.090 0.125 0.125 0.090 0.050
M3/SEG
Fuente: Autoridad Local de Agua
MMC: Millones de m3
Balance de Agua Sin Proyecto
DESCRIPCION UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
OFERTA M3/seg. 0.200 0.250 0.250 0.250 0.225 0.150 0.050 0.090 0.125 0.125 0.090 0.050
SUPERAVIT 0.000 0.000 0.000 0.000 0.000 0.000 0.050 0.024 0.000 0.000 0.000 -0.010
BALANCE
DEFICIT 0.069 0.052 0.026 0.061 0.099 0.116 0.050 0.024 0.025 0.016 -0.010 -0.010
DESCRIPCION UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
OFERTA M3/SEG 0.200 0.250 0.250 0.250 0.225 0.150 0.050 0.090 0.125 0.125 0.090 0.050
DEMANDA AGUA DEMANDA 0.075 0.115 0.129 0.107 0.068 0.018 0.000 0.025 0.046 0.048 0.034 0.000
CULTIVOS m3/seg.
SUPERAVIT 0.125 0.135 0.121 0.143 0.156 0.132 0.050 0.065 0.079 0.076 0.056 0.050
BALANCE
DEFICIT 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Fuente: Elaboración formulador.
Q (m/s)
0.250
OFERTA M3/SEG
DEMANDA AGUA
CULTIVOS DEMANDA
m3/seg.
0.200
0.150
0.100
0.050
0.000
1 2 3 4 5 6 7 8 9 10 11 12
Q (m/s)
Análisis de la Oferta y Demanda de Agua para Rieg
Situación Sin Proyecto
0.300
0.250
0.200
0.150
0.100
0.050
0.000
1 2 3 4 5 6 7 8 9 10
Q (m/s)
0.250
O
D
C
m
0.200
0.150
0.100
C
m
0.200
0.150
0.100
0.050
0.000
1 2 3 4 5 6 7 8 9 10
nda de Agua para Riego
Proyecto
DEMANDA AGUA
CULTIVOS DEMANDA
m3/s eg.
8 9 10 11 12
OFERTA M3/SEG
DEMANDA AGUA
CULTIVOS DEMANDA
m3/s eg.
CULTIVOS DEMANDA
m3/s eg.
8 9 10 11 12