Sei sulla pagina 1di 20

ONE SMART Engineering

GEOTECHNICAL CIVIL STRUCTURAL INFRASTRUCTURE

SINGAPORE MALAYSIA
www.onesmart.com.sg

COMPANY LEADERSHIP

ADVISORS

Er. Prof. Yong Kwet Yew Ir. Dr. Ooi Teik Aun
• Professor of Civil Engineering • Accredited Checker, Arbitrator,
• Vice-President, National University of Expert Witness, Chartered Engineer (UK)
Singapore • Professional Engineer (Malaysia),
• Board and Exco Member, Land Transport APEC Engineer
Authority, Singapore • International Professional Engineer
• Chairman, International Panel of Advisers, • President of Southeast Asian
Land Transport Authority, Singapore Geotechnical Society
• Past Chairman, Association of • Immediate Past Chairman of
Geotechnical Societies in Southeast Asia Association of Geotechnical Societies in
• Fellow, Institution of Engineers, Singapore Southeast Asia
• Chairman of IEM Tunnelling and
Underground Space Technical Division
2002-2003 and 2006-2009

MANAGEMENT

Ir. Er. Dr. Ong Chee Wee, Victor Er. Ng Chew Chiat, David
Managing Director Executive Director
• B.Eng. (Hons) Civil, M.Sc. (Civil), • B.Eng. (Hons) Civil, M.Eng. (Geotech)
PhD (Geotech) • PE (Civil), PE (Geo), QECP (Singapore)
• PE (Civil), PE (Geo), QECP (Singapore) • ASEAN Chartered Prof. Eng.
• PE (Civil) (Malaysia) • SPRING Civil & Geotechnical Works
• ASEAN Chartered Prof. Eng. TC Member
• APEC Eng, Int. PE. • Deputy Chairman of IES Civil &
• ISSMGE TC207 Soil-Structure Interaction Structural (Geotechnical Division) TC
and Retaining Wall • BCA Multi-Agency Task Force on Pile
• ISSMGE TC212 Deep Foundation Load Test Guidelines
• SPRING Civil & Geotechnical Works • Co-Convenor for IES & SPRING WG on
TC Member Bidirectional Load Test Guidelines

Ir. Lai Weng Keat Er. Lin Wen Jun, Vincent


Executive Director Technical Director
• B.Eng. (Hons) Civil • Dip. Civil & Struct Eng, B.Eng (Hons)
• PE (Civil) (Malaysia) Civil, M.Eng (Civil)
• Member of Institution of Engineers, • PE (Civil) (Singapore), C.Eng (UK)
Malaysia (IEM) • Chartered Member of Institute of
Structural Engineers (MIStructE)

02
www.onesmart.com.sg

COMPANY LEADERSHIP

COMPANY PROFESSIONAL TEAM

Dr. Shen Rui Fu Chin Yow Uui Ang Ming Huei


Senior Consultant Senior Principal Associate
(Modelling Speciallist) Engineer (Technical Leader)
• B.Eng. (Hons), M.Eng. (ECM Leader) • B.Eng. (Hons) Civil
(Geotech), PhD (Geotech) • B.Eng. (Hons) Civil, M.Sc. • M.Sc.
• Gold Award by Singapore (Geotech) Candidate (Civil - Speciallization
Accreditation Council • IES/ACES Registered RE Geotech)
(SAC) 2012 • ECMO, ECO •​ IEM TUSTD Committee
• Lecturer for the 'Plaxis Member
Advanced Course
on Computational
Geotechnics'

Ng Pin Yuan Er. Sun Jinhui Tan Kok Chin


Principal Engineer Principal Engineer Principal Engineer
• B.Eng. (Hons) Civil, M. • PE (Civil) Singapore • B.Eng. (Hons) Civil
Sc. (Civil) • B.Eng. (Hons) Civil
• IES/ACES Accredited • M.Eng. (Geotech)
Resident Engineer

