Sei sulla pagina 1di 13

QTY/H (SEPTEMBER 2019)

VOLUME S/D TOTAL


No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019

H PEKERJAAN RANGKA BAJA & PENUTUP CANOPY


H.1 Canopy Stell
1 Strut beam canopy 633.51 633.51 kg 633.51
2 Main frame canopy @gl J 628.24 628.24 kg 628.24
3 Main frame canopy @gl A 5,684.46 5,684.46 kg 5,684.46
4 Main frame canopy @gl G1 & G8 1,116.98 1,116.98 kg 1,116.98
5 Purlin & Girt 1,150.00 1,150.00 kg 1,150.00
6 Flange brace C75 233.29 233.29 kg 233.29
7 Bridging C75 369.79 369.79 kg 369.79
8 Bracing pipe 379.25 379.25 kg 379.25
9 Bracing Roundbar 299.47 299.47 kg 299.47
10 Connection Plate 874.00 874.00 kg 874.00
11 Bolt+ Anchor Bolt 141.56 141.56 kg 141.56

H.2 Roofing Walling & Insulation


1 Metal Roofing KLIPLOK OPTIMA 0.4BMT ZA 352.94 282.35 m2 282.35
2 Flashing/Trim 0.40 BMT ZA 98.61 39.44 m2 39.44
3 Metal Gutter 0.4 BMT ZA 55.77 16.73 m2 16.73
4 Gutter Support 131.23 39.37 m2 8.90 48.27

I PEKERJAAN ARSITEKTUR
I.1 Pek. Lantai GF
I.1.1 Pek. Dinding
1 Bata ringan 1,094.58 985.12 m2 985.12
2 Kolom praktis 491.60 442.44 m' 442.44
3 Plesteran interior 1,286.82 1,158.14 m2 1,158.14
4 Plesteran exterior 769.84 692.85 m2 692.85
5 Acian interior 1,286.82 1,158.14 m2 1,158.14
6 Acian exterior 769.84 692.85 m2 692.85
7 Skim coat 623.25 560.93 m2 560.93
I.1.2 Pek. Lantai
1 Lantai keramik 444.12 m2 -
2 Floor hardener 119.29 m2 -
3 Dinding Keramik 119.29 m2 -
I.1.3 Pek Pintu & Jendela
1 Pintu P1 (800x1200) 2.00 unit -
2 Pintu PB6 (1000x2100) 1.00 unit -
3 Pintu PB1a (1100x2100) 4.00 4.00 unit 4.00
4 Pintu PB3 (2000x2100) 1.00 unit -
5 Pintu PB2 (1000x2100) 6.00 unit -
6 Pintu PB4 (1090x1200) 1.00 unit -
7 Pintu PB5 (600x1200) 3.00 unit -
8 Jendela J1 (970x2100) 2.00 unit -
I.1.4 Pek. Pintu Kaca
1 Pintu (2500x6000mm) kaca tempered tebal 12mm / CW1 15.00 m2 -
2 Mesin Automatic Sliding Door kap. 2x200 kg / CW1 1.00 unit -
3 Pintu (3500x2500mm) kaca tempered tebal 12mm / CW2 8.75 m2 -
4 Mesin Automatic Slidding Door 2x150 kg / CW2 1.00 unit -
5 Pintu 2000x2500mm kaca tempered tebal 12mm / CW3. 10.00 m2 -
6 Pintu 800x2500mm kaca tempered tebal 12mm / CW1, CW2. 6.00 m2 -

I.2 Pek. Lantai F1


I.2.1 Pek. Dinding
1 Bata ringan 1,677.84 1,510.06 m2 1,510.06
2 Kolom praktis 489.10 440.19 m' 440.19
3 Plesteran interior 1,689.26 1,520.34 m2 1,520.34
4 Plesteran exterior 1,300.76 1,170.69 m2 1,170.69
5 Acian interior 1,689.26 1,520.34 m2 1,520.34
6 Acian exterior 1,300.76 1,170.69 m2 1,170.69
7 Skim coat 2,678.02 2,397.46 m2 2,397.46
I.2.2 Pek. Lantai
1 Floor hardener 145.83 m2 -
2 Epoxy floor coating finish 145.83 m2 -
I.2.3 Pek Pintu & Jendela
1 Pintu PB1 (1140x2100) 4.00 4.00 unit 4.00
2 Pintu PB2 (1000x2100) 2.00 1.00 unit 1.00
3 Pintu PB3 (2000x2100) 1.00 unit -
4 Pintu PB4 (1090x1200) 1.00 unit -
5 Pintu PB5 (600x1200) 3.00 unit -

