Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
A Dissertation Submitted to
Sponsored By
Campari Exports Pvt. Ltd
(A Govt.Recognised Star Export House)
Submitted by :
Anjali
MBA–II
TABLE OF CONTENTS
INTRODUCTI......................................................................................... 3
TEAM CAMPARI ............................................................................................................................. ........... 4
FACTORIES...............................................................................................................................................................5
TITLE PAGE ............................................................................................................... 6
ACKHOWLADGEMENT ............................................................................................................................................... 7
DEDICATION ......................................................................................................................................... 8
INTERNSHIP CERTIFICATE
................................................................................................................................................ 9
EVALUTION FORM ............................................................................................................................. .................... 11
EXECUTIVE SUMMARY ................................................................................................................................ 19
1. OBJECTIVE
2. DATA COLLECTION METHOD
COMPANY PROFILE ..................................................................................................................... 20
SAMPLING DEPARTMENT .................................................................................................................. ............... 28
FABRIC SOURCING DEPARTMENT .................................................................................................................. 30
FABRIC STORE ....................................................................................................................................................... 31
FABRIC INPECTION .............................................................................................................................................. 34
TRIMS STORE ......................................................................................................................................................... 36
CAD DEPARTMENT ............................................................................................................................................... 38
SPREADING DEPARTMENT ........................................................................................................ ........................ 43
SEWING DEPARTMENT ....................................................................................................................................... 49
WASHING DEPARTMENT .......................................................................................................... .......................... 51
FINISHING DEPARTMENT ........................................................................................................ ........................... 52
PACKAGING DEPARTMENT ............................................................................................................................... 53
REFERANCE ................................................................................................................... ......................................... 57
INTRODUCTION
in its people.
performance.
people.
fashionable product.
FACTORIES
Campari operates out of 4 factories located in
the Delhi-NCR region, with a total working area
of 2,25,000 square feet.
TITLE PAGE:
Anjali
DEDICATION
I dedicate my dissertation work to my family and many friends. A
ears.
daughter Erica Nain for being there for me throughout the entire
OBJECTIVE
Objective of the study is to learn about the functioning of export
house and working of various departments particularly HR &
Admin , Department, earning knowledge about different
departments of the company, their function and information flow
during work.
Address
Campari Exports Pvt. Ltd
14/9,Gurkul Industrieal Area ,Sarai Khawja, Faridabad. Haryana PIN CODE: 121003
TELEPHONE Ph: 0129-4758500 (10 Lines)
fax: -
E-MAIL –hra@camparimail.com
WEBSITE
http://www.camparitranzs.com
QUALITY ASSURANCE
Campari has a multi-tier quality control system, with each department having a
dedicated quality manager, who is involved in quality control at all stages of
production including fabrics & accessories.
AQL 2.4 QUALITY CONTROL SYSTEM is followed for all our customers.
To achieve high quality standards we have a facility for fabric testing to test the
following as per the
international standards:
*Verification of blends
*Verification of count and construction
*Weight
*Shrinkage
*Color fastness to washing/light
*Dry cleaning
*Crocking and perspiration
*Fabric strength
ABOUT THE COMPANY
Ever since its inception, Campari Exports Pvt Ltd has never looked
back. Growing with Strength as well as value it has achieved the
production capacity of 500000 PCS. Garments per Month.
Infant,
canvas, denims. They are also doing woven knit combo wherein top
125,000 –
machine for dry cleaning). They have complete in-house cut to pack
sampling department.
FACTORY LAYOUT
FLOORS DEPARTMENTS
Emb.
Stiching
Showroom , MD Office .
Disney (for baby Shop and George, since we are a FAMA certified Disney
facility).
• Social Compliance – The factories are Sedex certified, WRAP ,BSCI approved,SA-
8000,
SEDEX
CLIENTS
PRODUCT RANGE
FINISHING DEPARTMENT
After assembly, the garments now come for finishing – a key stage of garment
manufacturing process. Finishing is done to prepare the final garment according
to the quality standards of the buyer before packing it for shipment.
WORK FLOW
WASHING, PERC – according to the buyer’s demand or as per the buyer
specifies recipes and the method to be employed. The pieces are count and
the assembly line now come for thread trimming where trails of thread are
cut off from the seams, buttons etc. manually with the help of trimming
scissor.
Spotting – during the assembly, the garment may acquire stain and other
department or they are locally ‘sported off’. Objectionable stains like that of
chalk are spotted by means of spotting guns containing mild solvent. Harder
and stubborn stain(like that of tobacco, rust, dye, kerosene etc) are sent to
the spotting room where they are cleansed under the spotting machine in a
protective environment. If the spots still don’t go then they are sent for perc
or dry cleaning.
General checking – now the garment comes for general checking relating to
overall stitching. Here, first the general visual appearance is studied which
includes shape of the garments; balancing of the parts; color variations etc.
then any seaming defects are recognized for example unmade seams, missed
stitches etc. as per requirement the checked pieces are send for mending to
visual aid.
Final thread cutting – minute thread like those of labels, bar tack etc. are
trimmed off to give the neat look. Thread loosely sticking to the garments is
also shed off, both in and out by jerking the garment before it goes for
pressing.
pressure, with/ without heat and moisture, for further processing. In case of
knits, this is important but not as significant as in the case of woven because
Measurement and final checking – this is the final and most stringent done for
garment measurement, appearance, labels, trim etc to study the final look and
shape the final look and shape of the product produced. Measurements are done
according to the specification sheets and recording are made for any variations in
the measurement chart. This gives an overall idea about the quality of the garment
being produced.
PACKAGING DEPARTMENT
from the way a garment will be folded to the final labeling of the cartons is
manual. The merchandiser forwards it to the packing in charge along with a top of
production sample i.e. packed with dimension approved by the buyer. This is kept
SECURITY MANUAL
Introduction to our Security measures
As part of our effort to enhance supply chain security of goods ordered by our vendors, we
have set principles, guidelines and procedures at our factory within the premise and its area.
Besides to enhance the security of our factory for the protection of our property and safety of
all employees, it is further established to comply with our vendors’ as well as US Customs’
security requirements. The objective of this plan is to ensure our factory to play an important
role in the supply chain security, and is one of the most secured factories.
Security Policy
Our factory is committed, from our part, to the Supply Chain Security as part of our
compliance program. The management and all employees of our factory are
responsible to uphold and maintain the Supply Chain Security Plan (herein after
called the “SECURITY PLAN” in accordance with the criteria we have set and the
applicable local law within the factory and the factory’s subcontractors, if any.
Principles
Our factory’s security plan has been developed based on the following principles, and shall
focus on prevention and risk management rather than to handle the incident afterward. The
keys of this security plan are:
Prevention on TRESPASSING
Prevention on TAMPERING
Establishment of the TRACEBILITY
Guidelines
Our factory has developed guidelines for every employee in the factory to follow as
part of the factory’s regulations. Such guidelines are posted on the readily accessible
place to alert all employees’ concern on security. These guidelines have been
developed to cover the security of the following 7 areas:
Container / Closed Truck Security – Focus on the physical integrity of the
incoming and outgoing containers / closed truck prior to stuffing and the
procedures of the seals and the reliability of the locking mechanisms of the doors.
Physical Access Controls – Focus on prevention of unauthorized access to the
shipping, loading and cargo areas. To implement controls on identification of all
employees, visitors and vendors. Procedures for challenging unauthorized /
unidentified persons.
Personnel Security – Our factory shall enhance the factory’s recruitment system
to include interviewing and background checks / verifications.
Procedural Security – To set systems and methodology to handle the incoming
and outgoing goods. Engaged with Security Officer on controls of in / out cargo;
record on shipping marks, weights, number etc; procedures for verifying seals on
containers, trucks etc; reporting shortages and overages; storage of empty and full
containers to prevent unauthorized access; and a tracking system of all cargo
movements.