Choong Ngee How Kee Zi Xiu Lee Chee Kien


Senior Engineer Senior Executive Executive Engineer
• B.Eng. (Hons) Civil Engineer • M.Eng. (Civil) 1st Class
• B.Eng. (Hons) Civil Hons (UK)
• IES/ACES Accredited •​ IEM TUSTD
Resident Engineer Committee Member

Lee Jun Lim, Ong Chun Shan, Lee Long Guang


Steven David Executive Engineer
Executive Engineer Executive Engineer • B. Eng (1st Class Hons)
• B.Eng. (Civil) Hons • M.Eng. (Civil) 1 Class
st
• IES/ACES Registered RE
Hons (UK) •​ GMICE, MIES, ECMO,
•​ IEM TUSTD Committee ECO
Member •​ IES Geo Div TC Member

Phakorn Kiong Tang Mun Yan Chua Yee Ching


Executive Engineer Engineer Engineer
• B.Eng. (Civil) 1st Class • B.Eng. (Tech) Hons • B.Eng. (Civil) Hons
Hons (UM)

03
www.onesmart.com.sg

AWARDS

Singapore’s Outstanding Enterprise 2016

Top 100 Singapore Excellence Award 2015 Aspiring


Category

ISO 9001:2008 for Provision of Engineering


Consultancy for Geotechnical, Civil and Structural
Engineering

Safety Certificate Level 1 - bizSAFE Level 1 Workshop


for Company CEO/Top Management

Safety Certificate Level 2 – Competency for


MF-COM-402-1 Develop A risk Management
Implementation Plan

PEB License – License to Supply Professional


Engineering Services as per Professional Engineers
Act (Chapter 253) by Professional Engineers Board,
Singapore

BEM License – Registered Company with Board of


Engineers, Malaysia

MOF License – Registered Vendor with Ministry of


Finance, Malaysia

Panel of Consultants for the Provision of Professional


Engineering Services

Top 50 Engineering
FEATS @ IES-SG50

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

04
www.onesmart.com.sg

UNDERGROUND SPACE CONSTRUCTION


(TUNNELING AND DEEP EXCAVATION)

Singapore Thomson Line Contract


T203 – Construction of Woodlands
MRT Station and Cut and Cover
Tunnels for Thomson Line
-Qualified Person (Geotechnical) (Design)

Singapore Thomson Line Contract


T213 – Construction of Caldecott MRT
Station and Tunnels for Thomson Line
-Qualified Person (Geotechnical) (Design)

Singapore Thomson Line Contract


T219 – Construction of Orchard MRT
Station
-Qualified Person (Geotechnical) (Design)

Singapore Thomson Line Contract


T220 – Construction of Great World
Station and Its Associated Tunnels
-Qualified Person (Civil and Geotechnical)
(Supervision)

Singapore Thomson Line Contract


T221 – Construction of Havelock MRT
Station
-Qualified Person (Civil and Geotechnical)
(Supervision)

Cross - Island and Jurong Island


Pioneer Cable Tunnels Contract NS2
-Qualified Person (Supervision) (Civil)
TOP 50 ENGINEERING FEATS @
IES-SG50 Award

Design and Supervision of MRT Tunnels

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

05
www.onesmart.com.sg

UNDERGROUND SPACE CONSTRUCTION


(TUNNELING AND DEEP EXCAVATION)

