JOB RISK ASSESSMENT - FRON
1 of ……
Date JOB
6/19/2019
Tanggal PEKERJAAN
Installation / Site CPU - TRF
Instalasi / Lapangan
Buillding maintenance at CPU and
Assessed Overall Risk
Penilaian Resiko Keseluruhan RISK Level 3
Notes
Task Assessment / Safety Critical Tasks:
1. Excavation and backfilling 7. Remove and install roof gutter and ceiling
(Penggalian dan penimbunan kembali) (Pemasangan dan pembongkaran atap,talang dan pla
2. Drive Ulin Pile 8. Painting works
(Pemancangan kayu ulin) (Pengecatan)
3. Carpentry works 9. Plumbing works
(Pekerjaan Pertukangan kayu) (Pekerjaan Pipa)
4. Masonry works
(Pekerjaan Tukang Batu)
5. Hot Works
(Pekerjaan Panas)
6. Demolition works
(Pekerjaan Pembobokan)

Tools / Equipment used for the Job:


1. Hand Tool
2. Peralatan kerja
Drilling Machine, Mesin Bor, Mesin Katam, Circular Saw, Marble Saw, Mesin Grinda, Jig Saw, Planner Machine,
Fanders Machine, Routers Machine, Extention Cable, Portable HandRiill, Heat Gun, Jack Hammer
3. Ladder
Tangga

Others information:
◎. Use and wear proper PPE in proper way ( Pergunan alat pelindung diri dengan benar )
◎. Use Cold / Hot Work Permit , and follow work permit procedure ( Pergunakan izin kerja yang sesua
◎. Perform safety talk, pre job meeting, last minute risk assessment, and maintain good communicati
( Lakukan persiapan yang meliputi : Pengarahan keamanan,persiapan kerja, penilaian resiko pam
◎. Working on live electricity the use of non Ex equipment and on hazardous area must be started and followed with conti
on surrounding working area by using portable gas detector
( Pekerjaan pada peralatan yang bertegangan dan penggunaan alat yang tidak bersertifikasi khusus harus diiringi denga

SITE VISIT/MEETING PER


Date 20-Jun-19
Tanggal
Main Concerns :

Assessment Performed by / Penilaian Resik


Position Signature Position
Safety man Supervisor
Name : Name :
Rocky E Sigit/Ridwan
Date : Date :
6/19/2019 6/19/2019

Reviewed by / Diperiksa oleh


Position Signature Position

Name : Name :

Date : Date :

Approved by / Disetujui oleh


Position Signature Position

Name : Name :

Date : Date :
ASSESSMENT - FRONT SHEET
JOB System
PEKERJAAN

Ref. No
ding maintenance at CPU and TRF
Reassessment Required ? Yes / No *)

Notes

d install roof gutter and ceiling


an dan pembongkaran atap,talang dan plafond)

Jig Saw, Planner Machine,

ng diri dengan benar )


( Pergunakan izin kerja yang sesuai)
t, and maintain good communication.
rsiapan kerja, penilaian resiko pamungkas , dan komunikasi yang baik )
a must be started and followed with continuous checking the LEL

k bersertifikasi khusus harus diiringi dengan pengetesan gas secara kontinu )

ISIT/MEETING PERFORM
Duration
Durasi
ormed by / Penilaian Resiko dilakukan oleh :
Signature Position Signature
service manager
Name :
Nala Y.
Date :
6/19/2019

eviewed by / Diperiksa oleh :


Signature Position Signature

Name :

Date :

pproved by / Disetujui oleh :


Signature Position Signature

Name :

Date :
PAGE INSTALLATION CPU - TRF SYSTEM -- REF. -- LEADER

ATTENDEES SITE VISIT #REF! DATE Err:504 DURATION Err:504

JOB DESCRIPTION

REVIEW SHEET
REVIEWER
COMMENTS UPDATED DOC.
NO. NAME ENTITY SIGNATURE DATE
Production < 2K boe ≥ 2K boe ≥ 20K boe ≥ 200K boe ≥ 1M boe ≥10M boe
Shortfall

International press +
Local rumour or no media Regional press + regional TV International press +
Media Reaction consequence
Local rumour / regional press
national rumour
National press + national TV
international TV
international TV for prolonged
period

Material Loss < 20K € ≥ 20K € ≥ 200K € ≥ 2M € ≥10M € ≥100M €

Risk Classifications & Definitions from DIR


SEC 08 & 02 Pollution having massive and
Environment Minor spill with no Minor pollution with a very Moderate pollution with limited Pollution having significant
Large-scale pollution of
durable consequences for vast
Impact *1) ecosystems having a
environmental impact limited environmental impact environmental consequences environmental consequences ecosystems having a high
recognized ecological value
ecological value

