Sei sulla pagina 1di 44

N°:

MEMORIA DE CALCULO
Hoja:
CLIENTE:
1 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

XX-08-17 EMITIDO PARA REVISION INTERNA


0
XX-08-17
A EMITIDO PARA REVISION POR CLIENTE

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
2 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

TABLA DE CONTENIDO

1. OBJETIVO ............................................................................................................................................ 4

2. ALCANCE............................................................................................................................................. 4

3. DOCUMENTOS DE REFERENCIA ..................................................................................................... 4

4. INTRODUCCIÓN .................................................................................................................................. 4

5. BASES DE CÁLCULO ......................................................................................................................... 5

6. METODOLOGÍA DE CÁLCULO .......................................................................................................... 5

6.1. Cálculo de la aceleración de flujo de reversa: ................................................................................. 5

6.2. Cálculo del golpe de ariete: ............................................................................................................... 6

7. CRITERIOS DE SELECCIÓN DE VÁLVULAS DE RETENCIÓN ....................................................... 6

8. TIPOS DE VÁLVULAS DE RETENCIÓN ............................................................................................ 9

8.1. Válvula de Retención de Disco Oblicuo - VRDO (Tilted Disc Check Valve) ................................. 9

8.2. Válvula de retención tipo silenciosa - VRS (Silent Check Valve) ................................................ 10

9. CONDICIONES MECÁNICAS DE SIMULACIÓN Y RESULTADO DE LA HIDRÁULICA ............... 12

9.1. SISTEMA DE BOMBEO 1 ESCENARIO 1: ....................................................................................... 16

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
3 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

9.2. SISTEMA DE BOMBEO 1 ESCENARIO 2: ....................................................................................... 20

9.3. SISTEMA DE BOMBEO 1 ESCENARIO 3: ............................................. Error! Bookmark not defined.

9.4. SISTEMA DE BOMBEO 2 ESCENARIO 1: ............................................. Error! Bookmark not defined.

9.5. SISTEMA DE BOMBEO 2 ESCENARIO 2: ............................................. Error! Bookmark not defined.

9.6. SISTEMA DE BOMBEO 2 ESCENARIO 2 CORREGIDO: ...................... Error! Bookmark not defined.

9.7. SISTEMA DE BOMBEO 2 ESCENARIO 3: ............................................. Error! Bookmark not defined.

10. CONCLUSIONES: .............................................................................................................................. 24

11. RECOMENDACIONES: ..................................................................................................................... 24

12. ANEXOS ............................................................................................................................................. 24

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
4 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

1. OBJETIVO

Este documento tiene por objeto analizar el análisis del golpe de ariete, del sistema propuesto para el
funcionamiento del proyecto “DISEÑO Y CONSTRUCCIÓN- TRASVASE PONGO ESTRELLANI”, definir las
características para la selección de las válvulas check necesarias para el sistema.

2. ALCANCE

Determinar los lineamientos necesarios para asegurar el funcionamiento del sistema propuesto para
“DISEÑO Y CONSTRUCCIÓN- TRASVASE PONGO ESTRELLANI”, en la ciudad de La Paz-Bolivia.

3. DOCUMENTOS DE REFERENCIA

Pliego de Especificaciones Técnicas

E-DI-1701-V7-560-BOL-001 Plano general, planimetría y perfil.

Croquis replanteo EB-I y EB-II

4. INTRODUCCIÓN

El golpe de ariete es el cambio de presión que ocurre al cambiar súbitamente la velocidad del flujo de agua.
En el caso del flujo de reversa, el flujo de reversa es frenado instantáneamente por el cierre brusco (azote)
de la válvula de retención, por lo que el pistón de agua choca contra el disco y se comprime expandiéndose
hacia los lados y hacia atrás.
El flujo de reversa se estrella contra el disco de la válvula de retención, dicha colisión genera una onda
expansiva que golpea la tubería (por dentro), alcanzándose a escuchar un golpe similar al de un martillo, por
eso se conoce como “Water Hammer”. En el momento del golpe de ariete, la compresión del pistón de agua
genera una sobrepresión que en algunos casos puede causar severos daños al sistema.

Para prevenir el golpe de ariete y azote de la válvula de retención, ésta debe:

 Cerrar rápidamente antes que el flujo de reversa alcance una velocidad considerable, con lo que
se detiene el flujo de reversa instantáneamente pero su velocidad de choque es todavía baja.

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
5 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

5. BASES DE CÁLCULO

Para la validación del sistema se tomaron las siguientes condiciones:

Agua
Descripción Temperatur Simb Unida Valor
a . d
Fluido Agua
Fórmula química H2O
Gravedad Específica 5 °C SG 1
Densidad 5 °C Rho kg/m3 999.9
Viscosidad, de 5 °C mu cP 1.446
simulación en Pipe-
flo
Presión de Vapor VP psi a 0.126
Punto de Ebullición Teb °C 100
Presión de P psi-g 0
alimentación del
agua

6. METODOLOGÍA DE CÁLCULO

Cuando una válvula se cierra rápidamente, la magnitud del aumento de la presión resultante en un líquido
se puede estimar de forma conservadora, usando la siguiente ecuación:

𝑑𝑃 = 𝜌 ∗ 𝑐 ∗ ∆𝑉 (densidad del fluido, velocidad del sonido, cambio en la velocidad)

6.1. Cálculo de la aceleración de flujo de reversa:

Para el cálculo de la aceleración de flujo de reversa se utiliza las siguientes formula:

