: NPT2/PRD/WI/01
WORK INSTRUCTION FOR HANDLING ABNORMAL SITUATIONS Rev. No.: 0
Date: 2/7/2010
Last part on machine Incomplete Operation/ Continuous Non Scratches, Crack, Unreliable results because
Impact on Product Incomplete Operation reinspect Product damage conformance Damage of Gauge/ Instrument error
Impact-Process M/C stopped M/C stopped Process left incomplete Process Inconsistancy - - -- --
Check for process Lift the part and Handover the Gauges /
Put off the main switch Put off the main switch Stop the process parameters as per SOP, clean it for dust, dirt Instrument to QA LAB for
Inform shift Supervisor calibration
Reaction Plan
Quarantine the part Take calibrated gauge /
previously produced till we instrument from QA
get consistency
Break-down Initimation
Update the Down time in report to be filled -up along Perform the First Piece - - -
production daily report Approval
with actions taken
Record
Rejection / Rework Qty in daily Rejection / Rework Qty in Update the daily report Update the daily report & Update the daily Update the gauge history
report & NC register daily report & NC register & NC register NC register report & NC register card