Single lost-time injury (LTI) Internal: 1 Fatality &/or several


Personnel Safety First aid or medical treatment Single lost-time injury (LTI)
with disability or multiple lost- disabilities
Internal: >1 Fatalities Internal: >5 fatalities
or restricted work days with no disability Public: 1 Fatalities Public: >2 Fatalities
time injuries Public: Disabilities

Severity of Consequence
Production Shortfall Personnel Safety, Environment Impact, Material Loss
Minor Moderate Serious Very Serious Catastrophic Disastrous
(or Gain) & Media Reaction
1 2 3 4 5 6

Incident almost inevitable


Very Likely
under current conditions (or for Expected to occur several times during plant
gain) Certain fully successful lifetime > 10-1
6 6 12 18 24 30 36
modification outcome

Ri
Incident probable with
sk
additional factors (or for gain)
Could occur several times during over plant Likely
5 5 10 15 20 25 Le 30
Probability / Likelihood of Occurrence

High likelihood of fully

ve
lifetime 10-1 - 10-2
successful modification
outcome
Ri l
sk 1
Incident possible with
additional factors (or for gain) Could occur once for every 10 to 20 similar Unlikely
4 4 8 12 Le 16 20 24
Some uncertainty of successful plants over 20 to 30 years of plant lifetime
modification outcome
10-2 - 10-3
ve
l2
Ri
Combination of rare factors One time per year for at least 1000 units. One
required to cause an incident time for every 100 to 200 similar plants in the
Very Unlikely
3
sk 6 9 12 15 18
3
Le
(or for gain) High uncertainty of world over 20 to 30 years of plant lifetime.
successful modification Has already occurred in the company but 10-3 - 10-4
outcome corrective action has been taken

ve
l 3
Has already occurred in the industry but
Extremely Unlikely
Freak combination of factors
required to cause an incident
corrective action
has been taken 10-4 - 10-5
2 2 4 6 8 10 12

Event physically possible but has never or


Remote
No similar incident in industry
seldom occurred over a period of 20 à 30
years for a large amount of sites (> few < 10-5
1 1 2 3 4 5 6
thousands, ex: wagons, process drums,…)

*1) for more detail on environment definitions, refer to Guidence for Environment Classification Risk Level 1 First priority, risk level to be obligatory reduce to level 2 or 3
(MHK-COMP-RUL-EP-HSE 0102) Major Consequence
Risk Level 2 Tolerable risk level if demonstrated to be ALARP

Risk Level 3 Broadly acceptable risk level


Severe Consequence
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Hazard 1: Pergelangan terkena benda tajam/ tertusuk, tergores./ Leg Hit by Sharp object
Human Consequence 4 5 20 4 3
Personnel injury To reduce probability
Good Communication & Coordination Untuk menurunkan probabilitas

- Conducting safety talk before working activity


x
- Melakukan safety talk sebelum melakukan pekerjaan

- Supervisor standby on call


x
- Supervisor siaga bila di perlukan

- Only person in charge working on excavation area


x
- Hanya orang kerja yang berada area penggalian

To reduce severity
Untuk menurunkan tingkat kerusakan
- Wear proper PPE
x
- Untuk menurunkan tingkat kerusakan
Hazard 2 : Damage existing cable and fresh water pipe line (Jalur Kabel dan jalur pipa air rusak)
Material consequences (Akibat terhadap peralatan) 4 4 16 4 2
Damage existing cable
To reduce probability
Untuk menurunkan probabilitas
Soil excavation and backfilling by manual
1 ( Penggalian dan penimbunan tanah secara
manual ) - Provide excavation permit and drawing under ground cable layout
x
- Ijin kerja penggalian dan denah gambar kabel bawah tanah tersedia

- Conducting safety talk before working activity


x
- Melakukan safety talk sebelum melakukan pekerjaan

- Supervisor standby on call


x
- Supervisor siaga bila di perlukan

- Good Communication means


x
- Komunikasi yang baik dan berarti
- Identify the existing cables and fresh water pipe line and install marker
- Kenali jalur kabel dan pipa air yang telah ada dan pasang tanda
x

- Perform survey to identify any cable before excavation


- Lakukan penelitian untuk mengenali kabel sebelum penggalian x
Soil excavation and backfilling by manual
1 ( Penggalian dan penimbunan tanah secara
manual )

PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence - Perform survey to identifyRisk
anyReduction Measures
cable before excavation
S P R - Lakukan penelitian untuk mengenali kabel sebelum penggalian S P
x

- Ask assistance from CPU/MNT/ELC for the identification


- Tanyakan kepada CPU/MNT/ELC untuk bantuan identifikasi x

To reduce severity
Untuk menurunkan tingkat kerusakan
- Use shovel
- Gunakan Sekop x

High First priority, risk level to be obligatory reduce to level 2 or 3 Medium Tolerable risk level if demonstrated to be ALARP Low
LEADER

DURATION

DESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

12

PT.BJM

PT.BJM
LEADER

DURATION

DESCRIPTION
PT.BJM

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

Low Broadly acceptable risk level


PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Hazard 1: Lost Control pilling hammer ( Palu untuk Pemancangan hilang kendali )
Human Consequence 3 4 12 2 3
Fatality To reduce probability
Personnel Injury Untuk menurunkan probabilitas

No Personal or Harming Area - Only competent personnel around


- Hanya personil yang kompeten di sekitar x
No Personel Holding Pilling

- Standby / Check supervisor / foreman


- Siaga / Pemriksaan supervisi / Mandor x

To reduce severity
Untuk menurunkan tingkat kerusakan

- Wear proper PPE


- Selalu menggunakan APD yang sesuai x

Hazard 2 : Damage existing underground facilities ( Electrical,telephone & instrument cables, fire & fresh water pipeline ) Kerusakan fasilitas bawah tanah ( Jalur elektrikal
Material consequences (Akibat terhadap peralatan) 4 4 16 3 3
Demage existing underground facilities
To reduce probability
Untuk menurunkan probabilitas

- Provide excavation permit and drawing under ground cable layout


- Sediakan ijin penggalian dan gambar layout kabel bawah tanah x
Manual Driving Wooden Ulin Pile
2 ( Pemancangan kayu ulin secara - Identify the existing cables and fresh water pipe line and install marker
manual ) - Kenali jalur kabel dan pipa air yang telah ada dan pasang tanda x

- Good Communication means


- Komunikasi yang baik dan berarti x

- Perform survey to identify any cable before excavation


- Lakukan penelitian untuk mengenali kabel sebelum penggalian x

- Identify the existing cables and fresh water pipe line and install marker
- Kenali jalur kabel dan pipa air yang telah ada dan pasang tanda x
Demage existing underground facilities

PAGE INSTALLATION -- SYSTEM -- REF. --

Manual Driving Wooden Ulin Pile


ATTENDEES SITE VISIT Yes / No *) DATE
2 ( Pemancangan kayu ulin secara
manual )
JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
- Identify the existing cables and fresh water pipe line and install marker
- Kenali jalur kabel dan pipa air yang telah ada dan pasang tanda x

- Ask assistance from CPU/MNT/ELC for the identification


- Tanyakan kepada CPU/MNT/ELC untuk bantuan identifikasi x

- Use updating drawing


- Gunakan gambar terbaru x

To reduce severity
Untuk menurunkan tingkat kerusakan
- Always proper PPE
- Selalu menggunakan APD yang tepat x

- Use proper standart tools


- Menggunakan peralatan standar sesuai dengan kegunaanya x

High First priority, risk level to be obligatory reduce to level 2 or 3 Medium Tolerable risk level if demonstrated to be ALARP Low

Kepala Lapangan / RSES S&E Authority Operating Authority


LEADER

DURATION

DESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

PT.BJM

fire & fresh water pipeline ) Kerusakan fasilitas bawah tanah ( Jalur elektrikal,telepon,& kabel instrumen,Pipa Api& air )
9

PT.BJM
LEADER

DURATION

DESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R
PT.BJM

Low Broadly acceptable risk level

Perfoming Authority
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Hazard 1: Sharp object ( Benda tajam ) / Tertusuk, tergores.
Human Consequence 4 5 20 2 4
Personnel Injury
To reduce probability
Untuk menurunkan probabilitas