I.3 Pek. Lantai F2


I.3.1 Pek. Dinding
1 Bata ringan 1,676.53 1,508.88 m2 1,508.88
2 Kolom praktis 489.10 440.19 m' 440.19
3 Plesteran interior 1,680.45 1,512.40 m2 1,512.40
4 Plesteran exterior 1,293.26 1,163.93 m2 1,163.93
5 Acian interior 1,680.45 1,512.40 m2 1,512.40
6 Acian exterior 1,293.26 1,163.93 m2 1,163.93
7 Skim coat 305.34 274.80 m2 274.80
I.3.2 Pek Pintu & Jendela
1 Pintu PB1 (1140x2100) 4.00 4.00 unit 4.00
2 Pintu PB2 (1000x2100) 1.00 unit -
3 Pintu PB3 (2000x2100) 1.00 unit -
4 Pintu PB4 (1090x1200) 1.00 unit -
5 Pintu PB5 (600x1200) 2.00 unit -

I.4 Pek. Lantai F3


I.4.1 Pek. Dinding
1 Bata ringan 2,642.16 2,377.94 m2 2,377.94
2 Kolom praktis 627.75 564.98 m' 564.98
3 Plesteran interior 2,182.78 1,964.50 m2 1,964.50
4 Plesteran exterior 1,464.95 1,318.45 m2 1,318.45
5 Acian interior 2,182.78 1,964.50 m2 1,964.50
6 Acian exterior 1,464.95 1,318.45 m2 1,318.45
7 Skim coat 323.23 290.91 m2 290.91
I.4.2 Pek. Lantai
1 Screed ± 3,5 cm 3,835.37 3,835.37 m2 3,835.37
I.4.3 Pek Pintu & Jendela
1 Pintu PB1 (1140x2100) 4.00 4.00 unit 4.00

1 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019

2 Pintu PB2 (1000x2100) 1.00 unit -


3 Pintu PB4 (1090x1200) 1.00 unit -
4 Pintu PB5 (600x1200) 1.00 unit -
I.4.4 Pek Pintu Kaca
1 Pintu 1600x2500mm kaca tempered tebal 12mm / FD1. 8.00 m2 -

2 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019

I.5 Pek. Lantai MZ


I.5.1 Pek. Dinding
1 Bata ringan 3,023.54 2,721.19 m2 2,721.19
2 Kolom praktis 1,076.33 968.70 m' 968.70
3 Plesteran interior 3,097.58 2,787.83 m2 2,787.83
4 Plesteran exterior 2,791.73 2,512.56 m2 2,512.56
5 Acian interior 3,097.58 2,787.83 m2 2,787.83
6 Acian exterior 2,791.73 2,512.56 m2 2,512.56
7 Skim coat 409.96 368.96 m2 368.96
I.5.2 Pek Pintu & Jendela
1 Pintu PB1 (1140x2100) 2.00 1.00 unit 1.00
2 Pintu PB2 (1000x2100) 1.00 1.00 unit 1.00
3 Pintu PB4 (1090x1200) 1.00 unit -
4 Pintu PB5 (600x1200) 1.00 unit -

I.6 Pek. Fasad


I.6.1 Pek. Curtain Wall
1 Kaca tempered clear glass tebal 10mm 590.85 472.68 m2 472.68
2 Kaca tempered tebal 8mm + stiker sandblast merah dan putih 749.64 674.68 m2 674.68
3 kaca stopsol 8mm 163.20 146.88 m2 146.88
I.6.2 Pek. Aluminium Composite Panel (ACP)
1 Aluminium composite panel (ACP) 1,753.89 1,490.81 m2 1,490.81
2 Corrugated metal 877.98 570.69 m2 570.69
3 Finish hairline 24.57 m'
I.6.3 Pek. Pengecatan Interior & Exterior
1 Pengecatan dinding interior 11,347.46 6,808.48 m2 6,808.48
2 Pengecatan dinding exterior 6,813.47 5,791.45 m2 5,791.45

I.7 Pek. Waterproofing


1 Waterproofing coating (ruang ME) 667.81 m2 -

I.8 Pek. Lain - Lain


1 Railling 552.60 552.60 m' 552.60

K. PEKERJAAN LUAR BANGUNAN


K.1 Pek. Parkir Loading Dock
1 Lantai kerja 16.98 16.98 m3 16.98
2 Beton K-300 51.06 51.06 m3 51.06
3 Wiremesh M8 510.60 510.60 m2 510.60

K.2 Pek. Paving


1 Pemadatan 12,206.30 9,765.04 m2 9,765.04
2 Urugan pasir 2,028.02 1,521.02 m3 1,521.02
3 Pek. Sub base perkerasan jalan 20,280.21 16,224.17 m2 16,224.17
4 Paving block hexagonal t:8mm (bagian depan) 2,842.64 m2 -
5 Paving block trupave t:8mm (bagian belakang) 17,437.58 1,743.76 m2 1,743.76
6 Pek. Sloping tanah 328.45 295.60 m' 295.60
7 Pek. Pemasangan Besi UNP 288.39 m' -

