Activity Predecessor(s)
A: Manuscript proofreading by editor None
B: Sample pages preparation None
C: Book cover design None
D: Artwork preparation None
E: Author's approval of edited manuscript and sample pages A,B
F: Book formating E
G: Author's review of formatted pages F
H: Author's review of artwork D
I: Production of printed plates G,H
J. Book production and binding C,I

A
E

Start B

Activity Immediate Predecessors


1. Walls and Ceiling 2
2. Foundation None
3. Roof timbers 1
4. Roof Sheating 3
5. Electrical Wiring 1
6. Roof Shingles 4
7. Exterior Siding 8
8. Windows 1
9. Paint 6,7,10
10. Inside Wall board 8,5

Start 2 1
Duration (weeks)
3
2
4
3
2
4
2
1
2
4

F G

17 days
H I
16 days
J Finish
10 days
8 days
C

Expected Time (Days)


5
3
2
3
4
8
5
2
2
3

3 4 6
23 days
17 days
15 days
Finish
8 7 9

17 days

5 10
Finish
Finish

Potrebbero piacerti anche