Security Training and Threat Awareness: – This security plan also provides to
our employees a security awareness training, that including operation procedures,
awareness, identity and reporting of crime, and determining and addressing
unauthorized access. The training program encourages active employees
participation in security controls.
Physical Security: – Focus on buildings & constructions; external and internal
locking devices; Store safety; lighting inside and outside the facility; shipping,
loading & cargo areas; as well as internal and external communications systems
for assurance of factory’s physical security.
Information Technology Security: – Focus on the protection and accountability
policy on the Information Technology (IT)
Procedure
Detailed operation procedure on each process of operation in each working area /
department is listed in this security plan as part of our standard operating procedure.
This procedure clearly defines what an employee in different working capacity should
do to achieve the objective of security.
Methodology
All employees, including management and workers, are expected to have a thorough
understanding of the security plan, familiar with the operation procedure. Our education on
awareness and training on practices on supply chain security issues are conducted in the
following manner:
a) Education – Orientation and familiarization of the security plan will be conducted for
every employee and in case of new employee, on the first day of his reporting on duty.
b) Communication – Small group meetings are held periodically for permanent
employees as refresher on Supply Chain Security.
c) Supervision – Managers are responsible to ensure all criteria listed in this plan are
properly carried out.
d) Inspection – Security Manager/Officer nominated is responsible to carry out inspection
on all security devices and implementation of the system.
e) Periodical Review – Periodical review on employee’s knowledge and application of
this security plan will be conducted by our principal Vendors and / or 3rd party audit
firm (s).
Others
This security plan will be modified from time to time to match with new and additional
Security Requirements.
PHYSICAL SECURITY
Grounds: Broken glass fencing surround the factory premises and all gates have
adequate locking devices. As an added security measure, the factory’ gate have been
outfitted with CCTV, flood light and with internal telephone system. Boundary wall of
the factory have been marked with sign “ NO TRESPASSING ”
Parking: Parking lot have been provided proper lighting and private vehicles must not
park in the immediate vicinity of the shipping/loading areas and marked with sign “NO
PARKING”
Building: External and internal doors of the factory have been fitted with adequate
locks I i.e. L-drop, central lock and floor lock As an added security practice, the person
who locking all doors place a paper sticker over the door lock and initial on the sticker.
Windows and doors of the factory remains locked at all times when building is not
occupied.
The packing and loading area have been segregated from the rest of the factory in a
way sufficient to provide secure access and marked with “ RESTRICTED AREA “. No
person is allowed to visit the area, unless designated.
We truly believe that Security Guards are “Eyes and Ears” of the Factory. With out them it is
impossible to run our factory as to take care of work force we employ and would require their
additional help.
At the time of taking over duties, before deploying Security Officers, following actions shall be
taken to ensure that the duty personnel are fit to carry out the next 8 hrs duty shift. If anyone
found not fit to be deployed or staff strength seems to be inadequate to carry out the work
load the head office shall be alerted immediately to allocate replacement or additional staff.
Basic laid down Guidelines for Security Guards
1. Always be punctual and keep it as a good practice and well prepare the task to hand over
to the Security Guards of next shift.
2. Security guards on duty will maintain a log of each and every occurrence/incident on day
to day basis and hand over the occurrence book to the Security Manager / Manager
Administration at the start of working hours for their perusal.
3. Everyday the security guard should personally unlock the doors and carry out security and
fire safety check before all the workers enter the factory in order to ensure that workers are
working in a safe working environment.
4. During every patrol, the security guard is to inspect all the monitoring, functioning of
CCTV, and ensure that all the emergency exits and pathways are unblocked.
5. All the security guards, especially the entrance guard, should always observe and identify
the employees from their identity cards in order to ensure no intruder enters the factory.
6. The security guard should report and hand over all lost employee’s identity cards or other
personal belongings they found during the patrol to security Manager and record those
findings. They are to also inform the HR & Administration Department simultaneously.
7. In case of finding the working procedure of any department likely to cause instant
security crisis, then the security guard should provide corrective recommendations to the
related department and report to the Security Manager for record and file.
8. Before and after working hours, or after all the workers have left the factory, the security
guard should conduct security inspection of all departments/ floors. He/she should inspect
all the security devices and record the date and time of the inspection.
9. Security Guard will conduct security inspection after all workers have left factory. After the
inspection, all the doors/exits are to be locked by the security guard
10. The security guard will always be alert and periodically trained so as to reinforce the
security consciousness.
Security Guards Responsibilities at Gate No 1 & 3
1. Entrance Control
Security guard will be stationed at the entrance gate for 24 hours. Guard on duty should complete
handing / taking over procedures clearly to the next shift before leaving.
4. Visitor’s Registration
All visitors should register (Their company’s name, date and time of entry / leaving, etc.), and should be
further verified by the receptionist before permitting the individual to enter the factory.
2. Packing areas are restricted area. Only the employees marked by name of Packing Department
can handle the work in this area. Other employees not belonging to the Packing Department or
unescorted visitors are not to be allowed to enter the area.
3. Before reporting for work or going off duty, the operator must count and check whether the
quantity of the goods are conforming to the details on the documents, whether the goods are
damaged or moved without reasons.
4. All incoming and outgoing goods are registered in order to ensure that no tampering of
unidentified objects and endangering factory’s security has taken place.
5. During office hour, the workers in the Packaging Department must be on duty. If packing is
suspended due to insufficient order, Department Manager and Security Guard have to go around
and inspect the security of the Department, and the Security Guard must station in the
Department until all employees of the Department leave the factory.
6. At the end of a working day, all packed finished goods should be moved to the separated finished
goods storage area.
8. Recording of the visitors are maintained who enters the packing area only with authorized person
whose name is displayed on Notice Boards.
Security Procedures pertaining to Gate No 2 & 4
Security Guard on taking up the duties at Gate should check the boundary fencing, water pumps,
workshop locks and waste material. Any suspicious items or irregularities should report
immediately to the Security Office In charge and appropriate action should be taken.
At the end of the day the entire factory windows and doors are checked by the security
officer along with authorized officer of the factory.
All keys with dept. head and supervisor are locked and sealed by each and every dept
head / leader and is handed over to the security and recorded in the key register.
A designated Officer of the Factory and a Security Officer opens the Factory. If there
are any abnormalities it is reported to the Personnel Manager or Factory Manager
immediately before opening, which is recorded & Documented.
In Case of Emergency
Fire Emergency- Fire Alarm to be activated, and then the Security Personnel should
act as per the Fire Instructions given in the Fire Policy which is maintained in the
factory premises.
In the event of the Factory being Sealed- Security officers are being authorized to
open the factory with a special log entry. (e.g.: Fire/Earthquake)
Threat of Theft- Security need to alert the police by telephone and need pursue further
action such as inquiry, recording of statements and forward same for further actions of
the management. All Emergency numbers are displayed at the Security Post.
Security officers are being authorized to open the factory (other emergency cases)
such as possibilities of earthquake, terror attack.
After cross checking for the Number of the Keys & making necessary entry in key
register. All keys are kept in the Main Key box and locked .
All-Departments Heads takes the keys from the security guard room by signing the key
record.
During the office hours packing store key will be kept under the custody of security
officer who monitors the packed good area. The packing in-charge of the carton store,
with an entry made in the carton store movements monitoring book, may open the
store in the presence of the security officer.
For loss of any keys under the custody of the security office, sectional head / leader
will be verified by the Personnel Manager. In the event of the Lost Key, lock is
changed immediately and it is recorded in key register.
The security officer / in charge will need to verify the records to ascertain who is
responsible for the loss of key which is under their custody.
The key box is closed and opened under the supervision of the Sunil Kumar Jha &
Bhirgu Prasad during the working hours of the factory. In case of emergency both are
authorized to open/close the factory with a special log entry. (e.g.-fire). The Personnel
Manager has issued the list of Authorized personnel to the security.
again.