K.3 Pek. GWT &R. Pompa


1 Urugan pasir 21.43 21.43 m3 21.43
2 Lantai kerja 10.72 10.72 m3 10.72
3 Bekisting 779.88 779.88 m2 779.88
4 Pembesian 44,546.26 44,546.26 kg 44,546.26
5 Beton K-300 221.13 221.13 m3 221.13
6 Coating Dalam 404.80 161.92 m2 161.92
7 Waterstop 87.40 87.40 m' 87.40
8 Waterprofing integral 221.13 221.13 m3 221.13

K.4 Pek. STP


1 Urugan pasir 89.42 26.82 m3 26.82
2 Bekisting 3.20 1.92 m2 1.92
3 Pembesian 18,022.03 10,813.22 kg 10,813.22
4 Beton K-300 66.80 40.08 m3 40.08

K.5 Pek. Grease Trap


1 Urugan pasir 1.58 m3 -
2 Lantai kerja 0.79 m3 -
3 Bekisting 132.53 m2 -
4 Pembesian 2,857.10 kg -
5 Beton K-300 13.90 m3 -
6 Coating Dalam 183.75 m2 -

K.6 Pek. Sewage Pit


1 Urugan pasir 0.76 m3 -
2 Lantai kerja 0.38 m3 -
3 Bekisting 33.04 m2 -
4 Pembesian 913.67 kg -
5 Beton K-300 5.50 m3 -

K.7 Pek. Kanstin & Car Stoper


1 Beton Kanstin uk. 40 x 15/30 1,873.97 1,218.08 m' 1,218.08
2 Car stopper K-225 568.00 bh -

K.8 Pekerjaan Eksternal Access Road


1 Cat garis parkir lebar 100mm 7,158.55 m' -

K.9 Pekerjaan Perimeter Fence


1 Pagar BRC 405.96 405.96 m' 405.96

K.10 Pek. Landscape


1 Pek. Rumput 923.88 m2 -
2 Pek. Tanaman Peneduh 15.00 btg -
3 Pek. Planter Box 64.21 m' -

K.11 Pek Lain-Lain


1 U - Ditch K-250 uk. 60 x 50 cm 49.54 44.59 m' 44.59
2 U - Ditch K-250 uk. 45 x 45 cm 302.65 211.86 m' 211.86
3 Sumur Resapan Air Hujan 2.00 unit -
4 Bak Control; Uk 600 mm x 500 mm 2.00 unit -

3 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019

5 Bak Control; Uk 400 mm x 400 mm 20.00 unit -

L. Pek. Tambahan
L.1 Pek. Penambahan Struktur + ACP Red Box
- Struktur ACP Redbox 14,602.00 14,602.00 kg 14,602.00
- ACP Red Box 633.50 633.50 m2 633.50

4 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019

L.2 Pekerjaan Buangan Galian Tanah


Buangan Tanah Hasil Galian ke Lokasi yang ditentukan oleh KIEC 20,088.62 20,088.62 m3 20,088.62

L.3 Pekerjaan Tambah Luasan Lahan


- Penambahan Terasering sisi gedung dan area parkir 969.00 969.00 m2 969.00

L.4 Pekerjaan Tambah Luasan Gedung


Pek. Galian Tanah
- Galian Pile Cap 42.74 42.74 m3 42.74
- Galian Tie Beam 18.02 18.02 m3 18.02

