950 Ph 3/9F T2 Legato Some wooden finish metal has scratches Open
GC Wooden cage lights and some of the end part is missing Interia/AK
1080 GC Ph 3/8F T2 Savills Passage infront of AHU 2 Stains on lms tile in front of AHU room Dimensions/AK/Vayucon/BMS/Solas Open
1871 GC Ph 4/10F T2 Savills Sprinkler tile edge rectification Dimensions/AK/Vayucon/BMS/Solas Open
1872 GC Ph 4/10F T2 Savills Finish around speaker in ceiling tile Dimensions/AK/Vayucon/BMS/Solas Open
1879 GC Ph 4/10F T2 Savills 10A Sachin Tendulkar Socket labeling AK Open
Holes above race way in ceiling
1881 Ph 4/10F T2 Savills Open
GC outside the room Interia/AK
1885 GC Ph 4/10F T2 Savills 1no of light not working AK Open
1886 GC Ph 4/10F T2 Savills Cabin next to 10A Eletrical socket termination AK Open
1889 GC Ph 4/10F T2 Savills Grid alignment need to be done Dimensions/AK/Vayucon/BMS/Solas Open
End cap to be fixed for the conduit out
1893 Ph 4/10F T2 Savills At Water point Open
GC side cabin AK/Triton/Solas
1897 GC Ph 4/10F T2 Savills Blue collab Socket labeling to be done AK Open
1899 GC Ph 4/10F T2 Savills Speaker tile need To be replaced Dimensions/AK/Vayucon/BMS/Solas Open
10B Micheal felps
1902 GC Ph 4/10F T2 Savills 1no light fixture Missing AK Open
1910 GC Ph 4/10F T2 Savills Socket labeling need to be done AK Open
10C Pele
1911 GC Ph 4/10F T2 Savills Grid alignment need to be done Dimensions/AK/Vayucon/BMS/Solas Open
1921 GC Ph 4/10F T2 Savills Stains on speaker tile to be cleaned Dimensions/AK/Vayucon/BMS/Solas Open
Power termination and socket fixing at
1922 Ph 4/10F T2 Savills Open
GC the table AK
Cabin next to 10C Occupancy sensor tile damage need to
1925 Ph 4/10F T2 Savills Open
GC be rectified Dimensions/AK/Vayucon/BMS/Solas
1927 GC Ph 4/10F T2 Savills Socket labeling need to be done AK Open
1929 GC Ph 4/10F T2 Savills Raw power socket to be aligned Ak Open
1939 GC Ph 4/10F T2 Savills Socket labeling to be done AK Open
1940 GC Ph 4/10F T2 Savills Occupancy sensor tile damaged Dimensions/AK/Vayucon/BMS/Solas Open
10E Mohammad Ali
Raw power face plate installation to be
1943 Ph 4/10F T2 Savills Open
GC done AK
1949 GC Ph 4/10F T2 Savills Light fixture in baffles to be aligned AK Open
Reception
1953 GC Ph 4/10F T2 Savills 1no round light fixture not working AK Open
2025 GC Ph 4/10F T2 Legato 10TB - A003 Light not working AK Open
2027 GC Ph 4/10F T2 Legato 10TB - A053 Light not working AK Open
2029 GC Ph 4/10F T2 Legato 10TB - A057 Light not working AK Open