CUADRO DE PRESUPUESTO ANALITICO 2019

OBRA : “ MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES DE HUACCCHALLA EN EL DISTRITO DE SAN ANTONIO DE ANTAPARCO - ANGARAES HUANCAVELICA”

COMPONENTE :

META : “ MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES DE HUACCCHALLA EN EL DISTRITO DE SAN ANTONIO DE ANTAPARCO - ANGARAES HUANCAVELICA” PRESUPUESTO TOTAL S/. 115,843.12

FECHA : May-19 COSTO DIRECTO 98,827.00


COSTO INDIRECTO 17,016.12

ANALITICO 2019
ACT/ PPTO 01
Nª ORD FU SPR T
PROY
T COMP META DESCRIPCION PROGR.
HABILIT. 2013 CLASIF.
DESCRIPCION UNID CANT COSTO UNIT COSTO DIRECTO COSTO INDIRECTO COSTO TOTAL

2.6.2.3.53 COSTO DE CONSTRUCCION PARA ADMINISTRACION DIRECTA - PERSONAL


RETRIB. Y COMPLEMENTOS/CONTRATOS A PLAZO FIJO 28,405.84 15,600.00 44,005.84

PERSONAL OBRERO MES 2.00 14,202.92 28,405.84


INGENIERO RESIDENTE MES 2.00 3,600.00 7,200.00
MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES DE SUPERVISOR DE OBRA MES 2.00 4,000.00 4,000.00
HUACCCHALLA EN EL DISTRITO DE SAN ANTONIO DE ANTAPARCO - 115,843.12 MAESTRO DE OBRA MES 2.00 2,200.00 4,400.00
ANGARAES HUANCAVELICA 2.6.2.3.54 COSTO DE CONSTRUCCION PARA ADMINISTRACION DIRECTA - BIENES 61,673.16 992.30 62,665.46
VIATICOS Y ASIGNACIONES 0.00 0.00

VESTUARIO 0.00 226.00


Botas de jebe Par 4.00 25.00 100.00
Cascos de seguridad (2 blancos) Und. 3.00 30.00 90.00
Guantes de jebe Par. 4.00 9.00 36.00

COMBUSTIBLE Y LUBRICANTE 0.00 514.30


Gasolina de 95 octanos Gln 37.00 13.90 514.30
Petroleo Diesel D-2 Gln
MATERIALES DE CONSTRUCCION 61,673.16 0.00
ALAMBRE NEGRO RECOCIDO # 8 kg 28.01 5.00 140.05
CLAVOS PARA MADERA C/C 2 1/2" kg 21.38 5.00 106.88
CLAVOS PARA MADERA C/C 2" kg 11.28 5.00 56.38
CLAVOS PARA MADERA C/C 3" kg 66.94 5.00 334.71
PUERTA METALICA m2 21.42 200.00 4,284.00
VENTANA METALICA m2 25.46 150.00 3,819.00
ARENA FINA m3 16.61 90.00 1,494.84
TIERRA CERNIDA m3 0.60 40.00 24.00
ARENA GRUESA m3 3.62 70.00 253.27
CONDUCTOR DE COBRE CABLEADO TW #14 m 459.00 1.00 459.00
CONECTOR und 1.00 6.00 6.00
ADQUISICION DE MOBILIARIOS GLB 1.00 4,000.00 4,000.00
INODORO TANQUE BAJO NORMAL INCLUYE ACCESORIOS und 2.00 280.00 560.00
LAVATORIO SONNET BLANCO COMERCIAL pza 2.00 200.00 400.00
REGISTRO DE BRONCE DE 3" und 2.00 15.00 30.00
LLAVE DE CUCHILLA 2 x 20 A und 3.00 45.00 135.00
CAJA OCTOGONAL GALV. 4" X 2" X 2" und 49.00 3.00 147.00
CAJA RECTANG GALV. 4"x2"x2" und 22.00 3.50 77.00
CHAPA ALPHA G-24 und 1.00 20.00 20.00
CAJA METALICA P/CUCHILLA 3 LLAVES und 1.00 45.00 45.00
CAJA DE CONCRETO C/TAPA und 1.00 45.00 45.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 219.85 26.00 5,716.14
CINTA TEFLON rll 19.00 2.00 38.00
VARILLA DE COBRE DE 1/2" x 8" und 1.00 140.00 140.00
PORCELANA kg 1.00 5.00 5.00
CUADRO DE PRESUPUESTO ANALITICO 2019
OBRA : “ MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES DE HUACCCHALLA EN EL DISTRITO DE SAN ANTONIO DE ANTAPARCO - ANGARAES HUANCAVELICA”