L.5 Pek. Urugan Tanah Kembali


- Urugan Pile Cap 8.55 8.55 m3 8.55
- Urugan Tie Beam 3.60 3.60 m3 3.60

L.6 Pek. Struktur Bawah


a Pek Urugan Pasir & Lantai Kerja
- Urugan Pasir 10 cm 5.55 5.55 m3 5.55
- Lantai kerja 5 cm 2.83 2.83 m3 2.83
b Pek. Pondasi
Bored pile D800 mm 72.00 72.00 m' 72.00
- Pembesian 3,836.00 3,836.00 kg 3,836.00
- Beton K-300 30.14 30.14 m3 30.14
- Pembobokan kepala bore pile D800 mm 12.00 12.00 titik 12.00
- Bentonite t=20 cm 2.41 2.41 m3 2.41
c Pek Pile Cap & Tie Beam
Pek pile cap PC 2 Uk (3600x1600x900mm)
- Bekisting 56.16 56.16 m2 56.16
- Pembesian 2,695.08 2,695.08 kg 2,695.08
- Beton K-400 31.10 31.10 m3 31.10
d Pek Tie Beam Uk (350x650)mm
- Bekisting 83.66 83.66 m2 83.66
- Pembesian 4,337.92 4,337.92 kg 4,337.92
- Beton K-400 10.14 10.14 m3 10.14
Pek. Struktur Atas
Pek .Lantai GF
- Pembesian 3,889.37 3,889.37 kg 3,889.37
- Beton K-400 17.88 17.88 m3 17.88
Pek .Kolom GF
- Bekisting 84.00 84.00 m2 84.00
- Pembesian 4,941.19 4,941.19 kg 4,941.19
- Beton K-300 14.70 14.70 m3 14.70
Pek .Balok Atap
- Bekisting 64.08 64.08 m2 64.08
- Pembesian 3,856.24 3,856.24 kg 3,856.24
- Beton K-300 64.08 64.08 m3 64.08
Pek .Plat Atap
- Bekisting 137.55 137.55 m2 137.55
- Pembesian 6,262.45 6,262.45 kg 6,262.45
- Beton K-300 27.51 27.51 m3 27.51

L.7 Pek. Arsitektur


Pek. Dinding
- Bata ringan 239.90 m3 -
- Balok kolom praktis 102.11 m' -
- Plesteran 479.80 m2 -
- Acian 479.80 m2 -
- Floor Hardener 110.80 m2 -

L.8 Pek. Pintu GWT, Mesin Lift


- Pintu PB2 (1000x2100) 2.00 unit -
- Pintu PB2a (1000x1900) 2.00 unit -

L.9 Pek. Pengecatan Interior & Exterior


- Pengecatan dinding exterior 222.28 m2 -
- Pengecatan dinding Interior 226.00 m2 -
- Pengecatan dak Interior 98.00 m2 -

L.10 Pek. Pembobokan


- Pembobokan plat beton bertulang area tangga utilitas 5.16 5.16 m2 5.16
- Pembobokan pasangan dinding ruang chiller L.GF 107.63 107.63 m2 107.63
- Pembobokan dinding F2/PB3 3.38 3.38 m2 3.38

L.11 Pek. Penambahan ruang tangga GF-F1


- Pembesian 3,217.82 3,217.82 kg 3,217.82
- Bekisting 23.87 23.87 m2 23.87
- Beton 8.50 8.50 m3 8.50
- Pasangan Dinding 65.75 m2 -
- Plesteran 133.60 m2 -
- Acian 133.60 m2 -
- Pengecatan dinding interior 65.75 m2 -
- Pengecatan dinding exterior 65.75 m2 -
- Pengecatan dak 8.80 m2 -
- Waterprofing dak 10.35 m2 -

L.12 Pek. Pondasi MEP


a Pondasi Genset
- Pembesian 831.40 831.40 kg 831.40
- Bekisting 6.84 6.84 m2 6.84
- Beton 6.60 6.60 m3 6.60
b Pondasi Trafo
- Pembesian 269.04 269.04 kg 269.04
- Bekisting 3.59 3.59 m2 3.59
- Beton 1.95 1.95 m3 1.95
c Pondasi Chiller
- Pembesian 68.26 68.26 kg 68.26
- Bekisting 6.34 6.34 m2 6.34
- Beton 3.79 3.79 m3 3.79
d Pondasi Panel
- Pembesian 371.78 371.78 kg 371.78

5 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019

- Bekisting 3.59 3.59 m2 3.59


- Beton 1.95 1.95 m3 1.95
e Pondasi Make UP Water Tank
- Pembesian 85.68 kg -
- Bekisting 3.43 m2 -
- Beton 0.30 m3 -

6 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019

f Pondasi Mountly Tank


- Pembesian 388.30 kg -
- Bekisting 3.40 m2 -
- Beton 3.50 m3 -
g Pek. Lain-Lain
- Pagar BRC ruang trafo 9.00 m' -
- Tangga MTC ruang lift servis & Passengger 1.00 unit -
- Tangga MTC utilitas GF-F1 1.00 unit -
- Tangga MTC utilitas F1-F2 1.00 1.00 unit 1.00
- Tangga MTC GWT /Stainless 4.00 unit -
- Tangga MTC GWT/ Baja 1.00 unit -
- Rumah Exhaust fan 1.00 unit -