4. A representative from the company or the driver of the Vehicle should sign on the gate pass
/ Goods out book at the guardroom certifying that the Items quantities in the gate pass are
same as mentioned in the challans.
5. The returnable delivery notes should be stamped and signed by the security before the goods
leaves the Premises.
In bound Goods
1. All incoming goods, the supervisor in charge in front of security shall count and confirm the
quantity received is correct and recorded accordingly. If there is any shortage/overage of
difference it has to be informed to Production Manager or Authorized person immediately.
2. If any damaged items / packages is detected the supervisor shall inform the production
manager and recorded accordingly.
3. All the Inbound goods are checked for Quantity & weight at the security gate.
Control of the flood lighting for outside illumination and perimeter lighting systems are responsibilities
of the main security room.
Goods
All inbound goods-supplies, raw material (e.g. fabric & trims), finished products from
subcontractors, samples, courier packages, canteen items, maintenance items,
equipment & machinery, items for welfare of society, diesel and other sundries shall be
screened and counted in the presence of relevant officials and recorded appropriately.
Samples and courier packages shall be delivered to appropriate officials.
1. After processing of raw materials transfer documents at our Head Office should inform
the factory co-coordinator with a set of these documents
* Transfer Order / Challans
2. Modelama Stores Manager arranges the required laborers and should inform to the
security officer.
3. No Goods which were not informed to the Guard room, should not be released by the
Security Officer.
4. All the details should be checked by “------“ stores Asstt. And the vehicle no. and other details are recorded in the
delivery order.
5. After verification of the above data, the truck is locked and shall be accompanied by “-
----” Stores Asstt. to the unloading bay.
6. The Security, upon arrival of the truck, checks the locks. In case locks are appeared
to be tampered with, the security OIC and the Factory Manager shall be alerted for
necessary action.
7. After verifying the goods with the delivery order, “---“ Security as well as the stores
assistance needs to sign for confirmation
Raw material Documentation and Storage after Unloading from the Truck
Purchase Order or Style wise these raw materials are identified and are stacked on to
Pallet color lot wise. These racks are numbered, a goods received note is issued and
all details along with the storage identification are recorded in the stock bin cards.
Any packed containing accessories checked for quality and the quantity and is
identified Export Purchase Order or Style wise and stacked in the racks which is
numbered and a goods received note is issued and all details along with the storage
identification are recorded in the stock bin cards.
Mail and Parcel screening procedure- All the parcels which are received by the
company are to be open by the security in front of the person who takes the package.
Security needs to confirm the belongings and record the same in goods receiving
books. Any personal parcel or package to the workers and staff will not be
accommodated by the company and will not receive by the security. All the mails to be
cut the corners of the envelop and shake for any loose contents within before it direct
to the workers by the security in closed area with safety mask and hand gloves.
Check and screen all the incoming mail and packages before distribution.
Record the sender’s name, company name, date and time mail or parcel received. All
records should be kept for at least 3 months.
All outbound goods- shipments, surplus items, machinery & equipment items
purchased by employees, partially completed garments- such as washed or
embroidered panels, finished products from sub-contractors, samples and courier
packages shall be counted in the presence of relevant officials and recorded
appropriately. Relevant authorized signature is and document need to check and
verified.
During working hours all the incoming materials should be send to appropriate
personnel Any package or parcel received during outside working hours it should be
well checked and kept under the custody of the security until the factory re-opens.
Garbage Collections
We had observed at the time of screening of garbage lot of garments which were fresh and
without any flaws were being passed through garbage to which Security informed us of such
incidents. We went ahead and instructed that all garbage which would be leaving our Factory
premises would be first screened by Security Guards and after they allow the garbage would
be disposed.
Vehicles
Key Areas
We have some sensitive areas which are defined as Key areas which are in the well knowledge of
our Security Guards.
1. Generator Room
Generator room is kept under lock when it is not in use. If any maintenance is required they
can attend to that with the presence of a security officer/ Staff.
2. Main Switch Board / Fuses
All security Staff who are on duty should know where the main switch board is and in the
event of an Emergency they are trained to operate the main switch and the fuses.
3. Fire Extinguisher
Each and every security officer/gaurds should know fire extinguisher location.
4. Vehicle Park
1. All the parking areas (for cargo-receiving / loading or private car) is separate from the factory
premises.
2. All private cars are parked in the Parking Slot & the Visitor Cars are parked outside the Factory
premises.
Security Officers Strength
Day Night
SO 1 1
GUARD 10 5
Total 11 6
ACCESS CONTROL
At least randomly taken all workers need to be thoroughly check for their belongings when they enter
in to the company premises.
3. Employees
All employees should show their employee’s identity card at the entrance to the guard
while entering / leaving the factory.
Photo identity card will be issued to each and every employee’s and this card has
been displayed at all times while in the factory.
All employees leaving the premises shall also be subjected to security identification
against the photo identity.
In addition, employees of Corporate office will also be permitted to enter with their
company photo ID. M/s Sentinels Security Ids too are recognized if such security
officers are assigned for security duty officially.
Employees are not usually permitted to bring items to the production floor. Such items
could be kept in the personal lockers provided. A physical checking of such items
brought in to the factory would be carried out as a routine procedure. However, if the
security has any doubt about any package, special checks may be conducted after
alerting the security Supervisor/Officer.
Employees are not allowed to enter and exit after the prescribed entry-exit times
without an explicit approval from the HR division.
Past Employees and potential employees are to be treated as visitors and recorded
accordingly.
Visitors and vendors will have to present government issued identification document
(driving license, national identity card, passport etc) before entering in the factory. This
document will be verified by the security staff on duty.
After their identity has been verified all visitors shall be recorded in the visitor log book
with vehicle no, driving license no and whom they wish to meet.
Visitor will receive a visitor’s badge and he/she has to display at all times in the factory.
Segregation of Visitors
- Buyers / Guest of Chairman /Official from Buying House issue green color visitor
pass.
Only the visitors who wish to meet the management and office staff with prior
arrangement shall be admitted.
All visitors shall be escorted to reception. After that receptionist will call the concerned
person from the concerned dept and he shall escort the visitors till the security gate
after the completion of the work.
No visitor would be permitted after the office hours, until approval from M.D.
Visitors shall not be allowed to be in the production or packing areas unless a related
factory employee accompanies him.
Visitor vehicles shall be directed to the designated areas outside the Factory.
If there are missing visitor identity cards the security staff on the duty should inform this issue to the
General Manager or Personnel Manager by writing all the details in the information book.
The Security officer needs to conduct inquiry on this and need to inform the same to Personnel
Manager or the General Manager.
The Personnel Manager needs to check with the visitor and need take the visitor badge from the
visitor.
The Factory Manager or the Personnel Manager needs to inform this matter to the GM Manager.
If unable to receive the visitor pass the General Manager need to revise the visitor badges list by
deleting the missing number he may add to new passes by changing hole set of badges by changing
the color in every year.
If there is a visitor without visitor I.D. cards the security staff on the duty should inform this issue to
the General Manager or Personnel Manager and need to verify the visitor for his identity.
If the details of the visitor registered and the visitor pass not issued the security need to issue a visitor
pass to the visitor.
The security staff on the duty should write all the details in the information book and needs to conduct
inquiry on this and need to inform the same to Personnel Manager or to the General Manager.
If the visitor even not registered in the guard room the security needs to verify details from the
Personnel Manager or the Factory Manager the security staff need to issue a visitor pass after
registering of the visitor.
The security officer needs to inform this to the group General Manager in writing and he conduct an
inquiry on this.
PERSONNEL SECURITY
2 The Personnel Manager shall conduct an interview with each candidate and document
the interview results in the employee’s personnel file.
4 Upon hire, employees has to submit 4 copies of recent photographs, these photos are
to be maintained in the employees file.
5 For special employees, such as packing staff, drivers, security guards, a copy of their
licenses, certificate, training records etc. should be maintained in the employee’s files.