Strutting Design at MRT Station, Singapore

Project Mass Rapid Transit (MRT) Lembah Singapore Downtown Line 3 – Tai Seng Facility
Kelang Jajaran Sungai Buloh – Kajang, Building
Malaysia -Professional Engineer (Geotechnical) for LTA – Design,
Underground Works (Tunnels, Stations & Construction and Completion of Tai Seng Facility Building,
Associated Structures) Between Semantan responsible for the design and construction of the temporary
North Portal and Maluri South Portal (UG1) earth retaining structures and geotechnical aspects of the
-Contractor’s Independent Checking Engineer design and construction of the underground structure
(Accredited Checker) for Design of deep excavation
(for 3 MRT Stations), temporary earth retaining Singapore Downtown Line Stage 1 – Promenade
structures, tunnel-pile interaction MRT Station
-Qualified Person (Supervision) for the S$231 Million project
Singapore Downtown Line Stage 3 – consisting of station, shafts and bored tunnels
Bendemeer MRT Station
-Qualified Person (Supervision) for the S$215 Million Contract 8288 – Tanglin Halt Outlet Drain at North
project consisting of a station, shafts and bored Buona Vista
tunnels. Total of 4 Nos. of TBM were used to bore -Independent Checker for TERS-Mined Tunnel
through the tunnels with total length of 4.54 km -Impact assessment to adjacent Buona Vista MRT and
underground tunnel (CCL)
Singapore Downtown Line Stage 3 – 5
Stations and Associated Tunnels from Bedok Contract ER382 – New Road Between Macritchie
to Tampines Viaduct and Adam Flyover
-Qualified Person (Geotechnical) for the geotechnical -Qualified Person (Design) Geotechnical Services
design of the DTL3 5 stations and tunnels

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

06
www.onesmart.com.sg

UNDERGROUND SPACE CONSTRUCTION


(TUNNELING AND DEEP EXCAVATION)

Impact Analysis of Infrastructure within MRT Reserves:


-On Jalan Cochrane - Entrance Vehicular Ramp to MyTOWN
-On Jalan Cochrane - Pedestrian Tunnel between MyTOWN and MRT
-On Jalan Nakhoda Yusoff - MEX Highway Off-ramp

Proposed Upgrading Works for Lorong Kuda Junction and Tunneling at Persiaran KLCC and Lorong Kuda,
Kuala Lumpur City Centre, Wilayah Kuala Lumpur for KLCC (Holdings) Sdn. Bhd.
-Independent Checking Engineer (ICE) as Requirement for Proposed Development lnterfacing with Mass Rapid Transit (MRT)
Structures

Project Mass Rapid Transit 2 (MRT Line 2): Sungai Buloh- Serdang - Putrajaya (SSP)
Underground Works Package: Design, Construction and Completion of Tunnels, Stations & Associated
Structures from Jalan lpoh North Escape Shaft to Desa Waterpark South Portal
-CICE/Accredited Checker for Ampang Park Station and KLCC East Station

Mumbai Metro Line 3 Design & Construction of Underground MRT Stations at Marol Naka, MIDC & SEEPZ
& Associated Tunnels, India
-Lead Design Checker

Deep Excavation at Thomson Line MRT Station, Singapore

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

07
www.onesmart.com.sg

SLOPE STABILISATION AND GROUND IMPROVEMENT WORKS

Soil Nailing at Singapore Thomson


Line Contract T213 – Construction
of Caldecott Station and Tunnels for
Thomson Line

Proposed Ground Improvement for


2 Blocks of 29-Storey Residential
Development at Jalan Ayer Jerneh,
Mukim Setapak, Kuala Lumpur, Malaysia

Proposed Soil Stabilization with Soil Nail


at Mount Faber II Service Reservoir

Soil Improvement Works for Total Lube Ground Improvement PVD at Setapak, Kuala Lumpur, Malaysia
Oil Blending Plant (LOBP) and Lube Park
Shared Facility Feed 2 (LPSF)

Ground Improvement for Construction


and Management of Staging Ground
and Infilling Works at Tekong

Ground Improvement for Proposed


Reclamation at Jurong Island Westward
Extension

Slope Stabilization with Soil Nail at Mount Faber, Singapore

Soil Improvement Works at Punggol East Contract 35


& 39B

Proposed Design and Reclamation at Ayer Chawan


Phase 2, Jurong Island

Soil Compaction at Jurong Westward Extension, Land Preparation Works for Airport Development
Singapore