L.13 Pek. Pit Travelator & Kolom Intermediate Support


a Pit Travelator Awal
- Lantai Kerja 5 cm 25.10 25.10 m2 25.10
- Pasir Urug 10 cm 2.51 2.51 m3 2.51
b Pit Travelator Baru
- Galian Pondasi Pit Lift (Galian Manual) 56.74 56.74 m3 56.74
- Buangan Tanah Galian 56.74 56.74 m3 56.74
- Pengecoran K-300 35.57 35.57 m3 35.57
- Pembesian 11,453.07 11,453.07 kg 11,453.07
- Pekerjaan Bekisting 116.94 116.94 m2 116.94
- Lantai Kerja 5 cm 34.74 34.74 m2 34.74
- Pasir Urug 10 cm 3.47 3.47 m3 3.47
- Waterproofing Integral Area Pit Travelator 35.57 35.57 m3 35.57
- Waterstop 5.20 5.20 m' 5.20
c Pekerjaan Kolom Intermediate Support
- King Cross (500.200.10.16) Kolom 2,664.70 2,664.70 kg 2,664.70
- King Cross (400.200.8.13) Kolom 6,750.80 6,750.80 kg 6,750.80
- WF (450.200.9.14) Balok 972.80 972.80 kg 972.80
- Base Plate 30 mm THK 12.43 12.43 kg 12.43
- Base Plate 19 mm THK 19.57 19.57 kg 19.57
- Base Plate 10 mm THK 0.40 0.40 kg 0.40
- ACP 47.58 m2 -
d Pembobokan
- Pile Cap Beton Bertulang 2.69 2.69 m3 2.69
- Balok Beton Bertulang 7.89 7.89 m3 7.89
e Finish Travelator
- Cladding 4.00 3.00 Unit 3.00

L.14 Pek. Bobok Lantai F2 dan Perubahan Posisi Eskalator F2-F3


a Pembobokan
- Plat Lantai Beton Bertulang 37.96 37.96 m3 37.96
- Balok Beton Bertulang 9.17 9.17 m3 9.17
b Pekerjaan Balok Beton
- Pengecoran K-300 51.64 51.64 m3 51.64
- Pembesian 12,921.42 12,921.42 kg 12,921.42
- Pekerjaan Bekisting 309.72 309.72 m2 309.72
- Plat Dudukan Eskalator t = 2cm 0.32 0.32 m2 0.32
c Finish Travelator
- Cladding 2.00 1.00 Unit 1.00

L.15 Pek. Arsitektur Seating Out Door


- Curtain wall 10 mm 203.49 m2 -
- Pintu kaca (1600x2500)mm 3 unit Outdoor Seating 12.00 m2 -
- ACP Kolom 79.17 m2 -
- ACP Plafonf seating Out Door 158.65 m2 -
- Pintu Kaca (1600x2500) mm 3 unit tambahan depan 12.00 m2 -
Pekerjaan Kurang
- Dinding hebel (188.14) (188.14) m2 (188.14)
- Plesteran (376.28) (376.28) m2 (376.28)
- Acian (376.28) (376.28) m2 (376.28)
- Pengecatan Exterior (188.14) (188.14) m2 (188.14)

L.16 Pek. Tambahan Luasan Parkir & Landskape


a Pek. Pematangan Lahan
- Timbunan tanah kembali 1,181.00 m3 -
- Timbunan (Urugan dari luar) 1,181.00 m3 -
- Pemadatan 1,566.32 m2 -
- Galian Pondasi Turap 86.50 m3 -
- Turap 467.10 m3 -
- Pagar BRC 212.00 m' -
b Pek. Parkiran
- Lapisan Pondasi Bawah Paving (LPB) 1,566.32 m2 -
- Pasir Urug t : 5cm 1,566.32 m2 -
- Paving 1,566.32 m2 -
- Kanstin 31.00 m' -
- kanstin gurter 112.00 m' -
c Pek. Saluran
- Grill 30.00 m' -
d Pek. Tanaman
- Tanaman rindang (± 2m) 40.00 btg -
e Pek. Akses masuk (Jembatan)
- Pembesian 534.07 kg -
- Bekisting 9.38 m2 -
- Beton 1.82 m3 -
f Pek.Elektrikal
- Pondasi 30x30 3.00 3.00 unit 3.00
- Angkur angkur L 19mm x 70cm 12.00 12.00 btg 12.00
- Tiang Lampu 3.00 3.00 titik 3.00
- Lampu (Prevaled SKY 4x100 W) 4.00 4.00 unit 4.00
- Kabel 200.00 200.00 m' 200.00

L.17 Pek. Finishing Lantai


a Finishing Lantai (Epoxy)
- R. Panel & Travo 209.13 m2 -
- R. Pompa GWT 69.30 m2 -
b Finishing Lantai (Floor Hardener)
Lantai GF

7 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019

- Bekisting 27.14 27.14 m' 27.14


- Pembesian 1,499.73 1,499.73 kg 1,499.73
- Beton K-300 t = 7.5 cm 13.58 13.58 m3 13.58
- Floor Hardener 7 kg/m2 27.14 27.14 m2 27.14
Lantai F1

8 dari 13
QTY/H (SEPTEMBER 2019)
VOLUME S/D TOTAL
No. URAIAN PEKERJAAN VOLUME SAT
9/3/2019 VOLUME
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019