𝑑𝑣 𝑔 𝑥 ℎ
=
𝑑𝑡 𝑙

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
6 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

𝑚
𝑑𝑣 10 𝑠2 𝑥 365 𝑚
=
𝑑𝑡 6600 𝑚

𝑑𝑣 𝑚
= 0,55 2
𝑑𝑡 𝑠

Donde:
𝑑𝑣 = Diferencial de velocidad
𝑑𝑡 = Diferencial del tiempo
𝑔 = Aceleración por gravedad
ℎ = Altura diferencial ente punto de descarga de bomba y punto de descarga final
𝑙 = Longitud desde bomba hasta punto de descarga final

6.2. Cálculo del golpe de ariete:

𝜕𝑝 𝜕𝑝
+𝛿 + 𝐹𝑉 = 0
𝜕𝑥 𝜕𝑡

Donde:
𝑝 = Presión
𝑡 = Tiempo
𝑥 = Coordenada axial
𝛿 = Densidad del fluido
𝐹 = Factor disipativo
𝑉 = Velocidad del fluido

7. CRITERIOS DE SELECCIÓN DE VÁLVULAS DE RETENCIÓN

Para seleccionar la válvula de retención que debe utilizarse, se debe considerar los siguientes cuatro
criterios:

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
7 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

1) Tipo de aplicación: Agua potable, agua cruda o agua residual


2) Potencial de Golpe de Ariete (Water Hammer)
3) Caída de Presión (Head Loss)
4) Costo

Característica VRC VRCH VRDD VRDO VRS VRT


Menor longitud x
de instalación
Aplicación agua x x
residual
Aplicación agua x x x x x x
potable/cruda
Flujo vertical x x x x x x
hacia arriba
Flujo vertical x x x
hacia abajo
Cierre x x
silencioso

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
8 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Curvas dinámicas de varias válvulas de retención

Según la ecuación de calculo de aceleración de flujo de reversa el sistema del proyecto tiene una aceleración
𝑚
de 0,55 2 , utilizando las curvas dinamicas y tomando en cuenta que las valvulas seran de 16”, se
𝑠
recomienda el uso de valvulas VRDO y VRS.

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
9 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

8. TIPOS DE VÁLVULAS DE RETENCIÓN

Las válvulas de retención tienen como propósito permitir el flujo en un sólo sentido, su aplicación principal
es en la descarga de bombas. Tiene como función prevenir que el flujo bombeado regrese una vez que las
bombas se detienen; también evitan que el flujo de retorno provoque un giro inverso de las bombas, lo cual
puede, en algunos casos, dañar los equipos de bombeo.

8.1. Válvula de Retención de Disco Oblicuo - VRDO (Tilted Disc Check Valve)

FLUJO

Características principales:

 Es una válvula de columpio pero con pivote excéntrico. El 30% del disco está por arriba del
pivote y el 70% por debajo. Cuando el disco abre, el 30% del disco por arriba del pivote auxilia en
la apertura del disco (efecto subibaja), lo cual disminuye la caída de presión.
 El disco cierra en un ángulo de 55° y su posición 100% abierta es de 15°, por lo que su
desplazamiento es sólo de 40°, lo cual disminuye el tiempo de cerrado.
 El cuerpo está dividido en dos partes (bridado al centro), lo cual ensancha el área libre de flujo al
140% del área de la tubería, disminuyendo las pérdidas de presión pero aumentando su peso,
tamaño y costo.
 Sólo puede utilizarse en aplicaciones de agua potable o agua cruda.
 Presenta una muy baja caída de presión y bajo potencial de generar golpe de ariete.
 Velocidad de cierre de 0,28 segundos.

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
10 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

8.2. Válvula de retención tipo silenciosa - VRS (Silent Check Valve)

F
L
U
J
O

Características principales:
 Se le conoce como silenciosa debido a que no produce golpe de ariete por su alta velocidad de
cierre de 0,05 segundos.
 Disponible en cuerpo compacto tipo oblea o globo (bridado). Es más ligera y económica por su
cuerpo compacto, pero no puede ser ensanchada, lo cual disminuye el área libre de flujo y
aumenta la caída de presión.
 El disco es accionado por un resorte, por lo que cierra rápidamente, pero genera mayor resistencia
a la apertura e incrementa la caída de presión.
 La distancia de cierre es lineal y muy corta (aproximadamente ¼ de su tamaño), por ejemplo una
válvula de 4” tiene una distancia de cierre de 1”.
 Sólo puede utilizarse en aplicaciones de agua potable o agua cruda.
 Presenta una alta caída de presión y muy bajo potencial de generar golpe de ariete.

Para seleccionar el tipo de válvula que se utilizara en el proyecto, se simulara el golpe de ariete dividiendo
cada los 2 sistemas de bombeo en 3 Escenarios:

- Escenario 1: Sistema sin Valvula Check


- Escenario 2: Sistema con Valvula Check VRDO con cierre de 0,28 segundos
- Escenario 3: Sistema con Valvula Check VRS con cierre de 0,05 segundos

En la simulación también se busca validar, la posición y cantidad propuestas de válvulas Check.

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
11 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
12 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

9. CONDICIONES MECÁNICAS DE SIMULACIÓN Y RESULTADO DE LA HIDRÁULICA

La simulación del sistema se realizó en el software AFT Impulse 5.

Para el análisis de Golpe de Ariete se analiza el golpe generado por el apagado súbito de las bombas,
utilizándose como datos de la bomba seleccionada los de la bomba de Rhurpumpen:

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
13 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

En la curva podemos notar que la mayor presión que requerirá el sistema es de 520 m (51 bar) de cabeza
para flujo 0 por la bomba, por lo que el sistema debería diseñarse de tal manera que las presiones se
comporten por le mismo rango de presión en el escenario critico o máximo del golpe de ariete.

