I PEKERJAAN ARSITEKTUR
I.1 Pek. Lantai GF
I.1.1 Pek. Dinding
1 Bata ringan 1,094.58 985.12 m2 985.12
2 Kolom praktis 491.60 442.44 m' 442.44
3 Plesteran interior 1,286.82 1,158.14 m2 1,158.14
4 Plesteran exterior 769.84 692.85 m2 692.85
5 Acian interior 1,286.82 1,158.14 m2 1,158.14
6 Acian exterior 769.84 692.85 m2 692.85
7 Skim coat 623.25 560.93 m2 560.93
I.1.2 Pek. Lantai
1 Lantai keramik 444.12 m2 -
2 Floor hardener 119.29 m2 -
3 Dinding Keramik 119.29 m2 -
I.1.3 Pek Pintu & Jendela
1 Pintu P1 (800x1200) 2.00 unit -
2 Pintu PB6 (1000x2100) 1.00 unit -
3 Pintu PB1a (1100x2100) 4.00 4.00 unit 4.00
4 Pintu PB3 (2000x2100) 1.00 unit -
5 Pintu PB2 (1000x2100) 6.00 unit -
6 Pintu PB4 (1090x1200) 1.00 unit -
7 Pintu PB5 (600x1200) 3.00 unit -
8 Jendela J1 (970x2100) 2.00 unit -
I.1.4 Pek. Pintu Kaca
1 Pintu (2500x6000mm) kaca tempered tebal 12mm / CW1 15.00 m2 -
2 Mesin Automatic Sliding Door kap. 2x200 kg / CW1 1.00 unit -
3 Pintu (3500x2500mm) kaca tempered tebal 12mm / CW2 8.75 m2 -
4 Mesin Automatic Slidding Door 2x150 kg / CW2 1.00 unit -
5 Pintu 2000x2500mm kaca tempered tebal 12mm / CW3. 10.00 m2 -
6 Pintu 800x2500mm kaca tempered tebal 12mm / CW1, CW2. 6.00 m2 -
1 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019
2 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019
3 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019
L. Pek. Tambahan
L.1 Pek. Penambahan Struktur + ACP Red Box
- Struktur ACP Redbox 14,602.00 14,602.00 kg 14,602.00
- ACP Red Box 633.50 633.50 m2 633.50
4 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019
5 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019
6 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019
7 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019
8 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019
9 dari 13
QTY/H (SEPTEMBER 2019)
No. URAIAN PEKERJAAN SISA VOLUME SAT
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019 KALKULASI
B PEKERJAAN ARSITEKTUR
Pek. Lantai GF
Pek. Dinding
1 Bata ringan 109.46 m2
2 Kolom praktis 49.16 m'
3 Plesteran interior 128.68 m2
4 Plesteran exterior 76.98 m2
5 Acian interior 128.68 m2
6 Acian exterior 76.98 m2
Pek. Lantai
1 Lantai keramik 444.12 m2
2 Floor hardener 119.29 m2
3 Dinding Keramik 119.29 m2
Pek Pintu & Jendela
1 Pintu P1 (800x1200) 2.00 unit
2 Pintu PB6 (1000x2100) 1.00 unit
4 Pintu PB3 (2000x2100) 1.00 unit
5 Pintu PB2 (1000x2100) 6.00 unit
6 Pintu PB4 (1090x1200) 1.00 unit
7 Pintu PB5 (600x1200) 3.00 unit
8 Jendela J1 (970x2100) 2.00 unit
Pek. Pintu Kaca
1 Pintu (2500x6000mm) kaca tempered tebal 12mm / CW1 15.00 m2
2 Mesin Automatic Sliding Door kap. 2x200 kg / CW1 1.00 unit
3 Pintu (3500x2500mm) kaca tempered tebal 12mm / CW2 8.75 m2
4 Mesin Automatic Slidding Door 2x150 kg / CW2 1.00 unit
5 Pintu 2000x2500mm kaca tempered tebal 12mm / CW3. 10.00 m2
6 Pintu 800x2500mm kaca tempered tebal 12mm / CW1, CW2. 6.00 m2
Pek. Lantai F1
Pek. Dinding
1 Bata ringan 167.78 m2
2 Kolom praktis 48.91 m'
3 Plesteran interior 168.93 m2
4 Plesteran exterior 130.08 m2
5 Acian interior 168.93 m2
6 Acian exterior 130.08 m2