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

08
www.onesmart.com.sg

SLOPE STABILISATION AND GROUND IMPROVEMENT WORKS

Construction of TEMASEK Club New Clubhouse at Rifle Range Road


-QP (Design) (Civil) and QP (Design) (Geo) For The Slope Strengthening Behind CBP Wall

Sky Arena Phase 2 - Proposed Residential Development of 580 Units of Condominium on (Parcel 2) Lot
17899, Jalan Ayer Jerneh, Mukim Setapak, Kuala Lumpur
-Geothechnical & Ground Improvement Consultancy Services

Ground Improvement for Construction and Management of Staging Ground and Infilling Works at Pulau
Tekong
-QP (Design) (Geo) for the Deep Compaction Works

Ground Improvement for Proposed Reclamation at Jurong Island Westward Extension


-QP (Design) (Civil) for the Deep Compaction Works, Road Reserve Compaction Works, and Top Compaction Works

Ground Improvement for Tuas Terminal Phase 1 Reclamation, Wharf Construction and Dredging
-QP (Design) (Civil) for the Deep Compaction Works

Ground Improvement for Tuas Terminal Phase 1 Reclamation, Singapore

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

09
www.onesmart.com.sg

INFRASTRUCTURE WORKS

Floating PV Test-Bed at Tengah Reservoir Improvement to Alexandra Canal Subsidiary Drain


-Planning, Prelimenary Design, Tender Design and “F” (Between Tiong Bahru Road and Havelock Road)
Construction Stage Supervision for Public Utility -Qualified Person (Civil and Geotechnical) for all temporary
Board (PUB) & Solar Energy Research Institute excavation works (ERSS / GBW), temporary sewer diversions,
Singapore alternative proposal to replace jack-in piles and culvert
crossing TSL tunnel to bored piles and alternative proposal to
Improvement to Tanglin Halt Outlet Drain change jack-in piles to soil replacement to all U-drains
Contract 3
-Qualified Person (Civil and Geotechnical) for all Improvement to Sungei Pandan Kechil (West Coast
temporary excavation works (ERSS / GBW) and Road to the Sea)
alternative design for the conversion of original -Qualified Person (Civil and Geotechnical) for design of
box drain to new scheme of box drain with temporary earth retaining structures and flood gate, and QECP
diaphragm wall services

World’s Largest
Floating Solar-cell Test Bed

Floating PV at Tengah Reservoir, Singapore

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

10
www.onesmart.com.sg

INFRASTRUCTURE WORKS

Improvement to Bayshore Road Outlet Drain


-Design of temporary earth retaining structures, outfall
structure, and QECP services

Proposed Construction of Roads, Drains, Sewers,


Services Tunnels and Soil Improvement Works at
Meranti Avenue, Jurong Island (Phase 1)
-ERSS design and submission to authorities, and QECP services

Contract T2145: Sewer Diversion Works (Package D)


-Qualified Person for Earth Retaining Stabilizing Structure
Trench Shoring Modular System at Sungai Seletar,
(ERSS)
Singapore

Improvement to Bukit Timah Canal Near Maple


Sungai Seletar Bus Depot - Temporary
Avenue
Excavation Works for 6.5 m Wide Drain
-Design of temporary earth retaining structures, services steel
bridges and flood gate, and QECP services Using Shoring Modular System
-Design of temporary earth retaining structures
and QECP services for drainage works

Proposed Sewers in Bedok Reservoir and


Changi Business Park Areas
-Design of sewer pipe jacking, temporary caissons
and earth retaining structures

ER296 – Construction and Completion


of Sentosa Gateway Tunnel from Telok
Strutting for Construction of Bukit Timah Canal, Singapore
Blangah Road to Keppel Road / Kampong
Bahru Road / Lower Delta Road and
Associated Road Widening Work along
Lower Delta Road
-Qualified Person for Earth Retaining Stabilizing
Structure (ERSS)