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
14 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Tabla 9.1 Tabla para la selección de clase de Accesorios

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
15 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
16 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

9.1. SISTEMA DE BOMBEO 1 ESCENARIO FINAL

Imagen 9.1.1 Diagrama Simulado

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
17 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Imagen 9.1.2 Velocidad de Bomba Vs Tiempo

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
18 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Imagen 9.1.3 Presión Estatica Vs Tiempo

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
19 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

RESUMEN DEL ESCENARIO:

En la imagen 9.1.3 podemos notar que el golpe de ariete generado por el apagado subito de la
bomba genera una presión en la linea de hasta 75 bar, por lo que es necesario la utilización de
5 valvulas Check VDRS y 3 válvulas check VRS para disminuir el efecto del golpe de ariete y
proteger tanto la tuberia como las bombas.

Según la Tabla 9.1 para este scenario deben usarse accesorios Clase 2500.

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
20 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

9.2. SISTEMA DE BOMBEO 2 ESCENARIO FINAL :

Imagen 9.2.1 Diagrama Simulado

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
21 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Imagen 9.2.2 Velocidad de Bomba Vs Tiempo

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
22 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Imagen 9.2.3 Presión Estatica Vs Tiempo

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
23 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

RESUMEN DEL ESCENARIO:

En la imagen 9.2.3 podemos notar que el golpe de ariete generado por el apagado subito de la
bomba genera una presión en la linea de hasta 100 bar y en la imagen 9.2.4 de hasta 75 bar,
como podemos darnos cuenta la instalación de 3 valvulas check VDRS y 3 valvulas check VRS,
reducen al mínimo el efecto del golpe de ariete, protegiendo a las bombas.

Según la Tabla 9.1 para este scenario deben usarse accesorios Clase 600 ó 900.

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
24 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

10. CONCLUSIONES:

Del análisis de los resultados obtenidos por el simulador AFT IMPULSE; luego de cargar toda la información
sobre los diámetros y configuraciones propuestas, se determina que las posiciones y cantidad de válvulas
necesarias para el sistema son las siguientes:

También se determina que para el sistema pueden usarse Valvulas Check tipo VDRO y VRS, en cada
escenario se especifica elegida una o la otra la clase que debe solicitarse.

11. RECOMENDACIONES:

Se recomienda la selección de Valvulas Check Tipo VRS, esto para mantener la Clase del sistema en Clase
400, de esta manera reduciendo considerablemente el costo de válvulas y accesorios.

12. ANEXOS

- Reportes del software AFT IMPULSE 5 Para los escenarios y sistemas simulados

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
25 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Impulse 5 (Output) AFT Impulse Model


11/09/2017 Informe tramo 1
Page 1
DANTE

Model Reference Information

General

Title: AFT Impulse Model


Analysis run on: 11/09/2017 05:40:33 p.m.
Application version: AFT Impulse Version 5 (2015.04.14)
Input File: C:\Users\DANTE\Desktop\ARIETES\TRAMO 1\TRAMO 1.imp
Scenario: Base Scenario/Escenario 2 solo silent check
Output File: C:\Users\DANTE\Desktop\ARIETES\TRAMO 1\TRAMO 1_1.out

Steady-State Execution Time= 0,80 seconds


Total Number Of Head/Pressure Iterations= 8811
Total Number Of Flow Iterations= 525
Number Of Pipes= 16
Number Of Junctions= 15
Matrix Method= Gaussian Elimination

Transient Execution Time= 24,61 seconds


Model Start Time= 0 minutes
Model Stop Time= 3 minutes
Time Step Size= 6,324947E-05 minutes
Total Number of Time Steps= 47431
Transient Cavitation Model= Discrete Vapor Cavity Model
Artificial Transient Criteria= 0,5%
Artificial Transient Criteria Minimum Flow= 0 gal/min
Time Step Output Written to File= 4
Psi= 0,5
Threading not used

Pressure/Head Tolerance= 1E-05 relative change


Flow Rate Tolerance= 1E-05 relative change
Flow Relaxation= (Automatic)
Flow relaxation automatically lowered to 0,01
Pressure Relaxation= (Automatic)

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
26 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Constant Fluid Property Model


Fluid Database: ASME Steam/Water Tables
Fluid: ASME '97 Water
Temperature= 15 deg. C
Pressure= 8,6 psia
Max Fluid Temperature Data= 85,62275 deg. C
Min Fluid Temperature Data= 7,459852E-06 deg. C
Density= 999,0814 kg/m3
Viscosity= 2,751904 lbm/hr-ft
Bulk Modulus= 310600,7 psia
Vapor Pressure= 0,2473972 psia
Viscosity Model= Newtonian
Apply laminar and non-Newtonian correction to: Pipe Fittings & Losses, Junction K factors, Junction Special Losses, Junction
Polynomials
Corrections applied to the following junctions: Branch, Reservoir, Assigned Flow, Assigned Pressure, Area Change, Tee or Wye,
Control Valve, Spray Discharge, Relief Valve, Surge Tank
Cavitation Model= Discrete Vapor Cavity Model

Ambient Pressure (constant)= 1 atm


Gravitational Acceleration= 1 g
Turbulent Flow Above Reynolds Number= 4000

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
27 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Laminar Flow Below Reynolds Number= 2300


Maximum Steady-State Static Pressure is 4.594 psia at Pipe 64 Inlet
Minimum Steady-State Static Pressure is 7,569 psia at Pipe 28 Outlet
Maximum Transient Pressure is 4.896 psia at Pipe 64 Station 0.
Minimum Transient Pressure is 0,2474 psia at Pipe 52 Station 0.