- Bekisting 23.70 23.70 m' 23.70


- Pembesian 355.32 355.32 kg 355.32
- Beton K-300 t = 7.5 cm 6.37 6.37 m3 6.37
- Floor Hardener 7 kg/m2 50.66 50.66 m2 50.66
Lantai F2
- Bekisting 62.14 62.14 m' 62.14
- Pembesian 1,081.78 1,081.78 kg 1,081.78
- Beton K-300 t = 7.5 cm 9.72 9.72 m3 9.72
- Floor Hardener 7 kg/m2 129.63 129.63 m2 129.63
c Pek. Pintu Gerbang
- Panjang 10 m 1.00 unit -
- Panjang 10 m 1.00 unit -
- Panjang 7 1.00 unit -
d Pek. Finishing Ruang Tangga Darurat
- Pengecatan Dinding 1,846.94 m2 -
- Pengecatan Belakang Tangga & Plat Belakang Bordes 584.32 m2 -
- Screed Anak Tangga & Bordes 522.55 m2 -
- Screed R.Tangga lantai GF-MZ 492.74 m2 -
Expose Beton/Skim Coat Tangga Darurat
- Plat Tangga Darurat 584.32 354.22 m2 354.22
- Anak Tangga (Samping & Optrade) 112.90 91.73 m2 91.73
- Balok & Kolom Tangga Darurat 1,818.30 m2 -
e Pekerjaan Adjusting Openingan Lift
- Openingan Lift 6.00 6.00 unit 6.00

9 dari 13
QTY/H (SEPTEMBER 2019)
No. URAIAN PEKERJAAN SISA VOLUME SAT
9/4/2019 9/5/2019 9/6/2019 9/7/2019 9/8/2019 9/9/2019 9/10/2019 9/11/2019 9/12/2019 9/13/2019 9/14/2019 9/15/2019 9/16/2019 9/17/2019 9/18/2019 9/19/2019 9/20/2019 9/21/2019 9/22/2019 9/23/2019 9/24/2019 9/25/2019 9/26/2019 9/27/2019 9/28/2019 9/29/2019 9/30/2019 KALKULASI

A PEKERJAAN RANGKA BAJA & PENUTUP CANOPY


Canopy Stell
Roofing Walling & Insulation
1 Metal Roofing KLIPLOK OPTIMA 0.4BMT ZA 70.59 m2
2 Flashing/Trim 0.40 BMT ZA 59.17 m2
3 Metal Gutter 0.4 BMT ZA 39.04 m2
4 Gutter Support 91.86 m2

B PEKERJAAN ARSITEKTUR
Pek. Lantai GF
Pek. Dinding
1 Bata ringan 109.46 m2
2 Kolom praktis 49.16 m'
3 Plesteran interior 128.68 m2
4 Plesteran exterior 76.98 m2
5 Acian interior 128.68 m2
6 Acian exterior 76.98 m2
Pek. Lantai
1 Lantai keramik 444.12 m2
2 Floor hardener 119.29 m2
3 Dinding Keramik 119.29 m2
Pek Pintu & Jendela
1 Pintu P1 (800x1200) 2.00 unit
2 Pintu PB6 (1000x2100) 1.00 unit
4 Pintu PB3 (2000x2100) 1.00 unit
5 Pintu PB2 (1000x2100) 6.00 unit
6 Pintu PB4 (1090x1200) 1.00 unit
7 Pintu PB5 (600x1200) 3.00 unit
8 Jendela J1 (970x2100) 2.00 unit
Pek. Pintu Kaca
1 Pintu (2500x6000mm) kaca tempered tebal 12mm / CW1 15.00 m2
2 Mesin Automatic Sliding Door kap. 2x200 kg / CW1 1.00 unit
3 Pintu (3500x2500mm) kaca tempered tebal 12mm / CW2 8.75 m2
4 Mesin Automatic Slidding Door 2x150 kg / CW2 1.00 unit
5 Pintu 2000x2500mm kaca tempered tebal 12mm / CW3. 10.00 m2
6 Pintu 800x2500mm kaca tempered tebal 12mm / CW1, CW2. 6.00 m2

Pek. Lantai F1
Pek. Dinding
1 Bata ringan 167.78 m2
2 Kolom praktis 48.91 m'
3 Plesteran interior 168.93 m2
4 Plesteran exterior 130.08 m2
5 Acian interior 168.93 m2
6 Acian exterior 130.08 m2
7 Skim coat 280.56 m2
Pek. Lantai
1 Floor hardener 145.83 m2
2 Epoxy floor coating finish 145.83 m2
Pek Pintu & Jendela
1 Pintu PB2 (1000x2100) 1.00 unit
2 Pintu PB3 (2000x2100) 1.00 unit
3 Pintu PB4 (1090x1200) 1.00 unit
4 Pintu PB5 (600x1200) 3.00 unit