- Safety talk regularly


X
- Pembicaraan safety secara reguler

- Supervisor standby on call


X
- Supervisor siaga bila di perlukan
To reduce severity
Untuk menurunkan tingkat kerusakan
- Wear proper PPE
X
- Selalu menggunakan APD yang sesuai
- House keeping
X
- Perapihan dan pembenahan
Hazard 2 : Moving Part ( Bagian yang bergerak )
Material consequences (Akibat terhadap peralatan) 4 4 16 2 3
Equiptment Inspected
To reduce probability
Personnel injury Untuk menurunkan probabilitas
Only Performed by Competent Personel - Ensure that all hot/ moving partis fully covered
- Pastikan semua hal yang panas / bergerak terlindungi secara X
penuh
- Competence mechanic to guard the machines
X
- Kompeten mekanik untuk menjaga mesin tersebut
- Use grinding disk with RPM higer than RPM machine
X
- Gunakan grinding disk dengan RPM lebih tinggi dari mesin RPM
- Handtools equiped with deadman switch
X
- Peralatan dilengkapi dengan tombol switch

Fabrication and install wooden works To reduce severity


(Plank,Frame and Joist) using electrical Untuk menurunkan tingkat kerusakan
drill, grinding and wood brush machine
3 [Pekerjaan Fabrikasi dan pemasangan
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Fabrication and install Initial Risk Residual Risk


No. Task wooden works Hazard; Risk & Consequence To reduce severity Risk Reduction Measures
(Plank,Frame and Joist) using electrical S P R Untuk menurunkan tingkat kerusakan S P
drill, grinding and wood brush machine
3 [Pekerjaan Fabrikasi dan pemasangan
kayu (Papan,Bingkai,Balok silang) - Wear proper PPE
X
menggunakan bor elektrik, mesin - Selalu menggunakan APD yang sesuai
gerindan dan mesin amplas kayu]
Hazard 3 : Tersengat Aliran Listrik / Electric Shock
Human Consequence 5 5 25 5 3
Personnel injury To reduce probability
Untuk menurunkan probabilitas/kemungkinan

- All electrical panel shall be protected by ELCB


X
- Semua panel elektrik harus di lindungi dengan ELCB
- All electrical power tools must be in good condition and inspected
by MNT/ELC
- Semua alat bertenaga listrik dalam kondisi yang bagus dan lolos X
inspeksi oleh MNT/ELC
- Put joint cable to high place
X
- Letakkan sambungan kabel di tempat yang tinggi

To reduce severity
Untuk menurunkan tingkat kerusakan

- Always proper PPE


X
- Selalu menggunakan APD yang tepat
Hazard 4 : Perapihan dan pembersihan yang kurang / Lack of House keeping
Human Consequence 3 5 15 To reduce probability 2 4
Personnel injury Untuk menurunkan probabilitas/kemungkinan

- Proper storage and house keeping


X
- Penyimpanan yang tepat dan pembersihan

- Barricade the working area


X
- Barikade area pekerjaan

To reduce severity
Untuk menurunkan tingkat kerusakan
PAGE INSTALLATION -- SYSTEM -- REF. --

Personnel injury
ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
- Always proper PPE
x
- Selalu menggunakan APD yang tepat
LEADER

DURATION

DESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

PT.BJM

PT.BJM
LEADER

DURATION

DESCRIPTION PT.BJM

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

15

PT.BJM

PT.BJM
LEADER

DURATION

DESCRIPTION

PT.BJM

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Hazard 1: Material spark / cement dust Percikan bahan / debu semen

Human Consequence 3 4 12 3 3
Respiratory Injury To reduce probability
Personnel Injury Untuk menurunkan probabilitas

- Good cooperation between personnel during process


- Kerjasama yang baik antara personil selama proses x

- Safety talk regularly


- Pembicaraan safety secara reguler x

- Supervisor standby on call


- Supervisor siaga bila di perlukan x

To reduce severity
Untuk menurunkan tingkat kerusakan

- Always proper PPE ( Dust mask and googles )


- Selalu menggunakan APD yang tepat ( Masker debu dan kaca mata) x

Hazard 2 : Falling of part being removed, sharp object Kejatuhan benda saat bekerja, benda tajam
Human Consequence 4 5 20 2 5
Hand & Finger Injury
To reduce probability
Personnel injury Untuk menurunkan probabilitas

Instal Baricade
- No body is under working area
- Tidak ada orang di bawah area kerja x

- Supervisor standby on call


- Supervisor siaga bila di perlukan x

Masonry works (install, repair, - Safety talk regularly


x
replace, pouring concrete, - Pembicaraan safety secara reguler

4 Ceramic) Pekerjaan Tukang


Batu
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Masonry works (install, repair, Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
replace, pouring concrete, S P R S P
4 Ceramic) Pekerjaan Tukang To reduce severity
Batu Untuk menurunkan tingkat kerusakan
(Pasang,perbaiki,pengecoran
,keramik) - Always proper PPE ( Dust mask and googles )
- Selalu menggunakan APD yang tepat ( Masker debu dan kaca mata) x