Warnings

For an explanation of Warnings, click an item in this list and press F1 or search for 'Warnings' in the Help system.

***CAUTION*** Pipe 43 length is shorter than the elevation change (between Junction 57 (Pump) and 63 (Check Valve)).
***CAUTION*** Pipe 64 length is shorter than the elevation change (between Junction 63 (Check Valve) and 68 (Branch)).

***WARNING*** The following pipes have vapor volumes in computing stations greater than 10% but less than 100% of the liquid
computing volume:
Pipe 52, Stations: 0 (20%), 2 (11%), 23 (10%), 26 (10%)
Pipe 67, Stations: 280 (78%)
Pipe 68, Stations: 0 (39%)
Pipe 69, Stations: 0 (20%), 96 (11%), 97 (21%), 98 (14%), 99 (37%), 100 (33%)

***CRITICAL WARNING*** The following pipes have vapor volumes in computing stations greater than 100% of the liquid
computing volume:
Pipe 68, Stations: 334 (335%)

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
28 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Pump Summary

Vol. Mass dP dH Overall Speed Overall BEP % of NPSHA NPSHR


Jct
Name Flow Flow Efficiency Power BEP
(Steady)
(gal/min) (lbm/sec) (psid) (feet) (Percent) (Percent) (hp) (gal/min) (Percent) (feet) (feet)
22 Pump 2.166 301,0 655,0 1.512 65,52 100,0 1.263 4.103 52,79 18,88 17,66
57 Pump 2.166 301,0 655,0 1.512 65,52 100,0 1.263 4.103 52,79 18,88 17,66
59 Pump 2.166 301,0 655,0 1.512 65,52 100,0 1.263 4.103 52,79 18,88 17,66

Valve Summary

Vol. Mass dP dH P Static


Jct Valve Valve
Name Flow Flow Stag. In Cv K
(Steady) Type State
(gal/min) (lbm/sec) (psid) (feet) (psia)
61 Check Valve CHECK 2.166 301,0 0,1735 0,4005 661,69 5.200 0,1336 Open
62 Check Valve CHECK 2.166 301,0 0,1735 0,4005 661,69 5.200 0,1336 Open
63 Check Valve CHECK 2.166 301,0 0,1735 0,4005 4.592,96 5.200 0,1336 Open
69 Check Valve CHECK 6.498 902,9 1,5613 3,6046 663,27 5.200 1,7807 Open
70 Check Valve CHECK 6.498 902,9 1,5613 3,6046 488,42 5.200 1,7807 Open
71 Check Valve CHECK 6.498 902,9 1,5613 3,6046 311,44 5.200 1,7807 Open
72 Check Valve CHECK 6.498 902,9 1,5613 3,6046 119,91 5.200 1,7807 Open
73 Check Valve CHECK 6.498 902,9 1,5613 3,6046 37,55 5.200 1,7807 Open

Pipe Output Table

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
29 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Vol. Velocity P Static P Static Elevation Elevation dP Stag. dP Static dP Gravity


Pipe
Name Flow Rate Max Min Inlet Outlet Total Total
(Steady)
(liter/sec) (meters/sec) (bar) (bar) (meters) (meters) (psid) (psid) (psid)
28 Pipe 409,9 3,479 0,9243 0,5218 3.975 3.979 5,83684 5,83684 5,684
Vol. Velocity P Static P Static Elevation Elevation dP Stag. dP Static dP Gravity
Pipe
Name Flow Rate Max Min Inlet Outlet Total Total
(Steady)
(liter/sec) (meters/sec) (bar) (bar) (meters) (meters) (psid) (psid) (psid)
33 Pipe 136,6 1,160 0,5756 0,5743 3.979 3.979 0,01892 0,01892 0,000
35 Pipe 136,6 1,160 0,5756 0,5743 3.979 3.979 0,01892 0,01892 0,000
37 Pipe 136,6 4,234 45,6556 45,6220 3.979 3.979 0,48664 0,48664 0,000
43 Pipe 136,6 4,234 316,6735 45,6556 3.979 1.213 -3.930,78184 -3.930,78184 -3.931,268
52 Pipe 409,9 3,479 2,4810 0,5324 4.328 4.345 28,26215 28,26215 24,031
59 Pipe 136,6 1,160 0,5756 0,5743 3.979 3.979 0,01892 0,01892 0,000
60 Pipe 136,6 4,234 45,6556 45,6220 3.979 3.979 0,48664 0,48664 0,000
62 Pipe 136,6 1,160 45,6929 45,6915 3.979 3.979 0,01922 0,01922 0,000
63 Pipe 136,6 1,160 45,6929 45,6915 3.979 3.979 0,01922 0,01922 0,000
64 Pipe 136,6 1,160 316,7444 45,6915 1.213 3.979 3.931,28770 3.931,28770 3.931,268
65 Pipe 409,9 3,479 45,7305 45,6378 3.979 3.978 -1,34504 -1,34504 -1,482
66 Pipe 409,9 3,479 45,6229 33,6753 3.978 4.086 173,28537 173,28537 153,340
67 Pipe 409,9 3,479 33,5676 21,4729 4.086 4.181 175,41966 175,41966 134,996
68 Pipe 409,9 3,479 21,3652 8,2672 4.181 4.281 189,97127 189,97127 141,682
69 Pipe 409,9 3,479 8,1595 2,5887 4.281 4.328 80,79872 80,79872 66,385

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
30 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

dH P Static P Static P Stag. P Stag.


