0 valutazioniIl 0% ha trovato utile questo documento (0 voti)
50 visualizzazioni2 pagine
Siddharth Verma is a 28-year-old civil engineer with over 6 years of experience in project management and design. He has a Bachelor's degree in civil engineering and has worked on infrastructure projects in India, Norway, Denmark, and Uganda. Some of his responsibilities have included managing project teams, coordinating with clients, preparing designs and drawings, and ensuring quality standards are met. He has received several achievements including promotions, appreciation letters, and high performance ratings from clients.
Siddharth Verma is a 28-year-old civil engineer with over 6 years of experience in project management and design. He has a Bachelor's degree in civil engineering and has worked on infrastructure projects in India, Norway, Denmark, and Uganda. Some of his responsibilities have included managing project teams, coordinating with clients, preparing designs and drawings, and ensuring quality standards are met. He has received several achievements including promotions, appreciation letters, and high performance ratings from clients.
Siddharth Verma is a 28-year-old civil engineer with over 6 years of experience in project management and design. He has a Bachelor's degree in civil engineering and has worked on infrastructure projects in India, Norway, Denmark, and Uganda. Some of his responsibilities have included managing project teams, coordinating with clients, preparing designs and drawings, and ensuring quality standards are met. He has received several achievements including promotions, appreciation letters, and high performance ratings from clients.
Fast track Promotion | Project Management |International Stint | School Topper, Best Student Educational Qualifications B. Tech | Civil 2014 Delhi Technological University , Delhi 7.4/10 Class XII | CBSE 2009 S.S.L.T Gujarat Sr. Sec. School, Delhi 9.22/10 (1/104) Class X | CBSE 2007 Sant Nirankari Public School, Delhi 9.21/10 (Rank 4) Professional Experience 58 Months COWI CONSULTANT / ENGINEER 4 Nov’15 – May’19 Selected out of 100 from India office to work on live projects in Norway & Denmark offices for 6 months Acted as an ambassador to company’s Norway and Denmark office to bring more projects to India office Spoke with the Regional Vice President of company about high performance work culture of India office Remodeled road of a cloud based major European motorway project by addition of 20+ critical elements Orchestrated the amount of work & man hours with Director to be sent to India from 1.8 B NOK project Repaired 100+ cad drawings in collaboration with Denmark office for a major oil road project in Uganda Coordinated & communicated with national and international clients for 20+ projects worth 7 Billion USD Performed 2D & 3D geometric & pavement design using innovation & prioritization to save 1000+ hours Produced 1000+ cad drawings & models for 200+ roads keeping client understanding & satisfaction at core Responsibilities Spearheaded and managed 6 different teams for 6 projects which included allocation of resources and time Brainstormed with seniors to implement UK, US, IRC, Dubai, Africa, Norway standards in various projects Enriched client experience by providing Business Interface Modeling & 3D rendered videos backed by data Collaborated with 10 different teams from different departments for diagnosing & troubleshooting issues Initiated training & development of colleagues, new recruits & interns through knowledge sharing sessions Ascertained 3 levels of check of 1000+ drawings to ensure QMS: ISO 9001:2015 conformed quality service Calculated the quantities of road signs, markings & safety equipment for 500+ roads as per safety standards Performed sight distance & safety analysis of 100+ junctions to better their safety, aesthetic & ride comfort Predicted the no. of resources & hours utilizing Critical Path Method to increase efficiency & productivity Appointed as an acting project manager of Mumbai Trans Harbor Link worth 2.6 Billion US dollars in 2019 Coordinated with the client and team about the issues and problems and provided most feasible solutions Earned rating of 9 out of 10 from the national & international client for timely & quality project submission Completed design of 180+ roads, 200+ drawings preparation & other client deliverables as Lead Engineer Managed and coordinated a team of 8 people; including time and resources planning, and tasks distribution Received the certificate of “Reward and Recognition” for exemplary performance and timely submissions First employee to get promoted to position of Engineer level 4 from level 2 with only 4 years of experience Obtained a rating of 9 out of 10 from clients for outstanding deliverables on directly coordinated projects 3 team of 6 as acting Project Manager for a major expressway project in Mumbai worth 2.6 Billion USD Led Appointed as Manager to lead team of 4 for a major Wind-farm road project in Denmark worth 1 M DKK Achievements Received letter of appreciation from national & international clients for quality & timely delivery of projects Optimization of the resources & hours allocation leading to increased efficiency & saving of 20,000 DKK Analyzed & processed .XML & .TXT data to successfully regenerate 3D model of a major Swedish project Optimized the design and utilized the waste soil as a fill material in the embankments to save 1,00,000 SEK CH2M HILL HIGHWAY ENGINEER 1 Jul’14 – Nov’15 Engineered 2D & 3D design of 1 expressway, 5 roundabouts, 80+ junctions and 500+ urban & rural roads Multiplied the road modeling speed and efficiency 8x by learning and applying software command language Optimized the process from design to output stage by planning time & resources for reducing project cost solution two different teams of 6 on roll employees and 6 on contract employees for boosting efficiency Synergized Responsibilities optimaloptimalop Prepared advancedaesthetic design Excel sheet options. the quantities of pavement, earthwork & road safety equipment to calculate Fostered oneness in team