Supply, Laying and Installation of


1 200 mm Diameter Potable Water Pipeline
along Woodleigh Lane and Proposed New
Upper Aljunied Road to Joo Seng Road
-Design of jacking/receiving shaft and earth
30 m Deep Caisson for Pipe Jacking Works retaining structures

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

11
www.onesmart.com.sg

HIGH RISE BUILDING AND FACADE

Yale-NUS College Campus, Singapore

Proposed Erection of Yale-NUS College Campus


Dover Road, Singapore
-Qualified Person for the Design and Submission to BCA
of High and Low Rise Windows, Lobby Curtain Wall, Roof
Cladding, Guardrail, Rain Screen, Trellis, Glass Canopy, Skylight, Condominium, Batu Permai, Malaysia Sky Awani 2
Horizontal and Vertical Trim, Staircase Curtain Wall, High Rise
Tower Staircase, Sky Garden Railing, and Staircase Metal Screen

Proposed Residential Development ( 580 Units )


Consists of Block A (29-Storey) 284 Units, Block
B (29-Storey) 296 Units, Setapak, Kuala Lumpur,
Malaysia
-Civil and Structural Consultancy Services

Proposed Residential Development ( 626 Units )


Consist of Block A, 26-Storey of 313 Units, Block B,
26-Storey of 313 Units, 2-Storey Shops of 15 Units,
5-Storey Carpark Podium and Facilities Batu Permai,
Kuala Lumpur, Malaysia
-Civil and Structural Consultancy Services

Proposed Condominium at Mile 3.5 Jalan Tuaran,


Likas, Kota Kinabalu, Sabah, Malaysia
-Civil and Structural Consultancy Services Condominium, Likas, Sabah Malaysia

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

12
www.onesmart.com.sg

HIGH RISE BUILDING AND FACADE

Proposed Mixed Development consist of Phase 1 - One Louis Vuitton @ ION Orchard at 2
Block of Service Apartment (35 - storey) 410 Units, Orchard Turn
Setapak, Kuala Lumpur, Malaysia. -Qualified Person for the Design and
Supervision for the Facade
Proposed Addition & Alteration Works to Tiffany & Co.
Retail Units at ION Orchard Development Proposed Public Housing
-Qualified Person for the Design and Supervision for the Facade Development Comprising 9 Blocks of
16-Storey Residential Building (Total:
Proposed Addition & Alteration Works to Dior Retail 928 Units)
Units at ION Orchard Development -Qualified Person for the Design and
-Qualified Person for the Design and Supervision for the Facade Submission to HDB and BCA for the Windows

Steel Structure for Facede Support at LV, Dior and Tiffany & Co. at ION Orchard, Singapore

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

13
www.onesmart.com.sg

HIGH RISE BUILDING AND FACADE

Proposed Public Housing Development (HDB) Comprising 1 Block of 17-Storey Residential Building (Total
232 Units) with Surface Carpark at Jurong West Street 41 (JWN4C21)
-Qualified Person for the Design and Submission to HDB and BCA for the Windows

Proposed Public Housing Development Comprising 3 Blocks of 26/28/30-Storey Residential Building


(Total: 808 Units), Boon Keng Road / Lorong 1 Geylang (Kallang Whampoa C23B)
-Qualified Person for the Design and Submission to HDB and BCA for the Windows

Proposed Public Housing Development Comprising of 1 Block of 6/19 Storey, 3 Blocks of 8/14/19-Storey,
1 Block of 14 / 19-Storey & 2 Blocks of 19-Storey Flats (Total: 837 Units) Edgedale Plains (PGEC36)
-Qualified Person for the Design and Submission to HDB and BCA for the Windows

Proposed Public Housing Development Comprising 7 Blks of 6/12/15/17/18-Storey Residential Building


(Total: 832 Units), (PGE C39 & CG)
-Qualified Person for the Design and Submission to HDB and BCA for the Windows