* Birth Certificate
* National ID card
*. School leaving certificate
* Service letter if any
* Reference check
* Previous employment verification check for sensitive post such
as packing workers, drivers, store staff etc.
All employees are issued with Coded photo identity card. Special red color band are issued to
packing division workers.
1 Photo employment pass, keys, important documents must be returned to HR upon dismissal, vacation of post, retirement or
resignation.
2 In case that employment passes are not returned, names and photographs would be displayed at the Security guard house for
detection.
List of Authorised Person to accompany the visitors who enter the Packing Dept.
1. Merchandiser -
2. Production Manager -
3. Factory Manager -
4. CEO -
5. Managing Director -
6. Director -
7. Chairperson -
Security
Periodic verification and scrutiny of security agency and its staff movements by way of a routine and also by unannounced auditing process
PROCEDURAL SECURITY
Documentation:
Booking is made with the nominated forwarders in Mumbai/Delhi 10-15 days before the shipment
date with the full details like PO No, Style No, Qty value weight , measurement, shipper name,
consignee name and notify with the actual handover date in Mumbai and planned vessel.
2. After 2-3 days from the date of booking we take confirmation from the forwarders for the approval
from the buyer for the cargo to be shipped by scheduled date as to catch the designated vessel.
3. Following documents are forwarded to our C & F agent 5 days prior the shipment date for custom
clearance purpose.
Logistic procedure:
We use contracted Transporter with the name of “Best Roadways” for transporting the shipment from
Delhi to Mumbai.
Only the goods which are passed after the Final audit are taken into Packing section. M/s Best
Roadways sends the closed containers/Trucks to our factory to pick up the Cargo.
As and when truck/container comes, 7 point inspection is done by the security guards, credentials of
the Driver is cross checked (ID Card/Drivers License) & only then it is allowed to enter the premises
of the factory.
Loading of the Shipment is done in the presence of Security Guard & the packing In charge. After
loading of the truck/Container, security officer ensures the closure of the container with proper lock
seals.
We issue the invoice and packing list, which is handed over to the truck driver and in turn Best
Roadways issue the lorry receipt showing the consignee name Destination, Packages, Lorry no etc.
Production manager provides all the dispatched details to C&F agent by mail in Mumbai. We also
send a copy of Lorry Receipt to our C & F agent by courier.
Tracking of the shipments at various transit points always to be monitoring till the final destination.
The transport union has been given all land line & cell phone no of concerned official who are to
contacted for all briefing & debriefing
The custom and forwarder base officials to akcnowlegde the receipt of shipment.
After unloading the shipment C & F agent custom clears the goods after doing all the formalities with
surveyor and Govt. officials. After custom clearance stack the shipment PO wise /style wise and
handover the shipment to nominated forwarders for stuffing and loading in planned vessel.
Nominated Forwarder then issues the Forwarder’s Cargo Receipt .
1. After final quality audit only good garments will be taken custody by the packing dept.
2. Recorder needs to maintain the records on style, P.O. No. / color and qty.
3. There after garments should be stacked Style / P.O. No and Color, size wise in the Packing dept. before poly bagged.
4. Packing Section or Finishing Section supervisor arranges the packing plan and gives it to the
leader, who in turn will arrange the packers accordingly and after they are packed in the
cartons. Close supervision during the packing process is witnessed by the Supervisor in
charge.
5. The packed Goods supervisor will check each carton for it contains – ratio and qty. size /
weight of the carton under the supervision of the security officer. No half or semi finished cartons
6. There after it’s taped and stored in the carton store which is locked. Only authorized packing
store assistance who has identification is allowed to enter this store. If any other staff wants to
inspect this store will be accompanied by packed carton supervisor and a Security officer and
this will be recorded with details.
7. Packing store key will be sealed and be under the custody of the security. When the carton
store supervisor needs to open this store they have to call the security. Under security supervision
Company background
* Need to have fix company policy.
* Company should be Government registered.
* Should maintain proper rules and regulation, free form any illegal activities.
* Company should be good financial background.
* People of the company and its belonging should cover with proper insurance. (Insurance
Policy of Trucks, Persons, Goods. – should provide copy)
Vehicle Details
* Need to have full body covered Trucks with good running condition.
The truck driver needs to have a padlock to lock the truck doors to ensure on vehicle movements.
Should inform when ever any changes take place deposal / acquiring new vehicle.
Follow up:
Record should be maintained for the transport movement of the vehicle (running chart)
in the Truck and it should be counter checked by our staff.
Need to report all details such as Truck / Lorry No., Truck / Lorry Driver contact numbers and name should be
provided at the time of calling upon for transportation by our logistics department.
Need to follow up the given details by the Modelama’ logistics department. (specially
Time and location)
Operational Procedure:
* The Drivers and Assistant should be well-behaved and well disciplined while they are in duty.
* The drivers and assistant should be well trained with logistics background.
* The drivers thoroughly follows the traffic instructions, Customs, Port Authority and local
law when they’re in duty.
In case of emergency:
* All the Truck / Lorry should be provided with emergency Telephone numbers (e.g. nearest
Police Station / Police Emergency Service)
* Delay for minor problems (Traffic jam or personal reason) – need to inform estimated time
to the head of Modelama’ logistics department.
* Delay for major problems (Accident or problem with the truck) – need to inform immediately
to the head of Modelama’ logistics department with below details.
* The place of incident
* Its severity of incident
* Recoverability at site
* Expected time to return the operation
* Need to follow the Modelama’ logistics Manager Instructions.
* If needed replacement of vehicle need to be done, it will be done under the supervision of Modelama’ Logistics Department
Information and Details of All our shipments, documents should not be disclose to any
other parties.
Any people or goods are not allowed to transport in the operation time.
To co-operate with Modelama’ Auditors for internal security audits on annual basis.
CONTAINER SECURITY
The land carrier should have procedures to ensure all ocean containers/conveyances are thoroughly
inspected prior to loading. This inspection is to include the interior of the container / conveyance to
confirm it is empty in addition to the exterior / interior of the container in order to ensure it is
structurally sound.
1. Trucks Inspection
The physical integrity of the truck structure must be verified prior to entering into premises, to include the reliability of the locking
mechanisms of the doors. A seven-point inspection process is required or all trucks: The separate checklist to be use on this purpose
with below checkpoints.
* Front wall
* Left side
* Right side
* Floor
* Ceiling / Roof
* Inside / Outside doors
* Outside / Undercarriage
2. Conveyance vehicles:
* Checking of all accessible areas, such as driver’s compartment, glove box, trunk etc.
* Make sure that the vehicle is properly serviced, i.e. has proper levels of oil, water, tire
pressure etc. to avoid stops for servicing en route.
* Make sure that all locks are functional.
3 Containers:
* Hidden compartment
* Check for the odor of fresh paint, burnt wood, or body filler.
* Check for sign of fresh paint, welding burns, and variances in wall texture.
4 Structural serviceability:
* Check for cracks in the front and rear corner post
* Check if the panels are holed, cut, torn or cracked, missing loose parts or fasteners.
* On the door end, inspect the locking bars, including brackets, guides and look
for any deformation such as a bend, bow, dent that impairs door operation or secure
closure.
On the understructure, inspect the cross members, outriggers and attachments for
holes
On the understructure, inspect floorboards, panels or planks for tears, cracks or cuts.
Trucks Inspection, Contingency Plan.
a. Main security office will verify the truck number provided by the transporter.
* if the truck no is correct they will proceed for checking of drivers identity and
checking of truck.
*. if the truck no is incorrect security will keep the truck out side of the company and
inform the management for further action.
2. After verification has been done security will check the identity of driver and his assistant (if
any). They may ask for their national ID card, driving license before taking them into the
factory.
* If the security confirm about their identity they will make his entry(Name, driving
license no) and issue the visitor pass.