irrespective of place and background they come from to utilize their full potential Prepared non –traditional client presentation using 3D visualization images & videos, and actual design data Debugged & documented 100+ issues related to design software & its command language implementation Only employee out of 100 to be Rewarded and recognized from Sharjah office for exemplary performance Recommended by Sharjah client for Geometric design of 230 roads in 3 other areas of Sharjah Municipality Achievements Appointed to lead the team of 5+ with only 6 months of experience on national and international projects Optimized the design to reduce number of road construction affected houses to 15 from 300 in Sharjah Completed the detailed design, drawings preparation & quantities calculation of 80+ roads in only 30 days Positions of Responsibility Vice President - Public Elected as the Vice President - Public Relations of the club by 20 permanent members of the club in 2019 Relations,Toastmasters Created a positive awareness of the club in the society to increase no. of permanent members in the club
FACULTY OF MANAGEMENT STUDIES, UNIVERSITY OF DELHI
(Master of Business Administration) International Prepared posters & launched various social media campaigns of all club events using social media channels Organized social service events using toastmasters as a platform to perform the CSR responsibility of club Sergeant at Arms, Responsible for starting club meetings, preparing the stage, arranging facilities for 30+ members and guests Toastmasters Performed admin & logistic duties of club including procurement of certificates, banner, stationary & snack International Responsible for maintaining the club culture & decorum before, during and after the conclusion of meeting Group Leader, 1/15 out of 60 selected as a group leader for a team of four to carry out the final year major project in 2012 DTU Responsible for assigning the task, site visit, lab visit & data collection & preparation of detail design report Head Boy, Elected as the Head-boy of the school in Class X out of 1200 students to represent students of the school Sant Nirankari Public Acted as liaison between 1200 students and 20 faculty members & addressed to their needs and concerns School, 2006 Introduced & successfully established the rule of using the Zero period for extra and co-curricular activities Organized 5 cultural events & 20+ team outings in & out of office which involved managing 100+ people Organizer, CH2m Hill Performed logistic duties for events which include procurement of certificate, banner, stationary and snacks Projects Mumbai Trans Harbor Link, India Led the Engineering team of 2 & cad team of 3, and coordinated with other departments Received a client rating of 9 out of 10 for successful managing & coordinating the project Windfarm Project, Jutland, Denmark Roads & COWI Successfully completed the detailed design and requisite drawings of 80+ Junction roads Infrastructure Received a client rating of 9 out of 10 for quality and timely delivery of the final drawings European Road 22, Sweden Regenerated the entire 3d model of 80 roads using only x, y & z coordinates in 8 days Saved 1 lakh+ Swedish Krone by optimal utilization of the waste soil from the earthwork Internal Roads, Dibba Al Hisn, Sharjah Completed detailed design and Bill of quantities of 180 roads in record time of 40 days Recommended by the Sharjah client for Geometric design of 230 roads in 3 other areas Gujarat International Finance Tec-city, India Roads & CH2M HILL Designed Rotary & vehicular underpass with resolution of more than 20 conflict points Infrastructure Learnt and implemented road software command language for 8x faster & safe design Doha Expressway, Qatar Modeled 1.5km stretch of road and 15 junctions which are part of 2022 FIFA World Cup Swept path analysis of the junctions to ensure safety and comfortability during the ride Design of Septic Tanks D.T.U Proposed the construction of Septic tanks to reduce carbon footprint of the college Civil Design Designed the tank, managed team of 4 and developed an app to calculate the capacity Co-Curricular Achievements Topper of the School out of 104 students in class XII of S.S.L.T Gujarat Senior Secondary School in 2009 Academic the year Best 2009.of the year of school out of 1200 students in class X of Sant Nirankari Public School in 2007 Student Achievements Qualified GATE in 2014 & 2019 with placed among the top 3.4% and top 6% respectively across country Only student out of 120 students to get the final project selected by the CBSE externals for review in 2009 Workshops/ Received Google Ad Fundamentals Certification from Google online training academy, Google in 2019 Certifications AutoCAD certified user certification from Autodesk for successfully completing course in 2 months, 2013 Extra-Curricular Achievements Received 1st prize among 1200 students in Art and Craft competition in Sant Nirankari Public School, 2006 Received 2nd position at state level Science Exhibition among 50+ entries selected from central level, 2006 Competitions/ Winner of the central level Science Exhibition among 50+ entries selected from zonal levels in Delhi, 2005 Events Winner of the Zonal level Science Competition among 50+ entries from different schools from Delhi, 2005 Honored with “best prepared speaker” award at Pro Orators Toastmasters club among 30 speakers in 2019 Received the best role player award at Toastmasters club for successfully running the club meeting in 2019 . Organized cleanliness Drive attracting 20 people at Tughalaqabad Fort in 2019 sponsored by Toastmasters 2/15 of 225 while representing school in zonal level Kho-Kho competition at Dhaka School in Delhi, 2005 Sports/Cultural 1/10 of 1200 while representing school in Independence day Celebration at Chatrasal stadium, Delhi, 2004 2/15 of 150 while representing school in zonal level Volley Ball competition at Dhaka School, Delhi, 2005 Commended by Chief Minister of Delhi for outstanding performance in Republic Day parade in 2006 Interests Public Speaking | Fitness | Cooking | Travelling