COMPONENTE :

META : “ MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES DE HUACCCHALLA EN EL DISTRITO DE SAN ANTONIO DE ANTAPARCO - ANGARAES HUANCAVELICA” PRESUPUESTO TOTAL S/. 115,843.12

FECHA : May-19 COSTO DIRECTO 98,827.00


COSTO INDIRECTO 17,016.12

ANALITICO 2019
ACT/ PPTO 01
Nª ORD FU SPR T
PROY
T COMP META DESCRIPCION PROGR.
HABILIT. 2013 CLASIF.
DESCRIPCION UNID CANT COSTO UNIT COSTO DIRECTO COSTO INDIRECTO COSTO TOTAL

PEGAMENTO PARA PVC AGUA FORDUIT gln 1.00 80.00 80.21


IMPRIMANTE kg 88.34 25.00 2,208.46
CARTEL DE OBRA (2.40*3.60M) GLB 1.00 440.00 440.00
LIJA und 48.44 8.00 387.48
FLETE TERRESTRE GLB 1.00 1,500.00 1,500.00
PIEDRA CHANCADA DE 1/2" m3 6.44 70.00 450.91
MADERA NACIONAL P/ENCOFRADO-CARP p2 674.45 5.00 3,372.25
REGLA DE MADERA p2 30.81 5.50 169.45
ESTACA DE MADERA p2 0.57 5.50 3.14
MADERA TORNILLO p2 3,616.69 5.50 19,891.79
BARANDA DE MADERA H=1.00 m 18.06 80.00 1,444.80
TRIPLAY LUPUNA DE 4'x8'x 4 mm pln 97.41 25.00 2,435.20
THINER gln 2.62 25.00 65.41
PINTURA LATEX gln 24.22 40.00 968.71
PINTURA ESMALTE gln 12.46 40.00 498.52
BARNIZ gln 0.18 45.00 8.10
SULFATO DE MAGNESIO kg 2.00 20.00 40.00
UNION UNIVERSAL DE Fo. GALV. DE 1/2" und 8.00 15.00 120.00
UNION UNIVERSAL DE F° F° und 2.00 24.00 48.00
NIPLE DE F° GALV. DE 1/2" X 2" pza 8.00 3.00 24.00
TUBERIA PVC SAP C-10 DE 1/2" m 16.48 10.00 164.80
TUBERIA PVC SAP C-10 DE 3/4" m 4.12 5.00 20.60
CURVA PESADO PVC SAP P/INST. ELECT. 3/4" und 73.00 3.50 255.50
TEE PVC SAP CLASE 10 - 1/2" und 4.00 5.00 20.00
TEE PVC SAP CLASE 10 - 3/4" und 4.00 5.00 20.00
YEE PVC SAL 4" und 6.00 5.00 30.00
YEE PVC SAL 2" und 6.00 5.00 30.00
CODO PVC SAP 2" X 90° pza 6.00 6.00 36.00
CODO PVC SAL 4" X 90° pza 6.00 6.00 36.00
CODO PVC SAL 2" X 90° pza 2.00 5.00 10.00
CODO PVC SAP PARA AGUA DE 1/2"X 90° pza 4.00 5.00 20.00
CODO PVC SAP PARA AGUA DE 3/4"X 90° pza 4.00 5.00 20.00
UNION PVC SAP PARA AGUA CON ROSCA DE 1/2" und 2.40 5.00 12.00
TUBERIA PVC SAL PARA DESAGUE DE 4"X 3m m 17.30 15.00 259.56
TUBERIA PVC SAL PARA DESAGUE DE 2"X 3m und 7.21 10.00 72.10
YESO EN BOLSA DE 25 Kg. BOL 0.29 7.00 2.00
TUBO PVC SEL (E/C) 3/4" X 3.00 M. pza 56.00 5.00 280.00
UNION PVC SEL 3/4" pza 98.00 3.50 343.00
VALVULA DE COMPUERTA DE BRONCE DE 1/2" und 4.00 25.00 100.00
CINTA AISLANTE m 39.20 1.00 39.20
LIJA PARA FIERRO und 5.67 5.00 28.33
PINTURA ANTICORROSIVA gln 3.80 40.00 151.85
CUADRO DE PRESUPUESTO ANALITICO 2019
OBRA : “ MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES DE HUACCCHALLA EN EL DISTRITO DE SAN ANTONIO DE ANTAPARCO - ANGARAES HUANCAVELICA”

COMPONENTE :