Sky Meridien, Kuala Lumpur

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

14
www.onesmart.com.sg

PERIODIC STRUCTURAL INSPECTION (PSI) FOR BUILDINGS

Periodic (Visual) Structural Inspection of Coastal Breeze Residences at 10


Loyang Besar Close, Singapore 509050

Periodic (Visual) Structural Inspection of Attitude@Kim Yam at 1 Kim Yam


Road, Singapore 239319

Periodic (Visual) Structural Inspection of Crescent@Kallang at 47 Kallang


Pudding Road, Singapore 349318

Periodic (Visual) Structural Inspection of Ivory Heights at Blks 117, 118, 119,
120, 121, 122, 123 and 124 Jurong East Street 13

PSI for Nouvo Condominium


Periodic (Visual) Structural Inspection at 15, 17, 19, 21, 23, 25, 27, 29, 31, 33,
35, 37, 39 and 41 Jalan Tepong Road, Jurong Food Hub, Singapore 619336

Periodic Structural Inspection (2nd Stage Investigation) of Mercedes-Benz


Center at 301 Alexandra Road, Singapore 159968

Second Stage PSI at 31 Alexandra Road Mercedes Benz Show room

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

15
www.onesmart.com.sg

QUALIFIED EROSION CONTROL PROFESSIONAL (QECP) SERVICES

Proposed New Erection of Public Housing Development at


Sengkang East Avenue (N2C40 and Neighbourhood Park) –
PUB Model Site

Proposed Public Housing Development Consists of 7 Blocks


of 16 Storey Residential Building (Total 606 Units), A Block of
Multi Storey Carpark, ESS, Precinct Pavilion with Community
Facilities on Lot 2199A PT MK 21 at Punggol Field/ Punggol
Place (Punggol West C8)
PUB ECM Model Site at HDB Sengkang
PUB Model Site
N2C40

Contract T210 – Design and Construction of Mayflower Station


for Thompson Line Contract ER442 and ER443 –
Walk2Ride Programme ( 38 LRT
Contract T305 – Construction of Katong Park Station and Stations, 28 MRT Stations and 1
Tunnels for Thomson East Coast Line Bus Interchange )

Contract T310 – Construction of Bayshore Station and Tunnels Design and Build of Public Housing
for Thompson-East Coast Line Project A at Bukit Batok N4C16
& N4C17 (Total: 1,793 Dwelling
Contract C913 – Design and Construction of Station and Units)
Tunnels at Hillview and Cashew for Downtown Line Stage 2
Construction and Management
Contract ER449A – Viaduct from TPE to PIE (Westbound) and of Staging Ground and Infilling
Upper Changi Road East Works (Phase 2)

PUB ECM Model Site at Punggol Sails- Punggol Water Treatment Plant with Sedimentation Sump
West C8 (PUB ECM Model Site at Punggol Sails- Punggol West C8)

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

16
www.onesmart.com.sg

SPECIAL STRUCTURES

Improvement to Rochor Canal from Jalan


Besar to Crawford Street
-Qualified Person for the Design and Submission to
BCA for the Wave Roof, Tensile Membrane Footings,
Glass Railing, Glass Panel on Pergola, Formwork and
Falsework, and Pile Eccentricity

Improvement To Changi Airport Diversion


Drain – Outlet Drain 2 (Between Changi Coast
Road And Changi Airport Diversion Drain)
-Qualified Person for the Design and Submission to
BCA for the Floating Pontoon

Proposed Upgrading of Nanyang Primary Wave Roof at Rochor Canal, Singapore


School Campus
-Qualified Person for the Design and Submission to
BCA for the Retractable Seats

Design and Construction of Temporary Bridge and Tidal


Gate at Sungei Pandan Kechil
-Qualified Person for the Design and Submission to BCA/PUB for the
Temporary Vehicular Bridge, Pedestrian Bridge and Tidal Gate
Tidal Gate at Sungei Pandan Kechil, Singapore