7 Skim coat 280.56 m2
Pek. Lantai
1 Floor hardener 145.83 m2
2 Epoxy floor coating finish 145.83 m2
Pek Pintu & Jendela
1 Pintu PB2 (1000x2100) 1.00 unit
2 Pintu PB3 (2000x2100) 1.00 unit
3 Pintu PB4 (1090x1200) 1.00 unit
4 Pintu PB5 (600x1200) 3.00 unit
Pek. Lantai F2
Pek. Dinding
1 Bata ringan 167.65 m2
2 Kolom praktis 48.91 m'
3 Plesteran interior 168.04 m2
4 Plesteran exterior 129.33 m2
5 Acian interior 168.04 m2
6 Acian exterior 129.33 m2
Pek Pintu & Jendela
1 Pintu PB2 (1000x2100) 1.00 unit
2 Pintu PB3 (2000x2100) 1.00 unit
3 Pintu PB4 (1090x1200) 1.00 unit
4 Pintu PB5 (600x1200) 2.00 unit
Pek. Lantai F3
Pek. Dinding
1 Bata ringan 264.22 m2
2 Kolom praktis 62.78 m'
3 Plesteran interior 218.28 m2
4 Plesteran exterior 146.49 m2
5 Acian interior 218.28 m2
6 Acian exterior 146.49 m2
Pek Pintu & Jendela
2 Pintu PB2 (1000x2100) 1.00 unit
3 Pintu PB4 (1090x1200) 1.00 unit
4 Pintu PB5 (600x1200) 1.00 unit
Pek Pintu Kaca
1 Pintu 1600x2500mm kaca tempered tebal 12mm / FD1. 8.00 m2
10 dari 13
Pek. Lantai MZ
Pek. Dinding
1 Bata ringan 302.35 m2
2 Kolom praktis 107.63 m'
3 Plesteran interior 309.76 m2
4 Plesteran exterior 279.17 m2
5 Acian interior 309.76 m2
6 Acian exterior 279.17 m2
Pek Pintu & Jendela
1 Pintu PB1 (1140x2100) 1.00 unit
3 Pintu PB4 (1090x1200) 1.00 unit
4 Pintu PB5 (600x1200) 1.00 unit
C Pek. Fasad
Pek. Curtain Wall
1 Kaca tempered clear glass tebal 10mm 118.17 m2
2 Kaca tempered tebal 8mm + stiker sandblast merah dan putih 24.90 m2
3 kaca stopsol 8mm 16.32 m2
Pek. Aluminium Composite Panel (ACP)
1 Aluminium composite panel (ACP) 263.08 m2
2 Corrugated metal 107.29 m2
3 Finish hairline 24.57 m'
Pek. Pengecatan Interior & Exterior
1 Pengecatan dinding interior 4,538.99 m2
2 Pengecatan dinding exterior 1,022.02 m2
D Pek. Waterproofing
1 Waterproofing coating (ruang ME) 667.81 m2
E Pek. Paving
1 Pemadatan 2,441.26 m2
2 Urugan pasir 507.01 m3
3 Pek. Sub base perkerasan jalan 4,056.04 m2
4 Paving block hexagonal t:8mm (bagian depan) 2,842.64 m2
5 Paving block trupave t:8mm (bagian belakang) 15,693.82 m2
6 Pek. Sloping tanah 32.84 m'
7 Pek. Pemasangan Besi UNP 288.39 m'
G Pek. STP
1 Urugan pasir 62.59 m3
2 Bekisting 1.28 m2
3 Pembesian 7,208.81 kg
4 Beton K-300 26.72 m3
L Pek. Landscape
1 Pek. Rumput 923.88 m2
2 Pek. Tanaman Peneduh 15.00 btg
3 Pek. Planter Box 64.21 m'
M Pek Lain-Lain
1 U - Ditch K-250 uk. 60 x 50 cm 4.95 m'
2 U - Ditch K-250 uk. 45 x 45 cm 90.80 m'
3 Sumur Resapan Air Hujan 2.00 unit
4 Bak Control; Uk 600 mm x 500 mm 2.00 unit
5 Bak Control; Uk 400 mm x 400 mm 20.00 unit
N Pek. Tambahan
Pek. Arsitektur
1 Pek. Dinding
- Bata ringan 239.90 m3
- Balok kolom praktis 102.11 m'
- Plesteran 479.80 m2
- Acian 479.80 m2
- Floor Hardener 110.80 m2
11 dari 13
6 Pondasi Mountly Tank
- Pembesian 388.30 kg
- Bekisting 3.40 m2
- Beton 3.50 m3
7 Pek. Lain-Lain
- Pagar BRC ruang trafo 9.00 m'
- Tangga MTC ruang lift servis & Passengger 1.00 unit
- Tangga MTC utilitas GF-F1 1.00 unit
- Tangga MTC GWT /Stainless 4.00 unit
- Tangga MTC GWT/ Baja 1.00 unit
- Rumah Exhaust fan 1.00 unit
12 dari 13
NO URAIAN PEKERJAAN VOL SAT