META : “ MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES DE HUACCCHALLA EN EL DISTRITO DE SAN ANTONIO DE ANTAPARCO - ANGARAES HUANCAVELICA” PRESUPUESTO TOTAL S/. 115,843.12

FECHA : May-19 COSTO DIRECTO 98,827.00


COSTO INDIRECTO 17,016.12

ANALITICO 2019
ACT/ PPTO 01
Nª ORD FU SPR T
PROY
T COMP META DESCRIPCION PROGR.
HABILIT. 2013 CLASIF.
DESCRIPCION UNID CANT COSTO UNIT COSTO DIRECTO COSTO INDIRECTO COSTO TOTAL

CODO PVC SAL 3"X90° pza 6.00 5.00 30.00


TEODOLITO hm 1.14 8.00 9.14
LIJA PARA MADERA und 0.45 5.00 2.25
CAJA GALVIZADA 100 x 100 x 30mm und 49.00 3.50 171.50
INTERRUPTOR SIMPLE BIPOLAR BAKELITA und 24.00 1.00 24.00
CURVA PVC SEL PARA INSTALACIONES ELECTRICAS 3/4" und 44.00 3.50 154.00
INTERRUPTOR BAKELITA X 1 SWITCH und 22.00 5.00 110.00
TIRAFONES PARA TEJAS DE 1/4" X 2" pza 8.00 10.00 80.00
GRIFO DE BRONCE DE 1/2" und 4.00 5.00 20.00
ELIMINACION DE DESECHOS DE CONSTRUCCION GLB 1.00 1,144.68 1,144.68
MASILLA PARA VIDRIO kg 3.46 3.50 12.09
VIDRIO SEMIDOBLE INCOLORO CRUDO p2 241.89 1.69 408.79
SILICONA und 12.00 10.59 127.08
LAMPA TIPO CUCHARA und 6.00 36.00 216.00
PICO C/MANGO und 5.00 36.00 180.00
BUGGIE und 4.00 135.00 540.00

MATERIALES DE ESCRITORIO 0.00 252.00


PAPEL BOND DE 80 GRS A4 ATLAS millar 4.00 26.00 104.00
CUADERNO A4 DE 100 HOJAS Unid 4.00 6.00 24.00
CUADERNO DE OBRA AUTOCOPIATIVO DE 100 HOJAS CUADRICULADO Unid 1.00 35.00 35.00
LAPICERO PILOT Unid 7.00 7.00 49.00
ARCHIVADOR 3.00 10.00 30.00
FOLDER MANILA A4 10.00 1.00 10.00

2.6.2.3.5.5 COSTO DE CONSTRUCCION PARA ADMINISTRACION DIRECTA - SERVICIOS 8,748.00 423.82 9,171.82
OTROS SERVICIOS DE TERCEROS 8,748.00 423.82
COPIAS FOTOSTATICAS GLB 1.00 231.82 231.82
PLOTEO PLANOS A1 GLB 1.00 82.00 82.00
LEGALIZACION DE CUADERNO DE OBRA GLB 1.00 20.00 20.00
ELABORACION DE SELLOS GLB 3.00 30.00 90.00
MEZCLADORA DE CONCRETO DE 9 -11P3 hm 15.00 8.00 120.00
VIBRADOR DE CONCRETO 4 HP 2.40" hm 2.00 8.00 16.00
PLANCHA COMPACTADORA 11P3 hm 16.00 7.00 112.00
EXPEDIENTE TECNICO GLB 1.00 8,500.00 8,500.00

TOTAL S/. 98,827.00 17,016.12 115,843.12


RESUMEN DEL PRESUPUESTO ANALITICO 2019
PROYECTO “ MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES DE HUACCCHALLA EN EL DISTRITO DE SAN ANTONIO DE ANTAPARCO - ANGARAES HUANCAVELICA”

ACTIVIDAD
FUNCIÓN
DIVIS. FUNCIONAL
GRUPO FUNCIONAL

META “ MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES DE HUACCCHALLA EN EL DISTRITO DE SAN ANTONIO DE ANTAPARCO - ANGARAES HUANCAVELICA”

FTE. FTO.
MONTO 115,843.11

PARTIDA PPTAL DETALLE COSTO DIRECTO COSTO INDIRECTO TOTAL

2.6.2.3.5.3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL 28,405.84 15,600.00 44,005.84

2.6.2.3.54 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES 61,673.16 992.30 62,665.46

2.6.2.3.55 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIO 8,748.00 423.82 9,171.82

TOTAL S/. 98,827.00 17,016.12 115,843.11