Pipe
In Out In Out
(Steady)
(feet) (psia) (psia) (bar) (bar)
33 0,04367 8,348 8,329 0,5823 0,5810
35 0,04367 8,348 8,329 0,5823 0,5810
37 1,12354 662,178 661,691 45,7451 45,7115
43 1,12354 662,178 4.592,959 45,7451 316,7630
52 9,76863 35,984 7,722 2,5415 0,5929
59 0,04367 8,348 8,329 0,5823 0,5810
60 1,12354 662,178 661,691 45,7451 45,7115
62 0,04438 662,719 662,700 45,6996 45,6983
63 0,04438 662,719 662,700 45,6996 45,6983
64 0,04438 4.593,987 662,700 316,7511 45,6983
65 0,31648 661,920 663,265 45,6983 45,7910
66 46,04838 661,704 488,419 45,6834 33,7357
67 93,32950 486,857 311,438 33,6281 21,5333
68 111,48846 309,876 119,905 21,4257 8,3276
69 33,27883 118,344 37,545 8,2200 2,6491

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
31 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Pipe Transient Results Currently Displayed Only

Step: 0 Stag. Volumetric Vapor


Time: 0,00000E+00 Pressure Flowrate Volume
Pipe -- Station (psia) (gal/min) (feet3)
28 -- 0 14,283 6.498 0
33 -- 0 8,445 2.166 0
35 -- 0 8,445 2.166 0
37 -- 0 663,476 2.166 0
43 -- 0 663,476 2.166 0
52 -- 0 36,861 6.498 0
59 -- 0 8,445 2.166 0
60 -- 0 663,476 2.166 0
62 -- 0 662,816 2.166 0
63 -- 0 662,816 2.166 0
64 -- 0 4.594,085 2.166 0
65 -- 0 662,797 6.498 0
66 -- 0 662,581 6.498 0
67 -- 0 487,734 6.498 0
68 -- 0 310,753 6.498 0
69 -- 0 119,221 6.498 0

Pipe Transient Max Min Results

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
32 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Max. Stag. Max. Stag. Max. Stag. Min. Stag. Min. Stag. Min. Stag. Max. Volumetric Max. Volumetric
Pipe Pressure Pressure Pressure Pressure Pressure Pressure Flowrate Flowrate
(psia) Time (minutes) Station (psia) Time (minutes) Station (gal/min) Time (minutes)

28 14,28 0,000 0 3,6211 0,07191 1 6.498 0,000


33 14,62 3,795E-04 1 2,6549 0,07198 1 2.166 6,325E-05
35 14,62 3,795E-04 1 2,6550 0,07198 1 2.166 6,325E-05
37 683,90 0,1682 0 1,9802 0,1683 0 2.166 0,000
43 4.594,26 6,325E-05 1 1,9803 0,1683 0 2.166 0,000
52 669,52 0,3763 0 0,2474 0,05534 0 6.711 0,4264
59 14,62 3,795E-04 1 2,6554 0,07198 1 2.166 6,325E-05
60 683,90 0,1682 0 1,9805 0,1683 0 2.166 0,000
62 964,83 0,5007 0 87,0636 0,07242 1 2.166 1,265E-04
63 964,83 0,5007 0 87,0636 0,07242 1 2.166 1,265E-04
64 4.896,10 0,5007 0 87,0636 0,07242 1 2.166 6,325E-05
65 1.052,43 0,4838 1 66,1507 0,1827 1 6.498 0,000
66 1.079,00 0,4984 35 0,2474 0,1721 73 6.498 0,000
67 1.027,33 0,4911 13 0,2474 0,07185 0 6.617 0,2465
68 891,51 0,4702 63 0,2474 0,04181 0 7.062 0,2842
69 702,61 0,4495 56 0,2474 0,05218 0 6.498 0,04054

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
33 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Max. Volumetric Min. Volumetric Min. Volumetric Min. Volumetric Max. Vapor Max. Vapor Max. Vapor
Pipe Flowrate Flowrate Flowrate Flowrate Volume Volume Volume
Station (gal/min) Time (minutes) Station (feet3) Time (minutes) Station

28 0 -77,05 0,07185 0 0,0000 0,000 0


33 0 -20,99 0,07179 0 0,0000 0,000 0
35 0 -20,99 0,07179 0 0,0000 0,000 0
37 0 -779,23 0,1684 1 0,0000 0,000 0
43 0 -779,23 0,1684 1 0,0000 0,000 0
52 1 -8.502,27 0,4458 1 2,2000 0,4077 2
59 0 -20,99 0,07179 0 0,0000 0,000 0
60 0 -779,23 0,1684 1 0,0000 0,000 0
62 1 -1.685,82 0,4959 1 0,0000 0,000 0
63 1 -1.685,82 0,4959 1 0,0000 0,000 0
64 1 -1.685,82 0,4959 1 0,0000 0,000 0
65 0 -5.298,20 0,5006 1 0,0000 0,000 0
66 0 -5.460,74 0,4983 36 0,4368 0,09108 138
67 266 -6.654,70 0,1836 265 7,6957 0,1210 280
68 154 -6.426,30 0,1845 2 32,9167 0,2028 334
69 0 -8.809,05 0,4482 76 7,1680 0,3929 99

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
34 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Pipe Volume Volume Volume