* After issuing pass security will go through for checking of truck with given 7 point
checklist and found any damages or discrepancies they will inform the factory
manager & transport contractor.
* Security will keep the driver/cleaner away from the company and inform the Factory
Manager for further instructions.
IT POLICY
Network Design
Company is equipped with all branded systems (IBM) over the LAN having connectivity configuration
of 10/100 mbps.
Components Used:-
Switched Structured Cabling with Lucent products to ensure high up time.
Using High quality scanners n printers to print BLACK or COLOUR prints of any size.
Web: - www.modelamaexports.com
(Web site with all details about company)
Work is ON:
Planning to provide all necessary information to its buyer by providing them user name and password
which will enable them to view all transaction details on the web only.
Antivirus Solutions & firewall
Using MacAfee corporate edition & Norton antivirus software to ensure the virus free network with the
help of regular updates from the NET.
Created firewall with TREND MICRO software product on mailing server.
Building SPAM CONTROLLER to stop unwanted mails.
Microsoft Software’s/ERP/EDI
Having all the required the LICENSES to ensure the legality of software usage. (FROM
MICROSOFT)
Security
Authentication of users requires unique personal identifiers (called login), and
Confidential passwords that are changed quarterly changing of passwords are delegated.
With IT head section authorizes the user to access its systems and notifies the security administrator
in writing or via secure electronic mail. The security administrator assigns a unique login to the user,
and notifies the user of the login and password. The user must enter his login and password to get
access to computer resources. The access control system authenticates the user by comparing the
login and password given by the IT Dept. When circumstances change, such as when an employee
is terminated, management promptly notifies the security administrator to revoke or reassign the
user's login. The security administrator revokes or reassigns the assigned login when notified by
management. For convenience, the security administrator may suspend permanently rather than
delete inactive login.
Database security – Data backup and Access permission given only system administrator.
User Password – change after every 3 month or if user required.
Multi-user System: Users sharing the system are either not known to each other or are not all
mutually acceptable.
-------------------------------------- -----------------------------------
Signature of participant I.T. System Administrator
Training
Identifying Conspiracies
It is workers duty to safe guard the company by not involving in such activity
19. you may ask for company details attached to the export/import documents
20. you may ask to insert package parcel or envelope in cartons.
21. Mental or physical threat from insider/outsider to involve in any illegal activities.
Reporting
For any illegal activity if noticed, to be reported to the following heads immediately,
22. Supervisor, Floor In-charge, Personnel Manager (-Name-), Factory Manager (-name-), Officer
In-charge(Security).
Security Personnel
All security personnel have received specialized training. The training has been provided by
the agency M/s Sentinels Security supplies the security personnel. Training topics cover the
following areas.
1. Assignment or post orders
2. Bomb threats
3. Communications
4. Crowd control
5. Ethics, honesty, professional image and proper conduct
6. Fire prevention and control
7. Fire equipment
8. First Aid
Supervision
Following Officers of M/s Diamond Security will be visiting the Guard indicated below:
1. Visiting FO – Four Inspections Day time & two inspections in night time per week
2. GM Operation – Once in a month (Day & Night).
I checked the facility and found all gates, windows , lights , fans and fire
safety equipment are in proper working condition.
Remarks if any
………………………………………………………………………………..………
………………………
Signature…………………………….
Signature……………………………
Campari Exports Pvt Ltd
RECRUITMENT POLICY
The management of M/s CAMPARI EXPORT PVT.LTD. Recognizes the human value of a
person & appreciates negative economic and social consequences due to employment.
Company recruits employees according to their Man Power Plan, which is designed on the
basis of business/ capacity of the company. Following are the recruitment procedures of
M/s…CAMPARI EXPORT PVT. LTD………………………….
3. For sewing operator, apart from personal interview technical test is taken & then
their grades are decided on the basis of the result of their test, which is as per
Haryana Minimum Wages rules.
4. For helper, personal interview & dexterity test (peg board, color blindness etc) is
taken. The helpers (unskilled) workers are paid Rs………… /-pm & those fall in
semiskilled category paid a consolidated wages of Rs ……………../-pm.
7. No employment is allowed without the proof of age i.e. School leaving certificate,
Medical certificates from a dentist / affidavit/age shown on Ration Card/age shown on
Identity Card / Driving Licenses.
8. The prohibition of employment of child labour will be displayed conspicuously at the main
entrance of the factory.
Manager HR
Campari Exports Pvt Ltd .
LIST OF MACHINERY
Particular Qty
1) BROTHER SINGLE NEEDLE HIGH SPEED LOCKSTITCH MACHINE 600
2) BROTHER DOUBLE NEEDLE LOCKSTITCH SPLIT FEED MACHINE 20
3) BROTHER COMPUTERISED BARTECK MACHINE 04
4) BROTHER BUTTON HOLE MACHINE 04
5) BROTHER COMPUTERISED CROSS-STITCH LOCKSTITCH BUTTONING MACHINE 04
6) WAIST BAND ATTACHMENT MACHINE 04
7) 5 THREAD OVERLOCK MACHINE 25
8) EASTMAN CUTTING MACHINE 02
9) BAND KNIFE CUTTING MACHINE WITH AIR CUSHION TABLE 01
10) AUTOMATIC SNAP FASTNER WITH COMPRESSOR 10
11) FUSING PRESS (HASIMA-CONTINOUS FEED) 02
12) ENZYME WASHERS – NGAI SHING 04
13) RAMSONS – 200 KG CAPACITY WASHER 01
14) HYDRO 03
15) DRYING TUMBLER – NGAI SHING 03
16) HEATED VACUUM TABLES – NGAI SHING 20
17) STEAM PRESSES – NGAI SHING 20
18) THREAD SUCKING MACHINE 02
19) REECE KEY HOLE BUTTON HOLE MACHINE 02
20) FEED OF THE ARM 02
21) AUTOMATIC STICKERING MACHINE 12
22) CARTON STRAPPING AUTOMATIC MACHINE 02
23) PERC DRY CLEANING MACHINE 02
24) CINTEX & LOCK NEEDLE DETECTOR M/Cs 02
25) SPOTTING STATION MACHINE 02
26) COMPUTERIZED EMBROIDERY MACHINE 82
27) THREAD WINDING MACHINE 02
28) LAYER DRILLING MACHINE 02
29) FLAT LOCK MACHINE 02
30) FOUR THREAD OVERLOCK MACHINE 04
31) FLAT LOCK WITH TRIMMER 02
32) YKK NEWMAX SNAP ATTACHING MACHINE 02
33)SIRUBA/KANSAI 12 NEEDLE SMOCKING MACHINE 02
STITCHING MACHINE MAINTENANCE CARD
LIST OF HOLIDAYS
Minimum Wages of haryana gov.
Campari Exports Pvt Ltd
Risk Assessment Policy
AREA ACTIVITY POTENTIAL RISK RISK PREVENTION
Cutting Fabric & pattern Injured fingers by Scissors to be knotted with tables.
cutting scissors. Train workers to use scissors
properly.
Sharp tools to be kept in proper
place after finishing the work.
Pressing Pressing Open wiring Wirings are in conduit pipes.
garments Proper electrical Electrical connections are with
connection covered safety switches.
Earthing
Skin contact
Washing Washing of pcs Skin harm with Use gloves, gum boot and mask
chemical and water
Electrical Electric faults Prevent from electric gloves, shoes and use rubber mat
shock
DG Set Electric shock While working without Use the PPE like gloves, shoes
operator adopting precaution and rubber mat while working on
operation can be DG set,
affected by elect shock
Pregnant On production Any hurt can cause While working , sufficient space be
woman floor abortion / miscarriage given to pregnant lady to avoid
any hurt from other workers. Also,
stool with back rest be given to
work conveniently.
authority.
committee.
Everyday’s fabrics related wastes and rejected cut-pieces would be
local agent.
recycling.
1. Repeat Order
2. Stock Order
3. New Order, and some are used to create samples
1) Provides a framework for enhancing the safety and security of its operations.
