UNITED ARCHITECTS OF THE PHILIPPINES UAP DOCUMENTS
OBJECTIVES: Sole power of interpreting the provisions of the code:
National Board of Directors of the United Architects of the Philippines Board of Professional
Regulation Commission
• To unite all registered architects in the Philippines.
• To uplift the standards of the architectural education, conduct 203 Specialized Allied Services
researchers, accumulate and disseminate information and ideas in
architecture, environmental design, ecology, technology, culture and 204 Construction Services
other related fields.
205 Post- Construction Services
• To cooperate and coordinate with other allied profession, trades and
industry.
206 Comprehensive Architectural Services
• To participate in matters concerning national development of the
country. 207 Design- Build Services
• To cooperate with the board of architecture and other government 208 Selection of Architects & Methods of
agencies. Compensation
2
ARCHITECT’S FEE
201 PRE-DESIGN SERVICES Group 1 SIMPLE ………………………………….. 6%
• Economic Feasibility Studies Group 2 MODERATE …………………………….. 7%
• Project Financing
• Architectural Programming Group 3 EXEPTIONAL …………………………… 8%
• Site Selection and Analysis
• Site Utilization and Land-Use Studies Group 4 RESIDENTIAL ………………………….. 10%
• Space Management Studies Group 5 MONUMENTAL ………………………… 12%
• Promotional Services
Group 6 REPITITIVE …………………80% 60% 40%
3
203 SPECIALIZED ALLIED SERVICES 205 POST CONSTRUCTION SERVICES
1. Physical Planning BUILDING & EQUIPMENT MAINTENANCE
2. Interior Design 12% - 20% • Maintenance of building systems and building equipments
with consultant 5%
BUILDING & GROUNDS ADMINISTRATION
3. Landscaping 10% - 15% • Billing of tenants
with consultant 5% • Monitoring of Security and Janitorial services
• Update of local ordinances and building regulations
4. Acoustics, Comm, Elec, Eng 10% - 15%
with consultant 5% POST-CONSTRUCTION EVALUATION
• Evaluate use of Facility
5. Comprehensive Planning • Determine effectiveness of building systems and materials
Physical • Functionality of the building plans
Economic
• Study of functionality and effectiveness of the design
Socio-Cultural
Transport
COMPENSATION
Legal & Administrative
• Salary Basis
• Percentage Method 4 – 6% of gross rentals
204 CONSTRUCTION SERVICES
FULL TIME SUPERVISION 206 COMPREHENSIVE ARCHITECTURAL SERVICES
• Percentage Method 1 – 1 1/2%
• MDPE (Multiple Direct Personnel Expense) • All services (UAP DOC 201-205)
• Equivalent to Project Manager
CONSTRUCTION MANAGER
• Percentage Method 1 - 1 1/2% COMPENSATION
• Percentage Method
• Compensation
PROJECT MANAGER
• Combination
• Percentage Method 2 - 5%
4
Performance Bond - 15 % of contract amount
207 DESIGN-BUILD SERVICES
Payment Bond - 15% of Contract amount
DESIGN BUILD SERVICES - Valid until replacement of Guarantee Bond
• Handling projects at the shortest time, at lowest cost with quality and performance
Guarantee Bond - 30% of contract amount
DESIGN BUILD SERVICES - Valid up to 1 yr from date of acceptance
BY ADMINISTRATION
• Project constructed under the direct and sole responsibility of the Architect After 65% completion of work, the contractor should present certificate of non
• 7% Fee as Compensation separate Architects Fee for regular design services
financial obligation
After 98% substantial completion of contract work, the architect shall inspect
the project & issue certificate of completion after certification, the
DESIGN BUILD SERVICES
contractor will finish outstanding work during period of making
ON A GUARANTEED MAXIMUM COST
good of all known defects of 60 days.
• Client given a guaranteed maximum cost for the construction of the project
• 10% Fee as Compensation separate Architects Fee for regular design services
SUSPENSION OF WORK
208-a SELECTION OF THE ARCHITECT
Contractor can suspend work:
DIRECT SELECTION 1. non- payment after 15 days request
• Clients Personal selection of architect 2. order of government to stop work for 90 days
Owner can suspend work:
COMPARATIVE SELECTION 1. bankruptcy- declared by BIR
• Clients choose between other architects for the best suited for the project 2. insubordination
3. non payment of contractors debt
DESIGN COMPETITION 4. non superintendence of contractor
• For monumental, civic, and prestigious private building projects
5
5 days
- immediately
7 days
- from receipt of NOTICE TO PROCEED
10 days
-notice to stop, resume before beginning or suspending, resuming
- request on drwn & matrls from date needed
15 days
- request for payment by contractor
- change of order
- certificate of payment by the architect
- for owner to pay the contractor from issuance of certificate of payment
- reqst of extension frm occurrence of delay
- notice of termination upon written notice
- contract sum & breakdown
30 days
- arbitration
- certificate of occupancy
60 days
- to make good of known defects after issuance of certificate of completion
(expiration of performance & payment bond)
90 days
- work stoppage ordered by the court
- retention (3 months after acceptance of work)
120 days
- building permit validity
365 days
- guarantee bond effectivity
- building permit validity if there was no Construction