Time (minutes) Station

28 0,000 0,000 0
33 0,000 0,000 0
35 0,000 0,000 0
37 0,000 0,000 0
43 0,000 0,000 0
52 10,999 0,4077 2
59 0,000 0,000 0
60 0,000 0,000 0
62 0,000 0,000 0
63 0,000 0,000 0
64 0,000 0,000 0
65 0,000 0,000 0
66 4,445 0,09108 138
67 78,386 0,1210 280
68 334,799 0,2028 334
69 36,564 0,3929 99

All Junction Table

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
35 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Name P Static P Static P Stag. In P Stag. Vol. Flow Mass Flow Loss
Jct In Out Out Rate Thru Jct Rate Thru Jct Factor (K)
(Steady) (psia) (psia) (psia) (psia) (gal/min) (lbm/sec)

22 Pump 8,329 662,178 8,426 663,476 2.166 301,0 0,0000


38 Reservoir 8,599 8,599 8,599 8,599 6.498 902,9 0,0000
51 Branch 8,226 8,226 8,445 8,445 N/A N/A 0,0000
57 Pump 8,329 662,178 8,426 663,476 2.166 301,0 0,0000
59 Pump 8,329 662,178 8,426 663,476 2.166 301,0 0,0000
61 Check Valve 661,691 662,719 662,990 662,816 2.166 301,0 0,1336
62 Check Valve 661,691 662,719 662,990 662,816 2.166 301,0 0,1336
63 Check Valve 4.592,959 4.593,987 4.594,258 4.594,085 2.166 301,0 0,1336
68 Branch 662,578 662,578 662,797 662,797 N/A N/A 0,0000
69 Check Valve 663,265 661,704 664,142 662,581 6.498 902,9 1,7807
70 Check Valve 488,419 486,857 489,295 487,734 6.498 902,9 1,7807
71 Check Valve 311,438 309,876 312,315 310,753 6.498 902,9 1,7807
72 Check Valve 119,905 118,344 120,782 119,221 6.498 902,9 1,7807
73 Check Valve 37,545 35,984 38,422 36,861 6.498 902,9 1,7807

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
36 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Impulse 5 (Output) AFT Impulse Model Informe tramo 2


11/09/2017
Page 1
DANTE

Model Reference Information

General

Title: AFT Impulse Model


Analysis run on: 11/09/2017 03:05:15 p.m.
Application version: AFT Impulse Version 5 (2015.04.14)
Input File: E:\tramo 2 corregido\TRAMO 2.imp
Scenario: Base Scenario/Escenario 2 solo silent check
Output File: E:\tramo 2 corregido\TRAMO 2_2.out

Steady-State Execution Time= 0,21 seconds


Total Number Of Head/Pressure Iterations= 495
Total Number Of Flow Iterations= 44
Number Of Pipes= 14
Number Of Junctions= 13
Matrix Method= Gaussian Elimination

Transient Execution Time= 24,45 seconds


Model Start Time= 0 minutes
Model Stop Time= 3 minutes
Time Step Size= 6,511845E-05 minutes
Total Number of Time Steps= 46069
Transient Cavitation Model= Discrete Vapor Cavity Model
Artificial Transient Criteria= 0,5%
Artificial Transient Criteria Minimum Flow= 0 gal/min
Time Step Output Written to File= 4
Psi= 0,5
Threading not used

Pressure/Head Tolerance= 1E-05 relative change


Flow Rate Tolerance= 1E-05 relative change
Flow Relaxation= (Automatic)
Pressure Relaxation= (Automatic)

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
37 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Constant Fluid Property Model


Fluid Database: ASME Steam/Water Tables
Fluid: ASME '97 Water
Temperature= 15 deg. C
Pressure= 8,6 psia
Max Fluid Temperature Data= 85,62275 deg. C
Min Fluid Temperature Data= 7,459852E-06 deg. C
Density= 999,0814 kg/m3
Viscosity= 2,751904 lbm/hr-ft
Bulk Modulus= 310600,7 psia
Vapor Pressure= 0,2473972 psia
Viscosity Model= Newtonian
Apply laminar and non-Newtonian correction to: Pipe Fittings & Losses, Junction K factors, Junction Special Losses, Junction
Polynomials
Corrections applied to the following junctions: Branch, Reservoir, Assigned Flow, Assigned Pressure, Area Change, Tee or Wye,
Control Valve, Spray Discharge, Relief Valve, Surge Tank
Cavitation Model= Discrete Vapor Cavity Model

Ambient Pressure (constant)= 1 atm


Gravitational Acceleration= 1 g
Turbulent Flow Above Reynolds Number= 4000
Laminar Flow Below Reynolds Number= 2300

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
38 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Pump Summary

Vol. Mass dP dH Overall Speed Overall BEP % of NPSHA NPSHR


Jct
Name Flow Flow Efficiency Power BEP
(Steady)
(gal/min) (lbm/sec) (psid) (feet) (Percent) (Percent) (hp) (gal/min) (Percent) (feet) (feet)
22 Pump 2.896 402,4 610,7 1.410 74,37 100,0 1.387 4.103 70,59 28,10 20,18
57 Pump 2.896 402,4 610,7 1.410 74,37 100,0 1.387 4.103 70,59 28,10 20,18
59 Pump 2.896 402,4 610,7 1.410 74,37 100,0 1.387 4.103 70,59 28,10 20,18