2) Mitigates the long term effects of an emergency on its operation and mission.
SCOPE: This Policy applies to all employees and visitors of Campari Exports Pvt. Ltd. is
Not limited to, the following Emergency situations:
Emergency management is the process of preparing for, mitigating, responding to and recovering
from an emergency. The emergency management plan is the cornerstone of this process and provides
for a co-coordinated response and a clear line of command.
1) The Health & Safety Management Team handle the situation in case of an emergency. This
team is responsible for overseeing the development, implementation and maintenance of the
Emergency management plan and for effective overall management of an emergency.
a. Review and evaluate the factory emergency management plan and the faculties’ and
administrative department plans once a year.
b. Initiate and co-ordinate one annual emergency exercise or stimulation and evaluate the
response.
c. Issue directives and protocols as appropriate.
e. Manage Emergencies as outlined in this policy and in accordance with the Emergency
Management Plan.
MANAGER HR
2) Employees can take help from the below given nos. depending upon the gravity of
Emergency.
OBJECTIVE: The objective of this policy is to comply with the Indian Government Rules &
Acts and other international Law & standard concerning to Forced Labour.
SCOPE: This Policy applies to all employees of CAMPARI EXPORTS PVT.LTD PVT. LTD
DESCRIPTION:
CAMPARI EXPORTS PVT.LTD PVT. LTD. Management is committed not to use any indentured,
bonded, prison or any other type of compulsory labor in our organization.
(a) Company will not take part in any type of recruitment system or other practice that
indentures or bonds an employee to the workplace. Such behavior would include
deducting from an employee’s wages as basis for repayment of a bond or fee incurred
during recruitment. All wage deductions must be appropriate and in full compliance
with local laws (like ESI & PF Employee Contribution and TDS if applicable).
(b) CAMPARI EXPORTS PVT.LTD PVT. LTD. will not use prison labor, nor shall they
subcontract any work to prisons.
(c) CAMPARI EXPORTS PVT.LTD PVT. LTD. will not retain any personal documents
(only photo copies are permissible for verification of legal right to work) as a condition
of employment.
(d) Company will allow employees to terminate employment in accordance with conditions
established at the time of hire.
(e) CAMPARI EXPORTS PVT.LTD PVT. LTD. would not deduct an excessive amount of
funds (e.g., fifty percent) from an employee’s salary nor will deductions exceed the
legal limits.
(f) During working hours, employees will be permitted to move about freely within their
designated work zones and allowed the use of toilet facilities and water drinking
stations. Management would not prevent employees from departing the facility during
meal periods (should time allow) or after regular working hours.
(g) The prohibition of employment of Forced will be displayed conspicuously at the main
entrance of the factory.
(h) To make ensure that employment against debt, taking originally certificate of
candidate, in lieu of training, through bond / Stamp paper etc will not happens.
(i) Prohibition of employment of Forced/ involuntary / indentured / bonded Labor will also
be communicated to the Recruiting agencies, Contractors.
(j) CAMPARI EXPORTS PVT.LTD PVT. LTD. is strictly adhered to follow standard in
relating to forced/bonded/Prison Labor.
HODs are requested to bring this Policy to the notice of all workers working in their
department. Any grievance of discrimination of any type should be referred to General
Manager (HR & Compliance) who will take appropriate steps to redress the grievances
immediately.
Authorised Signatury
Campari Exports Pvt Ltd .
As per the management policy it has been decided that all the keys of Windows /doors (Internal &
External) /shutters shall be maintained only by the security guard in key box.
The security guard shall maintain a key issue-receive register to record the date & time of issue-
receive of keys, the employee involved, reason for issue of key and name of guard issuing the keys.
Any lost / stolen keys have to be immediately reported to the admin department.
Framed on:-
To be reviewed on:-
Campari Exports Pvt Ltd .
yaaOna ]%pIDna naIit
maihlaa kma-caairyaaoM ko yaaOna ]%pIDna sao doSa ko kanauna
tqaa p`akRitk inayamaaoM daonaao ka ]llaMGana haota hO. kMpnaI
maoM yaaOna ]%pIDna vaij-at hO AaOr saBaI straoM pr AsvaIkaya-
hO . yaaOna ]%pIDna kI naIit kMpnaI ko saBaI straoM ko kma-
caairyaaoM pr laagaU haotI hO.
1• pirBaaYaaeoM Á
k SaarIirk spSa- yaa ]sasao AiQak
K yaaOna sambanQaI kaya- ka p`stava
ga yaaOna sambanQaI Anya saMkot
Ga ASlaIla ica~ p`dSa-na
D Anya AsaBya SaarIirk¸ maaOiKk yaa AmaaOiKk yaaOna
sambanQaI vyavahar.
2• bacaava sambanQaI kdma
Pa`baMQana/p`baMQak va Anya ]%trdayaI vyai@t yaa kaya-
sqala ka p`BaarI vyai@t inamnailaiKt kdma ]zaeoMÁ
1• kaya-sqala pr yaaOna ]%pIDna kI manaahI (]pro@t vya@t)
ka saMdoSa saUcanaa Wara yaa Anya saaQana Wara
vya@t kroM.
2• ]prao@t AaQaar ko tht Agar kao[- vyai@t ApraQaI payaa
jaata hO tao ApraQaI pr dND Aacaar inayamaaoM ko tht
lagaayaa jaae.
3• jaha^M [sa p`kar ka ApraQa BartIya dND saMihta yaa Anya
inayamaanausaar p`mauK ApraQa kI EaoNaI ko Antga-t
Aata hO tao Pa`baMQana/p`baMQak kao sambainQat
AQakarI ko pasa iSakayt dja- kranaI haogaI.
3• yaaOna ]%pIDna ko davaaoM ka samaaQaana
1 p`ariBak salaah
2 saulah krnaa
3 AaOpcaairk iSakayat
4 ApIla
5 irka-D
]prao@t baataoM kao Qyaana maoM rKto hue kmpnaI nao [sa p`kar
ko maamalao inabaTanao ko ilae yaaOna ]%pIDna
saimait ka gazna ikyaa hO.