Pek. Lantai F2
Pek. Dinding
1 Bata ringan 167.65 m2
2 Kolom praktis 48.91 m'
3 Plesteran interior 168.04 m2
4 Plesteran exterior 129.33 m2
5 Acian interior 168.04 m2
6 Acian exterior 129.33 m2
Pek Pintu & Jendela
1 Pintu PB2 (1000x2100) 1.00 unit
2 Pintu PB3 (2000x2100) 1.00 unit
3 Pintu PB4 (1090x1200) 1.00 unit
4 Pintu PB5 (600x1200) 2.00 unit

Pek. Lantai F3
Pek. Dinding
1 Bata ringan 264.22 m2
2 Kolom praktis 62.78 m'
3 Plesteran interior 218.28 m2
4 Plesteran exterior 146.49 m2
5 Acian interior 218.28 m2
6 Acian exterior 146.49 m2
Pek Pintu & Jendela
2 Pintu PB2 (1000x2100) 1.00 unit
3 Pintu PB4 (1090x1200) 1.00 unit
4 Pintu PB5 (600x1200) 1.00 unit
Pek Pintu Kaca
1 Pintu 1600x2500mm kaca tempered tebal 12mm / FD1. 8.00 m2

10 dari 13
Pek. Lantai MZ
Pek. Dinding
1 Bata ringan 302.35 m2
2 Kolom praktis 107.63 m'
3 Plesteran interior 309.76 m2
4 Plesteran exterior 279.17 m2
5 Acian interior 309.76 m2
6 Acian exterior 279.17 m2
Pek Pintu & Jendela
1 Pintu PB1 (1140x2100) 1.00 unit
3 Pintu PB4 (1090x1200) 1.00 unit
4 Pintu PB5 (600x1200) 1.00 unit

C Pek. Fasad
Pek. Curtain Wall
1 Kaca tempered clear glass tebal 10mm 118.17 m2
2 Kaca tempered tebal 8mm + stiker sandblast merah dan putih 24.90 m2
3 kaca stopsol 8mm 16.32 m2
Pek. Aluminium Composite Panel (ACP)
1 Aluminium composite panel (ACP) 263.08 m2
2 Corrugated metal 107.29 m2
3 Finish hairline 24.57 m'
Pek. Pengecatan Interior & Exterior
1 Pengecatan dinding interior 4,538.99 m2
2 Pengecatan dinding exterior 1,022.02 m2

D Pek. Waterproofing
1 Waterproofing coating (ruang ME) 667.81 m2

E Pek. Paving
1 Pemadatan 2,441.26 m2
2 Urugan pasir 507.01 m3
3 Pek. Sub base perkerasan jalan 4,056.04 m2
4 Paving block hexagonal t:8mm (bagian depan) 2,842.64 m2
5 Paving block trupave t:8mm (bagian belakang) 15,693.82 m2
6 Pek. Sloping tanah 32.84 m'
7 Pek. Pemasangan Besi UNP 288.39 m'

F Pek. GWT &R. Pompa


6 Coating Dalam 242.88 m2

G Pek. STP
1 Urugan pasir 62.59 m3
2 Bekisting 1.28 m2
3 Pembesian 7,208.81 kg
4 Beton K-300 26.72 m3

H Pek. Grease Trap


1 Urugan pasir 1.58 m3
2 Lantai kerja 0.79 m3
3 Bekisting 132.53 m2
4 Pembesian 2,857.10 kg
5 Beton K-300 13.90 m3
6 Coating Dalam 183.75 m2

I Pek. Sewage Pit


1 Urugan pasir 0.76 m3
2 Lantai kerja 0.38 m3
3 Bekisting 33.04 m2
4 Pembesian 913.67 kg
5 Beton K-300 5.50 m3

J Pek. Kanstin & Car Stoper


1 Beton Kanstin uk. 40 x 15/30 655.89 m'
2 Car stopper K-225 568.00 bh

K Pekerjaan Eksternal Access Road


1 Cat garis parkir lebar 100mm 7,158.55 m'

L Pek. Landscape
1 Pek. Rumput 923.88 m2
2 Pek. Tanaman Peneduh 15.00 btg
3 Pek. Planter Box 64.21 m'

M Pek Lain-Lain
1 U - Ditch K-250 uk. 60 x 50 cm 4.95 m'
2 U - Ditch K-250 uk. 45 x 45 cm 90.80 m'
3 Sumur Resapan Air Hujan 2.00 unit
4 Bak Control; Uk 600 mm x 500 mm 2.00 unit
5 Bak Control; Uk 400 mm x 400 mm 20.00 unit