Valve Summary

Vol. Mass dP dH P Static


Jct Valve Valve
Name Flow Flow Stag. In Cv K
(Steady) Type State
(gal/min) (lbm/sec) (psid) (feet) (psia)
61 Check Valve CHECK 2.896 402,4 0,3101 0,7160 619,91 5.200 0,1336 Open
62 Check Valve CHECK 2.896 402,4 0,3101 0,7160 619,91 5.200 0,1336 Open
63 Check Valve CHECK 2.896 402,4 0,3101 0,7160 4.908,10 5.200 0,1336 Open
69 Check Valve CHECK 8.688 1.207,3 2,7911 6,4439 493,49 5.200 1,7807 Open
70 Check Valve CHECK 8.688 1.207,3 2,7911 6,4439 366,42 5.200 1,7807 Open
71 Check Valve CHECK 8.688 1.207,3 2,7911 6,4439 38,81 5.200 1,7807 Open

Pipe Output Table

Vol. Velocity P Static P Static Elevation Elevation dP Stag. dP Static


Pipe
Name Flow Rate Max Min Inlet Outlet Total Total
(Steady)
(liter/sec) (meters/sec) (bar) (bar) (meters) (meters) (psid) (psid)
28 Pipe 548,1 4,651 0,7748 0,7504 4.341 4.341 0,35385 0,35385
33 Pipe 182,7 1,550 0,8464 0,8442 4.341 4.341 0,03269 0,03269

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
39 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Vol. Velocity P Static P Static Elevation Elevation dP Stag. dP Static


Pipe
Name Flow Rate Max Min Inlet Outlet Total Total
(Steady)
(liter/sec) (meters/sec) (bar) (bar) (meters) (meters) (psid) (psid)
35 Pipe 182,7 1,550 0,8464 0,8442 4.341 4.341 0,03269 0,03269
37 Pipe 182,7 5,661 42,8001 42,7411 4.341 4.341 0,85552 0,85552
43 Pipe 182,7 5,661 338,4017 42,8001 4.341 1.323 -4.287,33805 -4.287,33805
52 Pipe 548,1 4,651 2,4833 0,4848 4.681 4.692 28,98630 28,98630
59 Pipe 182,7 1,550 0,8464 0,8442 4.341 4.341 0,03269 0,03269
60 Pipe 182,7 5,661 42,8001 42,7411 4.341 4.341 0,85552 0,85552
62 Pipe 182,7 1,550 42,8678 42,8655 4.341 4.341 0,03263 0,03263
63 Pipe 182,7 1,550 42,8678 42,8655 4.341 4.341 0,03263 0,03263
64 Pipe 182,7 1,550 338,5284 42,8655 1.323 4.341 4.288,22620 4.288,22620
65 Pipe 548,1 4,651 42,7695 34,0247 4.341 4.416 126,83283 126,83283
66 Pipe 548,1 4,651 33,8322 25,2641 4.416 4.481 124,27046 124,27046
67 Pipe 548,1 4,651 25,0716 2,6758 4.481 4.681 324,82474 324,82474
dP Gravity dH P Static P Static P Stag. P Stag.
Pipe
In Out In Out
(Steady)
(psid) (feet) (psia) (psia) (bar) (bar)
28 0,08544 0,61970 11,24 10,883 0,8829 0,8585
33 0,00000 0,07547 12,28 12,244 0,8585 0,8562
dP Gravity dH P Static P Static P Stag. P Stag.
Pipe
In Out In Out
(Steady)
(psid) (feet) (psia) (psia) (bar) (bar)
35 0,00000 0,07547 12,28 12,244 0,8585 0,8562
37 0,00000 1,97520 620,76 619,907 42,9602 42,9012
43 -4.288,19357 1,97520 620,76 4.908,101 42,9602 338,5618
52 15,17137 31,89563 36,02 7,031 2,5914 0,5929
59 0,00000 0,07547 12,28 12,244 0,8585 0,8562
60 0,00000 1,97520 620,76 619,907 42,9602 42,9012
62 0,00000 0,07533 621,74 621,712 42,8798 42,8776
63 0,00000 0,07533 621,74 621,712 42,8798 42,8776
64 4.288,19357 0,07533 4.909,94 621,712 338,5404 42,8776
65 106,97194 45,85441 620,32 493,486 42,8776 34,1327
66 92,60254 73,11424 490,69 366,424 33,9403 25,3721

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
40 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Pipe Transient Results Currently Displayed Only

Step: 0 Stag. Volumetric Vapor


Time: 0,00000E+00 Pressure Flowrate Volume
Pipe -- Station (psia) (gal/min) (feet3)
28 -- 0 12,805 8.688 0
33 -- 0 12,451 2.896 0
35 -- 0 12,451 2.896 0

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
41 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Step: 0 Stag. Volumetric Vapor


Time: 0,00000E+00 Pressure Flowrate Volume
Pipe -- Station (psia) (gal/min) (feet3)
37 -- 0 623,084 2.896 0
43 -- 0 623,084 2.896 0
52 -- 0 37,585 8.688 0
59 -- 0 12,451 2.896 0
60 -- 0 623,084 2.896 0
62 -- 0 621,919 2.896 0
63 -- 0 621,919 2.896 0
64 -- 0 4.910,112 2.896 0
65 -- 0 621,886 8.688 0
66 -- 0 492,262 8.688 0
67 -- 0 365,201 8.688 0

Pipe Transient Max Min Results

Max. Stag. Max. Stag. Max. Stag. Min. Stag. Min. Stag. Min. Stag. Max. Volumetric Max. Volumetric
Pipe Pressure Pressure Pressure Pressure Pressure Pressure Flowrate Flowrate
(psia) Time (minutes) Station (psia) Time (minutes) Station (gal/min) Time (minutes)