Hazard 3 : Dust contamination rubbish Terkontaminasi kotoran debu


Human Consequence 4 3 12 2 2
Personnel injury To reduce probability
Respiratory Injury Untuk menurunkan probabilitas/kemungkinan

- Ensure fresh air circulation


- Pastikan sirkulasi udara bersih x

To reduce severity
Untuk menurunkan tingkat kerusakan

- Always proper PPE ( Dust mask and googles )


- Selalu menggunakan APD yang tepat ( Masker debu dan kaca mata) x
Hazard 3 : Lack of House keeping Perapihan dan pembersihan yang kurang

Human Consequence 3 3 9 2 2

To reduce probability
Untuk menurunkan probabilitas/kemungkinan

- Good house keeping from waste materials


- Lakukan dengan baik perapihan dan pembersihan dari sampah material x

- Good supervision and communication means


- Pengawasan dan komunikasi yang baik x

- barricade the working area


- Barikade area pekerjaan x
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
To reduce severity
Untuk menurunkan tingkat kerusakan

- Always proper PPE ( Dust mask and googles )


- Selalu menggunakan APD yang tepat ( Masker debu dan kaca mata) x
Hazard 4 : Existing utility/ fatilitas yang ada
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

PT.BJM

10

PT.BJM
LEADER

DURATION

ESCRIPTION

PT.BJM
Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

PT.BJM

4
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Hazard 1: Electric shock / Tersengat listrik

Human Consequence/konsekuensi terhadap manusia 4 5 20 4 3


Fatality To reduce probability
Personnel Injury Untuk menurunkan probabilitas

- No electrical cables shall be under water


- tidak ada kabel elektrik yg berada di bawah air
x

- All electrical panel shall be protected by ELCB


- Semua panel elektrik harus di lindungi dengan ELCB x

- Ensure refer to specification guidelines of fabrication


- Pastikan merujuk pada panduan spesifikasi dari pabrik x

- All electrical power tools must be in good condition and inspected by


MNT/ELC/Semua alat bertenaga listrik dalam kondisi yang bagus dan lolos x
inspeksi oleh MNT/ELC

- Put joint cable to high place


- Letakkan sambungan kabel di tempat yang tinggi x

To reduce severity
Untuk menurunkan tingkat kerusakan

- Wear proper PPE (electrical hand gloves & full face shield helmet)
x
- Selalu menggunakan APD yang sesuai/lengkap
Hazard 2 : Grinding disk burst/ Mata gerinda pecah meledak
Human Consequence/konsekuensi terhadap manusia 4 4 16 4 2
Personnel injury
To reduce probability
Untuk menurunkan probabilitas

- RPM Grinding disk shall be heigher than RPM grinding machine


- RPM Mata gerinda harus lebih tinggi dari RPM mesin gerinda x
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
- All workers have to use the proper PPE
- Semua pekerja menggunakan APD yang tepat x
Hot Work(Grinding, Drilling &
- Supervisor on site
Cutting( - Supervisor di lokasi kerja x
5 Pekerjaan Panas
(Penggrindaan, Pengeboran - No body arround grinding area
x
- Tidak ada orang di sekitar area pengerindaan
& Pemotongan)
To reduce severity
Untuk menurunkan tingkat kerusakan

- Wear proper PPE (electrical hand gloves & full face shield helmet)
- Selalu menggunakan APD yang tepat / lengkap x

Hazard 3 : smoke fire, Dust contamination rubbish / asap, api ,Terkontaminasi kotoran debu
Human Consequence 4 4 16 2 3
Skin burns injury To reduce probability
personel injury Untuk menurunkan probabilitas/kemungkinan

Respiratory injury - Non flammable material on working area


- Tidak ada material yang mudah terbakar pada area kerja x

- Good supervision and communication means


- Pengawasan dan komunikasi yang baik x

To reduce severity
Untuk menurunkan tingkat kerusakan

-Provide fire extinguisher


-Tabung pemadam api tersedia x

- Always proper PPE ( Dust mask and googles,hand gloves )


-Selalu menggunakan APD yang tepat/ lengkap x
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Hazard 4 : Material Consequence

Human Consequence 3 4 12 2 4
damage/ future on the nearest smoke detector or To reduce probability
gas detector Untuk menurunkan probabilitas/kemungkinan

-identifikasi pendeteksi asap atau pendeteksi gas pada area kerja


-indentification the smoke detector or gas detector in working area x

To reduce severity
Untuk menurunkan tingkat kerusakan

- bypass pendeteksi asap atau gas yang dapat terkena efek pada area krja. x
Hazard 5 : Perapihan dan pembersihan yang kurang / Lack of House keeping, Tersandung dan abstraksi personil / Tripping and abstraction personnel
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

12

PT.BJM

8
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

PT.BJM

PT.BJM
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

PT.BJM

bstraksi personil / Tripping and abstraction personnel


PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Hazard 1: Material handling and removal, abstaksi personil Falling object tripped obstruction to personnel / Penanganan dan pemindahan material, Benda jatuh Tersandun

Human Consequence/konsekuensi terhadap manusia 4 4 16 4 2


To reduce probability
Personnel Injury Untuk menurunkan probabilitas

All material & equipment must arrenged properly and safely / 'Semua
material dan peralatan harus di rencanakan secara tepat dan aman x

- to follow manual handling procedure


- 'Ikuti prosedur penanganan secara manual x

-install safety line arround work area


- 'Pasang garis keselamatan di sekitar area kerja x

- Good supervision and communication means / 'Pengawasan dan


komunikasi yang baik x

- to conduct safety talk regularly


- Melakukan pembicaraan safety secara reguler x

- Good house keeping


- 'Perapihan dan kebersihan yang baik x

To reduce severity
Untuk menurunkan tingkat kerusakan

- Wear proper PPE / Selalu menggunakan APD yang sesuai, (gunakan high
inpact glove untuk barang atau benda tajam) x

Hazard 2 : Terkontaminasi terhadap debu atau kotoran / contamination by dirt or dust


Human Consequence/konsekuensi terhadap manusia 4 3 12 2 3
Personnel injury
To reduce probability
Untuk menurunkan probabilitas
Dismantle existing fence,
concertina, wall and
6 concrete(Pembongkaran
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Dismantle existing fence,
concertina, wall and -To conduct safety talk about chemical hazard regularly
- Melakukan pembicaraan mengenai keselamatan bahaya kimia secara x
6 concrete(Pembongkaran reguler
pagar,Kawat duri,dinding dan
beton) Supervisor siaga bila di perlukan / Supervisor standby on call x

- Good house keeping


- 'Perapihan dan kebersihan yang baik x

-all personel involved within the job must peform last minute risk assesment
during the job / semua orang yang terlibat dalam pekerjaan selalu x
melakukan resiko penilaian akhir ketika bekerja.

To reduce severity
Untuk menurunkan tingkat kerusakan

-splash the material being dismantled with water to prevent dust /material yg
di bongkar dengan air untuk mencegah keluarnya debu. x

- Wear proper PPE ( hand gloves, dask mask & full face shield helmet)
/Selalu menggunakan APD yang tepat / lengkap.

Hazard 3 : lack of haousekeeping,stumble or obstructed by material /kurang menjaga kebersihan, Tersandung atau terhalang oleh material
Human Consequence 4 4 16 2 4
To reduce probability
personel injury Untuk menurunkan probabilitas/kemungkinan

- Good house keeping from waste materials


-Lakukan dengan baik perapihan dan pembersihan dari sampah material
x

- Good supervision and communication means


- Pengawasan dan komunikasi yang baik x

To reduce severity
Untuk menurunkan tingkat kerusakan
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R To reduce severity S P
Untuk menurunkan tingkat kerusakan

- Always proper PPE ( Dust mask and googles,hand gloves )


-Selalu menggunakan APD yang tepat/ lengkap x
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R
rsonnel / Penanganan dan pemindahan material, Benda jatuh Tersandung

PT.BJM

6 taja
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

PT.BJM

PT.BJM
LEADER

DURATION

ESCRIPTION

PT.BJM
Residual Risk
Action Party Target Date Last Minute Risk Assessment
R
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Hazard 1: Material handling and removal, abstaksi personil Falling object tripped obstruction to personnel / Penanganan dan pemindahan material, Benda jatuh Tersandun

Human Consequence/konsekuensi terhadap manusia 4 4 16 2 4


To reduce probability
Personnel Injury Untuk menurunkan probabilitas

All material & equipment must arrenged properly and safely / 'Semua
material dan peralatan harus di rencanakan secara tepat dan aman X

- to follow manual handling procedure


- 'Ikuti prosedur penanganan secara manual X

- Good supervision and communication means / 'Pengawasan dan


komunikasi yang baik X

- Good communication and coordination within personnel/technician involved


in this job /koordinasi dan komunikasi yang baik dalam tim yang terlibat X
dalam pekerjaan