AiQakRt hstaxar
yaaOna ]%pIDna
iSakayat–Flaao caa-
T
yauinaT ko p`BaarI AiQakarI Wara
dI jaanao vaalaI p`arimBak salaah
AiQakRt hstaxar
mnns’; % dk;Z ifjfLFkfr] ;a=ksa] midj.kks dks lqjf{kr fof/k }kjk lqjf{kr
djuk vkSj laxBu esa O;kikj gsrq LokLF; lqj{kk okrkoj.k lEca/kh fu;ekksa
dk ikyu djkuk A
O;k[;k%&
1- izca/ku dk vk’k; & pqafd dEiuh fu;kZr djus ds fy, mPp QS’ku
jsMhesM xkjesaVl fofuekZ.k dh izfdz;k es layXu gS blfy, fdlh
Hkh [krjukd vkSj fo’kky ;a=ks dk iz;ksx ugh fd;k tkrk gS A blfy,
dksbZ cM+h nq?kZVuk gksus dh lEHkkouk ugh gS A ;|fi fdlh
NksVh nq?kZVuk ds laLFkku esa gksus ls budkj ugh fd;k tk
ldrk vkSj laLFkku @ dEiuh lqj{kk ,oa LokLF; lEca/kh
nq?kZVukvks ds fy, mik; fd, x;sa gS A bl uhfr dk mnns’;
nq?kZVukvks dks jksduk@ de djuk tks fu;kstu ds vuqdze
gksrk gS A
izca/ku LokLF; ,oa lqj{kk gsrq ,oa vius lO;ogkj dks lapkfyr djus
gsrq fuEu fyf[kr mik;ksa ds ek/;e ls vius mnns’; dks izkIr
djsxk A
1- deZdkj dks tkx:i djuk vkSj fu;fer izf{k.k A
2- lqjf{kr dk;Z laO;gkj A
3- mRiknu ls lEcaf/kr lqj{kk izfdz;k ds vuq:i izsf"kr djuk A
4- fdlh nq?kZVuk dks lkeuk djus gsrq vko’;d mik; djuk A
2-mnns’;%
d- vius deZpkfj;ks dks mfpr dk;ZfunsZ’k dk;ZLFky o la;=] ;a=
iznku djuk tks fd dk;Z gsrq lqjf{kr gks vkSj nq?kZVuk] lEifr
dh gkfu dks de djus esa lgk;d gks A
[k- vius deZpkfj;ks dks fdlh u;s ifjlj] izfdz;k] midj.k] inkFkksZ
vkSj dk;Z i)fr ls voxr djkuk vkSj vfLrRoeku izfdz;k esa
LokLF; vkSj lqj{kk ds fy, iwokZuqekfur [krjk essa lqjf{kr djuk
gS A
x- izf’kf{kr deZpkjh dks lqj{kk ,oa LokLF; laca/kh rF;ksa vkSj vius
mRrjknkf;Ro ds lEcU/k esa voxr djkuk A
mRrjknkf;Ro &
A LokLF; vkSj lqj{kk dk;Zdzeksa dks fu;f=r laxfBr vkSj rS;kj djus
ofj"B izca/kd (
izca/kd LokLF; ,oa lqj{kk uhfr dks dk;kZfUor djus ds fy,
vkSj izfdz;k es izf’kf{kr ,oa f’kf{kr djuk vkSj fdlh Hkh lqj{kk
& bl uhfr dks dk;kZUo;u vkSj IykaV esa lqj{kk ds mPp Lrj
& vius ns[k js[k esa izR;sd ekg esa lqj{kk ehfVax djuk A
lgk;rk nsuk A
izo`r djuk
deZpkjh
izfdz;k vkSj fu;eksa dk ikyu djsa vkSj vius izfr vkSj nwljss ds
gksaxsa A
;fn mUgsa dksbZ lkeku fn;k tkrk gS rks mls lqjf{kr j[ksa A
dk;Z dks djus esa vH;Lr vkSj dk;Z ls lEcaf/kr vko’;d [krjk
izf’k{k.k
nsus vkSj muds dk;Z es izf’kf{kr djus vkSj lalqxr LokLF; vkSj
vko’;d gks A
nq?kZVuk dks jksdus oS/kkfud vU; nkf;Rp dks iwjk djus gsrq
nsuk A
ijke’kZ nsuk A
lqj{kk lfefr dks LFkkfir djus gsrq lykg nsuk vkSj ,sls lfefr
gksa A
lqj{kk lfefr
deZdkj vkSj izca/ku ds cjkcj &2 la[;k }kjk lqj{kk lfefr dk xBu
dk;kZfUor dju A
ikyu djuk A
iqujkyksdu djuk A
esa feyus okys O;fDr vkSj deZpkjh ds LokLF; vkSj lqj{kk ds fy,
viuk;k x;k gS A
lqj{kk uhjh{k.k
dj ldrs gS A
6-vkx jksdFkke lqj{kk vkSj vfXu’keu lqfo/kk
gS A
LokLF; uhfr
izR;sd mlh deZpkjh dks fu;ksftr fd;k tk,xk tks fpfdRlh; :i
gS A
fdlh vkikrdkyhu ifjfLFkfr ds fy, ,Ecqysal dh O;oLFkk
p`baMQak
1. The company shall remove the child worker from the work place & help enroll them to school
& ensure they do not suffer more than if they were to remain working or do not end up working
with other factories.
2. The company will provide adequate support to enable such children to attend & remain in
school until no longer a child.
3. The company will bear the following costs:
a. Tuition related expenses such as uniform, books & living stipend to replace the lost
income.
b. The company will offer to hire the parents, guardians, elder siblings or members of the
extended family of the children. OR
c. Pay a living stipend to replace lost income.
4. The Management will protect the under age children from exploitative conditions that could
harm the children physically, morally & financially.
7. The company has an effective procedure for halting new hires of children & this involves
additional training for managers or a program to apprise them of company policy.
Authorised Signatury
In the Law School's view, the 'don't ask, don't tell' policy of
the United States military constitutes or permits
funding.
Authorised Signatury
LEAVE POLICY
Purpose
The objective of this policy is to explain the leave entitlement
and procedure for availing leave. You are eligible to the
following leave benefits.
Annual/EarnedLeave
opportunity to rest and get away from the everyday routine. You are
Un availed earned leaves if any for the year can be carried over to
the next year. However you can carry over a maximum of 10 ELs
LeaveEncashment
maximum of 60 working days at any given time. Any leaves over and
Casual/SickLeave
Maternity Leave
Female employees who have been working with the company for not
less than 90 days will be eligible for 90 days of paid maternity leave,
duties, application for maternity leave will have to be made not less
Absence from work due to miscarriage or any other illness arising out
medical leave. Employees covered under ESI, shall govern as per the
ESI guidelines.
Paternity Leave
The leave should be availed within three weeks time of the birth of
confinements.
Special Leave
leave over and above the other leaves above mentioned for one
special occasion. This can be either his/her birthday or wedding
anniversary only.
Compensatory Offs
efforts.
Holidays
weekend/ earned & casual leaves there are 10days declared as paid
applicable.
Authorised Signatury
vkKk ls
vf/kd`r gLrk{kjdrkZ
AiQakRt hstaxarkta-
FIRE CYLINDER CHECKING REPORT
01 Jan-19
02 Feb-19
03 Mar-19
04 Apr-19
05 May-19
06 Jun-19
07 Jul-19
08 Aug-19
09 Sep-19
10 Oct-19
11 Nov-19
Dec-19
12
DAILY FIRE SAFETY
All Type Of ISI Fire Fighting Equipment & Accessories
1092, Gali N0.10, Govindpuri, Kalkaji, New Delhi-110019
E-Mail : dailyfiresafety@gmail.com & info@dailyfiresafety.com
Website :www.dailyfiresafety.com
HOTLINE: - 9818802756, 9968127221,9313543184
Dated-: 06/07/2019
To ,
M/s Campari Export Pvt. Ltd .
14/9,Gurkul Industrieal Area ,Sarai Khawja, Sarai
Faridabad. Haryana ,PIN CODE: 121003 India
This is to certify that the following Fire equipments have been checked and
found in working condition :-
(a) Fire Extinguisher
(b) Hose real
(c) Fire Alarm
(d) Hooter
(e) Smoke
(f) Spangler
(g) Hydrant
Thanking you
Yours truly,
FOR, Daily Fire Safety
DAILY FIRE SAFETY
All Type Of ISI Fire Fighting Equipment & Accessories
1092, Gali N0.10, Govindpuri, Kalkaji, New Delhi-110019
E-Mail : dailyfiresafety@gmail.com & info@dailyfiresafety.com
Website :www.dailyfiresafety.com
HOTLINE: - 9818802756, 9968127221,9313543184
Date:-06-07-2019
This has reference to the discussion with the undersigned regarding the
requirement of evacuation drill.
The evacuation drill conducted on dtd…06-07-2019 from 12:30…… hrs and the
details for the same are as follows.
OBSERVATION:-
Smoke generated – At 12:21:56 hrs
Fire reported – At 12:22:42 hrs
HOOTER BLOWN – At 12:23:52 hrs
Complete floors evacuated – At 12:52:58 hrs
FIRE EXTINGUISH – At 12:56:00 hrs
REPOTED – A CLASS OF FIRE
Fire extinguishers used – ABC S\P 5 KG. QTY -01
NO injury reported during the drill.
RESPONSE – GOOD (orderly manner and cooperative)
In case you require any further information\clarification ,the undersigned will be
pleased to furnished the same .
