Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
90
3kh 210
3 260
remaining budget total expenses remaining budget
doors jam
(750) 15,000 14,712 288 6,000
90x210 5,800
80x210 5,400 3
yale 1 5,400
6,840 2,400
400
t wire 16 1,420
remaining budget total expenses remaining
380 hinger 6,000 5,759 241
50 % downpayment 70,000
mpw 1/4 total 24600-
cwn 1
1x1 wood
stikwel
2*6
budget total expenses remaining budget total expenses
15,000 14,710 290 flooring 70,000 69,903
10 mm 20 2,780
60 8,200 sand 10m3 7,000
2kg 120 gavel 12m3 12,600
55 pcs 1,650 cement 50 11,400
1 kg 180
10 mm 20
pvc 4 1
pvc 3 1
pvc 2 1
elbow 3x90 4
pvc tee reducer 1
pvc tee 4 1
pvc elbow 4x 90 3
clean out 1
p trap 3 1
solvent 1
sureseal 1
pretty door 60cm 1
toilet bowl and lavatory 1 set
pvc 2 1
pvc 3 1
pvc4 1
elbow 4 2
elbow 2 5
elbow 3x90 4
pvc 2 3
pvc 3 3
tee 3 3
pretty door 70
45
remaining budget
(74,785) 511,286 kitchen and pluming
tiles kitchen 20
sink 1
elbow 1 1/2 15
pluming water
555,000 elbow 2 90deh 10
pvc wye 3*2 6
elbow 2 45deg 3
vulcaseal 1
wye 2 1
flexible hose
43,714 wall faucet 2
angle valve 2
blind cap 9
84,775
total expenses remaining
15,146 (15,146)
4,240
4,800
195
3,500
310
630
108
150
70
116
552
360
115