- Only Hot Work Permit to perform this job


- Pergunakan ijin kerja panas. X

Supervisor siaga bila di perlukan / Supervisor standby on call X

-install safety line arround work area


-'Pasang garis keselamatan di sekitar area kerja X

- No personel under under working area


- tidak ada orang dibawah area kerja X

To reduce severity
Untuk menurunkan tingkat kerusakan

- Wear proper PPE / Selalu menggunakan APD yang sesuai, (gunakan high
inpact glove untuk barang atau benda tajam) X

Hazard 2 : Terkontaminasi terhadap debu atau kotoran / contamination by dirt or dust


PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Human Consequence/konsekuensi terhadap manusia 4 3 12 2 3
Respiratory Injury
To reduce probability
Untuk menurunkan probabilitas

-To conduct safety talk about chemical hazard regularly


Remove and install roof, - Melakukan pembicaraan mengenai keselamatan bahaya kimia secara X
reguler
gutter and ceiling
7 (Membongkar dan - Supervisor standby on call
- Supervisor siaga bila di perlukan X
memasang atap,talang dan
plafond) -all personel involved within the job must peform last minute risk assesment
during the job / semua orang yang terlibat dalam pekerjaan selalu X
melakukan resiko penilaian akhir ketika bekerja.

To reduce severity
Untuk menurunkan tingkat kerusakan

- Good house keeping from waste materials


-Lakukan dengan baik perapihan dan pembersihan dari sampah material x

- Wear proper PPE ( hand gloves, dask mask & full face shield helmet)
- Selalu menggunakan APD yang tepat / lengkap. x

Hazard 3 : Work at Heigh/ Bekerja diketinggian (Jatuh / Falling down)


Human Consequence 4 5 20 4 3
fatality To reduce probability
personel injury Untuk menurunkan probabilitas/kemungkinan

to conduct safety talk regularly/ 'Melakukan pembicaraan safety secara


reguler x

- Supervisor standby on call


- Supervisor siaga bila di perlukan x
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
- Good supervision and communication means
- Pengawasan dan komunikasi yang baik x

- memasang tali pengaman di atas atap dan mengikatnya di bagian yg kuat


dan aman. x
-
-all personel involved within the job must peform last minute risk assesment
during the job / semua orang yang terlibat dalam pekerjaan selalu x
melakukan resiko penilaian akhir ketika bekerja.

- Use proper ladder


- gunakan tangga yang tepat x

To reduce severity
Untuk menurunkan tingkat kerusakan

- Always proper PPE ( Dust mask and googles,hand gloves )


-Selalu menggunakan APD yang tepat/ lengkap x
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R
rsonnel / Penanganan dan pemindahan material, Benda jatuh Tersandung

PT.BJM
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R
6 taja

PT.BJM

12
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

PT.BJM
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Hazard 1: Chemical contamination by dust and chemical solution (paint vapo,paint, thinner or turpentine / terkontaminasi oleh debu dan larutan kimia (
4 4 16 2 4
Pernafasan dan Mata/ Respiratory and eyes Injury To reduce probability
Personnel Injury Untuk menurunkan probabilitas

- Ensure no hot work on the same area


- Pastikan tidak ada pekerjaan panas di area kerja yang sama X

- No smoking during painting or close to material storage/ Tidak merokok


saat pengecatan atau berada dekat dengan tempat penyimpanan material X

-To conduct safety talk about chemical hazard regularly


- ''Melakukan pembicaraan mengenai keselamatan bahaya kimia secara X
reguler

- Good supervision and communication means / 'Pengawasan dan


komunikasi yang baik X

- Good house keeping


- 'Perapihan dan kebersihan yang baik XX

To reduce severity
Untuk menurunkan tingkat kerusakan

- use mask during painting


- memakai masker selama pengecetan X

- Wear proper PPE / Selalu menggunakan APD yang sesuai. X

Hazard 2 : materials consequences/ konskuensi terhadap material


Human Consequence/konsekuensi terhadap manusia 3 4 12 2 3
damage or dirty on the nearest existing
To reduce probability
material or facillties Untuk menurunkan probabilitas
Painting of steel, wall, wood
-cover or temporarly remove the existing material or facillties on working
8 and zinc(Pengecatan area to the safe area. x
besi,tembok,kayu dan seng) - tutupi atau pindahkan sementara benda atau fasilitas ke tempat yg aman
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Painting of steel,
Task wall, wood Hazard; Risk & Consequence Risk Reduction Measures
8 and zinc(Pengecatan S P R -cover or temporarly remove the existing material or facillties on working S P
area to the safe area. x
besi,tembok,kayu dan seng) - tutupi atau pindahkan sementara benda atau fasilitas ke tempat yg aman