N Pek. Tambahan
Pek. Arsitektur
1 Pek. Dinding
- Bata ringan 239.90 m3
- Balok kolom praktis 102.11 m'
- Plesteran 479.80 m2
- Acian 479.80 m2
- Floor Hardener 110.80 m2

2 Pek. Pintu GWT, Mesin Lift


- Pintu PB2 (1000x2100) 2.00 unit
- Pintu PB2a (1000x1900) 2.00 unit

3 Pek. Pengecatan Interior & Exterior


- Pengecatan dinding exterior 222.28 m2
- Pengecatan dinding Interior 226.00 m2
- Pengecatan dak Interior 98.00 m2

4 Pek. Penambahan ruang tangga GF-F1


- Pembesian 804.46 kg
- Bekisting 5.97 m2
- Beton 2.13 m3
- Pasangan Dinding 65.75 m2
- Plesteran 133.60 m2
- Acian 133.60 m2
- Pengecatan dinding interior 65.75 m2
- Pengecatan dinding exterior 65.75 m2
- Pengecatan dak 8.80 m2
- Waterprofing dak 10.35 m2

5 Pondasi Make UP Water Tank


- Pembesian 85.68 kg
- Bekisting 3.43 m2
- Beton 0.30 m3

11 dari 13
6 Pondasi Mountly Tank
- Pembesian 388.30 kg
- Bekisting 3.40 m2
- Beton 3.50 m3
7 Pek. Lain-Lain
- Pagar BRC ruang trafo 9.00 m'
- Tangga MTC ruang lift servis & Passengger 1.00 unit
- Tangga MTC utilitas GF-F1 1.00 unit
- Tangga MTC GWT /Stainless 4.00 unit
- Tangga MTC GWT/ Baja 1.00 unit
- Rumah Exhaust fan 1.00 unit

O Pek. Pit Travelator & Kolom Intermediate Support


1 Pekerjaan Kolom Intermediate Support
- ACP 47.58 m2
2 Finish Travelator
- Cladding 1.00 Unit

3 Pek. Arsitektur Seating Out Door


- Curtain wall 10 mm 203.49 m2
- Pintu kaca (1600x2500)mm 3 unit Outdoor Seating 12.00 m2
- ACP Kolom 79.17 m2
- ACP Plafonf seating Out Door 158.65 m2
- Pintu Kaca (1600x2500) mm 3 unit tambahan depan 12.00 m2

4 Pek. Tambahan Luasan Parkir & Landskape


a Pek. Pematangan Lahan
- Timbunan tanah kembali 85.00 m3
- Timbunan (Urugan dari luar) 185.64 m3
- Pemadatan 313.26 m2
- Pagar BRC 42.40 m'
b Pek. Parkiran
- Lapisan Pondasi Bawah Paving (LPB) 703.70 m2
- Pasir Urug t : 5cm 1,253.06 m2
- Paving 1,566.32 m2
- Kanstin 31.00 m'
- kanstin gurter 112.00 m'
e Pek. Akses masuk (Jembatan)
- Pembesian 534.07 kg
- Bekisting 9.38 m2
- Beton 1.82 m3

5 Pek. Finishing Lantai


a Finishing Lantai (Epoxy)
- R. Panel & Travo 209.13 m2
- R. Pompa GWT 69.30 m2
c Pek. Pintu Gerbang
- Panjang 10 m 1.00 unit
- Panjang 10 m 1.00 unit
- Panjang 7 1.00 unit
d Pek. Finishing Ruang Tangga Darurat
- Pengecatan Dinding 1,846.94 m2
- Pengecatan Belakang Tangga & Plat Belakang Bordes 584.32 m2
- Screed Anak Tangga & Bordes 104.00 m2
- Screed R.Tangga lantai GF-MZ 492.74 m2
Expose Beton/Skim Coat Tangga Darurat
- Plat Tangga Darurat 230.10 m2
- Anak Tangga (Samping & Optrade) 21.17 m2
- Balok & Kolom Tangga Darurat 1,818.30 m2

12 dari 13
NO URAIAN PEKERJAAN VOL SAT

A Pek. Finishing Ruang Tangga Darurat


- Pengecatan Dinding 1,846.94 m2
- Pengecatan Belakang Tangga & Plat Belakang Bordes 584.32 m2
- Screed Anak Tangga & Bordes 522.55 m2
- Screed R.Tangga lantai GF-MZ 492.74 m2
Expose Beton/Skim Coat Tangga Darurat
- Plat Tangga Darurat 584.32 m2
- Anak Tangga (Samping & Optrade) 112.90 m2
- Balok & Kolom Tangga Darurat 1,818.30 m2
B Pekerjaan Adjusting Openingan Lift
- Openingan Lift 6.00 unit