Task Name Start

Godrej EWS Tower 3/20/2019

Erection 3/20/2019

Tower-1 3/20/2019

2nd Floor Slab 3/20/2019

3rd Floor Slab 4/9/2019

4th Floor Slab 4/26/2019

5th Floor Slab 5/11/2019

6th Floor Slab 5/26/2019

7th Floor Slab 6/7/2019

8th Floor Slab 7/11/2019

9th Floor Slab 7/29/2019

10th Floor Slab 8/14/2019

11th Floor Slab 8/30/2019

Parapet Wall 9/15/2019

Tower-2 A 4/13/2019

Stilt Floor Slab 4/13/2019

1st Floor Slab 7/17/2019

2nd Floor Slab 8/12/2019

3rd Floor Slab 9/26/2019

4th Floor Slab 10/15/2019

5th Floor Slab 10/31/2019


6th Floor Slab 11/14/2019

7th Floor Slab 11/28/2019

8th Floor Slab 12/12/2019

9th Floor Slab 12/26/2019

10th Floor Slab 1/10/2020

11th Floor Slab 1/24/2020

Parapet Wall 2/8/2020

Tower-2 B 6/29/2019

Tower crane installation 9/14/2019

Stilt Floor Slab 6/29/2019

1st Floor Slab 8/9/2019

2nd Floor Slab 8/31/2019

3rd Floor Slab 10/1/2019

4th Floor Slab 10/16/2019

5th Floor Slab 11/1/2019

6th Floor Slab 11/15/2019

7th Floor Slab 11/29/2019

8th Floor Slab 12/13/2019

9th Floor Slab 12/27/2019

10th Floor Slab 1/11/2020

11th Floor Slab 1/25/2020

Parapet Wall 2/8/2020


`
Finish Duration % Complete

2/12/2020 276 days 45%

2/12/2020 276 days 45%

9/20/2019 155 days 95%

4/8/2019 16 days 100%

4/25/2019 15 days 100%

5/10/2019 12 days 100%

5/25/2019 13 days 100%

6/6/2019 10 days 100%

7/10/2019 29 days 100%

7/27/2019 15 days 100%

8/14/2019 15 days 100%

8/29/2019 13 days 100%

9/14/2019 13 days 95%

9/20/2019 5 days 0%

2/12/2020 256 days 35%

5/2/2019 16 days 100%

8/10/2019 22 days 100%

9/25/2019 36 days 60%

10/14/2019 16 days 0%

10/30/2019 12 days 0%

11/13/2019 12 days 0%
11/27/2019 12 days 0%

12/11/2019 12 days 0%

12/25/2019 12 days 0%

1/9/2020 12 days 0%

1/23/2020 12 days 0%

2/7/2020 12 days 0%

2/12/2020 4 days 0%

2/12/2020 191 days 12%

10/18/2019 29 days 0%

7/15/2019 14 days 100%

8/30/2019 18 days 100%

9/30/2019 25 days 0%

10/15/2019 12 days 0%

10/31/2019 12 days 0%

11/14/2019 12 days 0%

11/28/2019 12 days 0%

12/12/2019 12 days 0%

12/26/2019 12 days 0%

1/10/2020 12 days 0%

1/24/2020 12 days 0%

2/7/2020 12 days 0%

2/12/2020 4 days 0%
Design & foundation levelling issues
Due to heavy rains/ Design Issues

Due to heavy rains/ Design Issues

Tower crane foundation & installation


Design & foundation levelling issues
Due to heavy rains/ Design Issues

Due to heavy rains/ Design Issues

Tower crane foundation & installation