Sei sulla pagina 1di 6

UKURAN KUBUS (m) 0.15 0.15 0.

15
JUMLAH SAMPEL 5

SNI SEMEN 326 kg


PASIR 760 kg
KERIKIL 1029 kg
AIR 215 kg

JO
K-

MUTU
No. TANGGAL KODE JUMLAH SAMPEL
BETON

1 Sunday, January 08, 2017 175 SNI TRIAL 1 5

2 Monday, January 09, 2017 225 SNI TRIAL 2 5

3 Tuesday, January 10, 2017 225 SNI TRIAL 3 5


+ semen 10%

4 Wednesday, January 11, 2017 225 SNI TRIAL 4 5


+ splite 10%

7
0.003375 m³
0.016875 m³

5.50125 kg 6.3 kg
12.825 kg 14.7 kg
17.364375 kg 20.0 kg
3.628125 liter 4.2 liter

JOB MIX PLAN


K - 175 & K - 225

7 14
SEMEN PASIR SPLITE AIR (0,65) (0,88)
(kg) (kg) (kg) (lt) KUAT TEKAN KUAT TEKAN
6.3 14.7 20.0 4.2 ### ###
40.00 27.35

7.2 13.5 20.3 4.2 ### ###


175.00 119.7

7.92 13.5 20.3 4.2 ### ###


92.00 62.9

7.2 13.5 22.3 4.2 ### ###


35.00 23.9
21 28
(0,95) (1,00)
KUAT TEKAN KUAT TEKAN RASIO
### ### 3 0.40
7 0.65
14 0.88
### ### 21 0.95
28 1

### ###

### ###

Potrebbero piacerti anche