Tidal Gate at Changi Airport Drain Diversion, Singapore

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

17
www.onesmart.com.sg

GEOTECHNICAL SPECIALIST IN 3D MODELLING

Geotechnical problems nowadays are becoming more


complicated which plain strain models would not
be sufficient. Three-dimensional modelling of the
geotechnical problems is necessary in these types of
situation to provide a more cost- effective design and
a more realistic prediction of the ground and structure
movement. We have the capability and expertise in
the highly specialized skills of carrying out three-
dimensional modelling for the complex geotechnical
problems.
Impact of Excavation to Nearby MRT Viaduct
and Existing Box Culvert

3D Model for Underground MRT Structure Tunnel Pipe Interaction with Pile Construction

Impact Analysis to Existing DTSS Shaft & Tunnels

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

18
www.onesmart.com.sg

GEOTECHNICAL SPECIALIST IN 3D MODELLING

Impact of crane/lorry loading on MRT station ERSS system Impact analysis due to shafts excavation and pipe jacking

Tunnel Impact Assessment To Waive Debonding of Piles Mumbai Metro Line-3 launching Middle shaft with
2 ring beams and 3 rows of 4 m inclined rock bolts

3D Modelling on Proposed Deep Foundation System Slope Enhancement by Using Soil Nails

Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.

19
is composed of
diligent professional engineers and
CONSULTANCY SERVIC
doctorates who are dedicated in offering R ES
our clients the advantage of the state-of-the- OU
art design and presence. Our staff are motivated
by continuous training to enhance and develop
their knowledge and capability in providing the
best quality service. We are well established and SPECIALIST GEOTECHNICAL ENGINEERING DESIGN
connected to university academics, professional • Deep Excavation / Basement Excavation Design
and specialist services in various aspects • Earth Retaining & Stabilizing Structure (ERSS)
of civil, structural and geotechnical • Independent Checking Engineer for MRT Interface
engineering to provide one-stop • Geotechnical Building Work (GBW) Design
integrated services to value • Shallow & Deep Foundation Element Design
O -add to our clients. • Ground Anchor and Soil Nail Design
UR • Slope Analyses & Ground Improvement
RE • Tunneling & Pipe Jacking Design
SO
URCE
S CIVIL & STRUCTURAL ENGINEERING DESIGN
• High Rise Building Design
• Curtain Wall, Cladding, Skylight, Façade, Canopy and Railing
has been • Building / Factory / Additions & Alteration Design
established to provide consultancy & • Viaduct Structure and Underground Structure
engineering services in Civil, Structural • Qualified Erosion Control Professional (QECP)
• Design of Water, Drainage and Sewer
and Geotechnical Engineering.
• Periodic Structural Inspection
We are committed to provide economical • Road Opening Application (ROA)
and robust engineering designs and OUR MI
solutions to the industry. SS
IO
We acquired knowledge and capability

N
in the areas of structural, drainage, sewerage,
water services, earthworks, high rise buildings, will
foundation and geotechnical engineering. focus on the strength of the
company to provide one-stop
We ensure that our engineering solutions are conceptualized and specialist engineering
and executed by a team of dedicated professionals. consultancy services to its
clients and commit to develop
We strive to deliver our services within approved cost-budgets, its staff’s professional
schedule and quality standard. capabilities.

We have offices in Singapore and Malaysia and the company of


top professionals in the industry in this region.

ABOUT

MALAYSIA SINGAPORE
ONE SMART Engineering Sdn Bhd ONE SMART Engineering Pte Ltd
F-5-06 & F-5-07, Block F, Neo Damansara, 21 Bukit Batok Crescent,
No.1 Jalan PJU 8/1, #06-75 & #06-76 WCEGA Tower,
Damansara Perdana, Singapore 658065
47820 Petaling Jaya Tel: +65-62656766
Tel: +603-7732 8970 Fax: +65-62817151
Fax: +603-7732 9870 Email: admin@onesmart.com.sg
Email: admin@onesmart.com.sg

Potrebbero piacerti anche