Thanking you
Yours truly,
FOR, Daily Fire Safety
Date:- 06-07-2019
Campari Exports (P) LTD
14/9,Gurkul Industrieal Area ,Sarai Khawja, Sarai
Faridabad. Haryana ,PIN CODE: 121003 India
SUBJECT: EVACUATION DRILL
Dear Sir,
We are glad to inform you that evacuation drill has been conducted at M/s. Campari
Exports (P) LTD. Plot No - 14/9,Gurkul Industrieal Area ,Sarai Khawja, Sarai Faridabad. Haryana ,PIN
CODE: 121003 India, The Report of the same is as follows:
This is to certify that Evacuation drill has been conducted in the factory premises on
dtd……06/07/2019……………….. and all the employees have successfully vacated the entire
factory premises within 01…….. minute …59…. seconds from the places of their individual
work places.
The response during evacuation was good. No accident has taken place.
Thanking you
Yours truly,
Date:- 06-07-2019
Dear Sir,
This has reference to the undersigned had with you regarding the requirement of fire
fighting training as per agreed term and conditions.
The fire fighting training conducted on dtd 06-07-2019 from 12:32………. hrs to 12:33:59
hrs and following topic covered.
(1) INRODUCTION
(2) FIRE AND FIRE TRANGLE
(3) CLASSIFICATION OF FIRE
(4) METHOD OF EXTINGUISHING
(5) FIRST AID FIRE FIGHTING APPLIANCES
(6) CAUSES OF FIRE
(7) FIRE PREVENTION
(8) FIRE PREVENTION MEASURES
(9) DEMONSTRATION
(10) EVACUATION PROCEDURE
In case you require any further information\clarification, the under signed will be
pleased to furnished the same.
To ,
M/s Campari Export Pvt. Ltd .
Plot No. -14/9 ,Gurukul , Industrial .Area ,Sarai Khawaja , Date-06-07-2019
Faridabad Haryana -121003
To Whom Soever it may concern
This is to certify that the following person have joined the fire fighting training programme .
1. How to operate fire Extinguishers .
2. How to extinguish fire .
S. NAME F/NAME DEPTT. Sign.
N
O
.
01 Dharmendra Sh. Shorat Peon
02 Rakesh kumar singh Mohan singh Electrical
Fire Equipment
vkKk ls
vf/kÑr gLrk{kjdrkZ
WORKERS
REPRESENTATIVE
कककककककककक
ककककककककक
In the event of any sexual harassment, the lady staff may feel free to contact any member of the
committee or may write an e-mail at madhuribakshi.pla@gmail.com.
2.
Mr. Rabindra Mandal Member 8826797618
3.
Mr. Rampal Yadav Member 8826797622
4.
Ms. Madhuri External Member 9891813399
Regards,
5.2 Implementation
Campari monitors its activities for human rights risks and impacts in order to identify
actual and potential human rights issues. Actions to manage and address human rights
risks are guided and carried out through dialogue and in collaboration with relevant
stakeholders.
RESPONSIBILITY
Campari Group Committee is responsible to update and communicate the
Policy.
HR Department is responsible to adopt the principles of this policy and
to implement it. General Managers are responsible to ensure that
adequate resources are provided for the implementation of this policy.
LEGISLATIVE REQUIREMENTS
Campari Exports Pvt Ltd is committed to the principles of the following human rights
standards:
The Universal Declaration of Human Rights
The Voluntary Principles on Security and Human Rights
ILO Declaration on Fundamental Principles and Rights at Work
UN Declaration on the Rights of Indigenous Peoples
Guiding Principles on Business and Human Rights
Legislation pertaining to human rights in the countries where we operate .
Authorised Signatory
Time & Payroll
Sub : APPOINTMENT
With reference to your application and the subsequent interviews you had with us, we are
pleased to offer you employment in our Organisation under the following terms and conditions:
1.3 However, it is expressly understood that your services are transferable to any of our,
establishments/ Subsidiaries/Group Companies/Associate Companies/ Companies in
which has substantial shareholdings at the sole discretion of the Management
3.0 SALARY
You will be paid a Gross salary of Rs. 7700/=00 (Seven Thousand Seven Hundred Only)
3.1 You will be eligible for increments on completion of one year of service
3.2 Increments are not automatic and will depend on the Management’s evaluation of
your
performance during the year.
4.0 LEAVE
You will be entitled E.L., Sick Leave and Casual Leave as per the Company rules
You will be governed by the timings and the hours of work applicable to the
establishment wherein you are posted, and you may be called upon to work in shifts, if
required
6.0 GENERAL
6.1 You are required to adhere to the disciplinary requirements of the company
6.2 It is an express condition that the Company’s personnel are whole-time employees
and accordingly, you shall wholly devote your time to the Company’s business You
shall not, without express permission, undertake any other business, work, or public
office, on payment or otherwise. In the event of breach of this condition on your part,
you will be liable for termination of your services with immediate effect.
6.3 You shall not give out to anyone in any manner whatsoever, particulars, or any details
of any of the matters pertaining to the Company or its working, or any other
confidential information. In the event of breach of this condition on your part, you
will be liable for termination of your services with immediate-effect.
6.4 You will be bound by the rules and regulations as declared by the Management
hereafter, from time to time, in relation to conduct, discipline, medical fitness, leave,
holidays and all matters relating to terms and conditions of service
You shall be covered under Employees Provident Fund and ESI from the date of joining
as per the rules of the Company.
On confirmation, your service can be terminated by either side by giving one month’s
notice or payment of one month’s basic in lieu thereof. If you remain absent for more
than 08 days without sufficient cause then your service will be terminated without giving
any notice.
9.0 RETIREMENT
9.1 You will retire from the services of the Company on your attaining the age of 58
years, or
earlier if found medically unfit
9.2 For determination of age, the details in the documents that are furnished by you, at
the time
of joining, will be deemed to be final and binding.
Your appointment and continuation in employment will be subject to your being certified
medically fit by the Company’s medical consultants, from time to time, if deemed
necessary.
Your appointment will be subject to your being found suitable after security/reference
check, if the company feels necessary.
We welcome you to our Organisation, and look forward to having a mutually beneficial
association
Please sign the duplicate copy of this letter in token of your acceptance of the terms and
conditions of services stated herein.
Yours Sincerely,
For CAMPARI Accepted
( Signature )
( Auth. Signatory) Mrs. Suman Devi
Cc : Branch / Accounts Deptt./ HRD Deptt.
Attendance Sheet
Salary Sheet
Pay Slip
Bonus Sheet
All Workers Social Benefits
To,
Sub-: Resignation
Respected Sir,
Yours Faithfully
Kumar
Card No. D0605
PPM
All Type Test Report
sauJaava poTI Kaolanao sambanQaI
p`ikyaa
1. sauJaava poTI p`%yaok saPtah
saaomavaar 14:30 pr KaolaI jaayaogaI .
2. kma-caairyaaoM Wara idyao gayao
sauJaava kaima-k AiQakarI ko samaxa
p`stut ikyao jaayaogaoM.
3. kima-k AiQakarI ]na saBaI sauJaavaaoM
/ iSakayatao ka Avalaaokna krnao ko
pScaat sauJaavaaoM / iSakayatao kao
rijasTr mao dja- krayaogao .
4. ]pyau@t sauJaavaaoM / iSakayatao pr
ivacaar ivama-Sa va inairxaNa krnao ko
pScaat ]icat kaya-vaahI yaqaasaMmava
kI jaayaogaI .
5. gaaopnaIya iSakayat kao pUNa-t: gauPt
hI rKa jaayaogaa.
kRto kmparI
e@sapao-T p`a0 ila0
REFERANCE
www.camparitrendz.com
http://www.textiletoday.com.bd/
http://www.esic.in/ESICInsurance1/ESICInsurancePortal/PortalLogin.aspx
https://unifiedportal-emp.epfindia.gov.in/epfo/
https://labour.gov.in/labour-welfare/
www.google.com