- identify the nearest fire extinguisher on working area


- 'identifikasi alat pemadam api yang terdekat pada area kerja x

- Good house keeping


- 'Perapihan dan kebersihan yang baik x

To reduce severity
Untuk menurunkan tingkat kerusakan

-in case of fire, extinguish it the with nearest fire extinguisher


- jika terjadi kebakaran, padamkan dengan alat pemadam api yang terdekat x
pada area kerja.

Hazard 3 : smoke, fire / asap,api, kebakaran/ terbakar


Human Consequence 4 5 20 2 5
To reduce probability
personel injury Untuk menurunkan probabilitas/kemungkinan

respiratory injury -No smoking during painting or close to material storage


- Tidak merokok saat pengecatan atau berada dekat dengan tempat x
penyimpanan material

- Ensure no hot work on the same area


- Pastikan tidak ada pekerjaan panas di area kerja yang sama x

- Good supervision and communication means


- Pengawasan dan komunikasi yang baik x

To reduce severity
Untuk menurunkan tingkat kerusakan

- Always proper PPE ( Dust mask and googles,hand gloves )


-Selalu menggunakan APD yang tepat/ lengkap x
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R
er or turpentine / terkontaminasi oleh debu dan larutan kimia (uap cat, cat ,thinner/pengencer cat)
8

PT.BJM

6 taja
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R

PT.BJM

10

PT.BJM
PAGE INSTALLATION -- SYSTEM -- REF. --

ATTENDEES SITE VISIT Yes / No *) DATE

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
Hazard 1: Material handling & removal, wet surface,slippery floor, sharp objects, Tripping,access obstructed or blocked/ penanganan & pemindahan material, basah,licin, b

Human Consequence/konsekuensi terhadap manusia 4 4 16 2 4


To reduce probability
Personnel Injury Untuk menurunkan probabilitas

-conduct safety talk & pre job meeting regularly


- pengarahan k3 & rapat persiapan kerja secara reguler x

-install safety line arround work area x


- 'Pasang garis keselamatan di sekitar area kerja

- Good supervision and communication means / 'Pengawasan dan


komunikasi yang baik x

- Good house keeping


- 'Perapihan dan kebersihan yang baik x

To reduce severity
Untuk menurunkan tingkat kerusakan

- Wear proper PPE / Selalu menggunakan APD yang sesuai, (gunakan high
Install, replace , repair inpact glove untuk barang atau benda tajam) x
sanitaries and fresh water
9. pipe line.(Pasang Hazard 2 : lack of poor of housekeeping at working area / kurangnya pembersihan dan perapihan pada area
kerja
,mengganti,memperbaiki jalur
Human Consequence/konsekuensi terhadap manusia 3 4 12 2 3
pipa air bersih dan sanitasi)
Personnel injury
To reduce probability
Kontaminasi pencemaran lingkungan / Untuk menurunkan probabilitas

Defile environment contaminated


- Good house keeping from waste materials
- Lakukan dengan baik perapihan dan pembersihan dari sampah x
material

- Good supervision and communication means x


- Pengawasan dan komunikasi yang baik
Install, replace , repair
PAGE sanitaries and-- fresh water
INSTALLATION SYSTEM -- REF. --
9. pipe line.(Pasang
,mengganti,memperbaiki
ATTENDEES jalur SITE VISIT Yes / No *) DATE
pipa air bersih dan sanitasi)

JOB DESCRIPTION

Initial Risk Residual Risk


No. Task Hazard; Risk & Consequence Risk Reduction Measures
S P R S P
To reduce severity
Untuk menurunkan tingkat kerusakan

-all personel involved within the job must peform last minute risk assesment
during the job / semua orang yang terlibat dalam pekerjaan selalu x
melakukan resiko penilaian akhir ketika bekerja.

- Wear proper PPE ( hand gloves, dask mask & full face shield helmet)
x
- Selalu menggunakan APD yang tepat / lengkap.
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R
structed or blocked/ penanganan & pemindahan material, basah,licin, benda tajam, tersandung menghalangi akses

PT.BJM

6 taja

PT.BJM
LEADER

DURATION

ESCRIPTION

Residual Risk
Action Party Target Date Last Minute Risk Assessment
R