28 31,77 0,05737 1 0,2474 0,05548 1 8.688 1,302E-04


33 33,90 0,05737 1 0,2474 0,05548 0 2.896 0,000
35 33,90 0,05737 1 0,2474 0,05548 0 2.896 0,000
37 623,08 0,000 0 58,0878 0,05978 0 2.896 0,000
43 4.910,42 6,512E-05 1 58,0876 0,05978 0 2.896 0,000
52 928,94 0,2269 52 0,2474 0,02416 0 12.527 0,2792
59 33,90 0,05737 1 0,2474 0,05548 0 2.896 0,000
60 623,08 0,000 0 58,0878 0,05978 0 2.896 0,000
62 1.369,35 0,2556 0 73,8392 0,05737 0 2.896 6,512E-05
63 1.369,35 0,2556 0 73,8392 0,05737 0 2.896 6,512E-05
64 5.657,54 0,2556 0 76,5606 0,05685 1 2.896 0,000
65 1.492,37 0,2553 3 0,2474 0,06694 65 8.688 6,512E-05
66 1.483,92 0,2613 10 0,2474 0,07704 6 8.688 5,014E-03

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
42 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

Pipe Flowrate Flowrate Flowrate Flowrate Volume Volume Volume


Station (gal/min) Time (minutes) Station (feet3) Time (minutes) Station

28 0 -224,80 0,06056 0 0,001780 0,05711 1


33 0 -63,32 0,06050 0 0,001780 0,05711 0
35 0 -63,32 0,06050 0 0,001780 0,05711 0
37 0 -341,23 0,06271 1 0,000000 0,000 0
43 0 -341,23 0,06271 1 0,000000 0,000 0
52 11 -13.712,44 0,2271 51 22,565994 0,1384 0
59 0 -63,32 0,06050 0 0,001780 0,05711 0
60 0 -341,23 0,06271 1 0,000000 0,000 0
62 0 -2.480,34 0,2669 1 0,000000 0,000 0
63 0 -2.480,34 0,2669 1 0,000000 0,000 0
64 0 -2.480,34 0,2669 1 0,000000 0,000 0
65 0 -7.649,67 0,2547 12 0,006279 0,09208 69
66 0 -7.506,04 0,2482 37 0,218608 0,07345 121
67 151 -7.414,79 0,2357 108 23,407818 0,1384 154
Max. Pct. Vapor Max. Pct. Vapor Max. Pct. Vapor
Pipe Volume Volume Volume
Time (minutes) Station

28 0,01711 0,05711 1
33 0,01711 0,05711 0
35 0,01711 0,05711 0
37 0,00000 0,000 0
43 0,00000 0,000 0
52 223,47062 0,1384 0
59 0,01711 0,05711 0
60 0,00000 0,000 0
62 0,00000 0,000 0
63 0,00000 0,000 0
64 0,00000 0,000 0
65 0,03099 0,09208 69
66 2,15479 0,07345 121
67 231,35363 0,1384 154

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO
Hoja:
CLIENTE:
43 de 44
MINISTERIO DE MEDIO AMBIENTE Y AGUA
PROYECTO:
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ

TITULO:
SIMULACIÓN GOLPE DE ARIETE

INDICE DE REVISIONES

Fecha Revisión Observaciones

All Junction Table

Name P Static P Static P Stag. In P Stag. Vol. Flow Mass Flow Loss
Jct In Out Out Rate Thru Jct Rate Thru Jct Factor (K)
(Steady) (psia) (psia) (psia) (psia) (gal/min) (lbm/sec)

21 Reservoir 8,599 12,805 8,599 12,805 8.688 1.207,3 0,0000


22 Pump 12,244 620,763 12,418 623,084 2.896 402,4 0,0000
38 Reservoir 8,599 8,599 8,599 8,599 8.688 1.207,3 0,0000
51 Branch 12,059 12,059 12,451 12,451 N/A N/A 0,0000
57 Pump 12,244 620,763 12,418 623,084 2.896 402,4 0,0000

D. CUELLAR WILBERT MENDEZ DENAR GIL


ELABORADO POR REVISADO POR APROBADO POR
N°:
MEMORIA DE CALCULO XXXXX
Hoja:
PROYECTO: 44 de 44
PROYECTO CONSTRUCCION TRASVASE PONGO ESTRELLANI – LA PAZ
TITULO:
SIMULACIÓN GOLPE DE ARIETE

Name P Static P Static P Stag. In P Stag. Vol. Flow Mass Flow Loss
Jct In Out Out Rate Thru Jct Rate Thru Jct Factor (K)
(Steady) (psia) (psia) (psia) (psia) (gal/min) (lbm/sec)

59 Pump 12,244 620,763 12,418 623,084 2.896 402,4 0,0000


61 Check Valve 619,907 621,745 622,229 621,919 2.896 402,4 0,1336
62 Check Valve 619,907 621,745 622,229 621,919 2.896 402,4 0,1336
63 Check Valve 4.908,101 4.909,938 4.910,422 4.910,112 2.896 402,4 0,1336
68 Branch 621,494 621,494 621,886 621,886 N/A N/A 0,0000
69 Check Valve 493,486 490,695 495,053 492,262 8.688 1.207,3 1,7807
70 Check Valve 366,424 363,633 367,992 365,201 8.688 1.207,3 1,7807
71 Check Valve 38,809 36,017 40,376 37,585 8.688 1.207,3 1,7807