ITEM
DESCRIPTION QTY. UNIT
NO.
1 Demolition of Existing Beam and Column
2 Clearing and disposal of waste materials
3 Carpentry
a. 4'x8' Fiber cement Board 20 pcs
a. Double Metal Furring 75 pcs
a. Carrying Channel 35 pcs
a. Wall Angle 20 pcs
a. W-clip 150 pcs
a. Blind Rivets 4 boxes
a. Concret e Nails 2 kls
a. H-frame 10 pcs
4 Masonry
a. Retouch plastering 1 lot
b. Stone Slate/Cladding 8 boxes
5 Electrical Works
a. Lighting/Rough-ins 26 sets
b. Outlet/Rough-ins 8 sets
c. Transfer of Panel Board 1 lot
6 Painting Works
a. Ceiling 1 lot
e. Wall 1 lot
7 Bar Counter
a. Granite Slab 6 lm
b. 4'x8'x1/2" thk. Plyboard 5 pcs
c. Assorted Nails 3 kls
d. 2"x2"x20ft. Kilned Dried Lumber pcs lot
d. QDE 1 tin
Prepared by: