QUESTIONNAIRE - I

Government of India
Power & Telecommunication Co-ordination Committee

(To be answered by the Authorities In-Charge of Power System while Applying for PTCC Route Approvals.)

1.0 Please supply data of the power system as per details below:

Key diagram (single line) of the electrical layout of the relevant


portions of the power system, indicating the number, voltage
Details submitted with Annexure-I,
1.1 ratings, capacities, etc. of the various power apparatus. Indicate
enclosed herewith
also by dotted lines the extension proposed ultimately or
through the current Five Year Plan.

Note: By relevant is meant all the power stations, which under normal operating conditions will feed into a
fault occurring within or outside the parallelism section as well as all lines on which such fault current
would flow.

Data on the characteristics of equipment, viz. generators,


transformers, reactors, synchronous condensers, earthing
Details submitted with Annexure-II,
1.2 transformers, etc. installed in the system as per enclosed
enclosed herewith
annexure (transient reactance figures should be given for all
rotating machines).

Please state if the neutral points of the power system are (i)
insulated, or (ii) earthed. If the latter, please indicate the type
1.3 of earthing, e.g. solidly earthed, earthed through Peterson coils,
eathed through resistance or reactance. Give also full
particulars.

2.0 Please supply the following data in respect of the particular power line for which approval is sought.

2.1 Name of proposed EHV line.

2.2 Operating voltage and number of circuits.


(i) Length.
(ii) Conductor & Earth wire size and material.

If it is a tap or spur or LILO line, the length of the tap/LILO point


2.4 and the distance of the tapping/LILO point from the end sub-
stations should be clearly indicated.

Is the power line bussed at any intermediate sub-stations? If so,


2.5
please give details.

2.6 Will the power line initially be charged at some lower voltage?

Page 1 of 10
2.7 Probable date of commencing the construction.

2.8 Probable date of commissioning.

2.9 Date by which approval is desired.

Please supply a route map showing the proposed alignment of the


power line and the paralleling telecommunications line in the area,
drawn to a scale of 1 cm= 0.5 kms. or 1" = 1 mile. All topographical
Route Map Enclosed
3.0 details including all railway lines, rivers, canals and important roads
Scale: ____________
up to 8 kms. on either side of the proposes power line may also be
drawn to the scale. The railway stations should be located on the
map and named.

If the proposed line is an extension of the existing line,


which had not been referred to the Committee previously a
Note1:
similar route map of the existing line, should also be
supplied along with the route map of proposed line.

A copy of the route map with telecom circuits marked be


also sent to local DOT authorities and Railway authorities,
Note2: requesting them to confirm the telecom circuit and also
indicate the points of discontinuity in the telecom circuits
to both the Joint Secretaries of the committee.

Number and date of the route map showing the proposed


3.1
alignment.

Sketch or sketches of supports showing the conductor and group


Details submitted with Annexure-III,
4.0 wire arrangements of the transmission line together with an
enclosed herewith
indication of the sizes and materials of the various wires.

Please indicate the protective device adopted for the line. In respect
of lines protected by circuit breakers, please furnish also the type of
5.0 the lines and relaying proposed and the total time (Breaker and
Relay) for clearance of ground faults on the line with normal relay
settings.

Please indicate the soil resistivity in the area covered by the line. The
soil resistivity should be measured by the four electrode method
Details submitted with Annexure-IV,
6.0 using an inter electrode spacing of 50 meters (150 feet). The
enclosed herewith
measurements may be made at every 2 or 3 kms .along the length of
the line.

Page 2 of 10
Please indicate the number of crossing between the proposed
alignment and the telecommunication lines involved and state if the
7.0 crossing arrangements will be provided in accordance with the code
of Practice for Crossings issued by the Power and
Telecommunication Co-ordination Committee.

8.0 EPR details of End substations-

8.1 Name of Substation

8.2 New/ Existing

Diagonal distance of earth mat


8.3
in meters

Maximum fault current of


8.4
Substation in Amps

8.5 Earthmat resistance in ohms

9.0 Main line particulars in the case of LILO/ tap line

Whether any Railway lines are existing within 8 kms. on either side Details submitted with Proforma-II,
9.1
of the power line: enclosed herewith

Details submitted with Annexure-V,


9.2 Shortest Distances between Telephone Exchanges & Substations.
enclosed herewith

9.3 Name of districts through which proposed power line passes.

While applying for route approval of the Committee, the above particulars should be furnished to :

Director (PTCC), Central Electricity Authority, Load Dispatch & Telecommunication Division, PTCC
i
Directorate, NREB Building, Shaheed Jeet Singh Marg, Katwaria Sarai, New Delhi 110016.

ii DET (PTCC) concerned.

Place: Signature:
Date: Name:
Designation:
Contact No.

Page 3 of 10
Annexure - I
Relevant Network Sketch for "Name of Proposed Power Line"

Signature :
Name :
Designation :

Page 4 of 10
Annexure - II
Equipment Details for "Name of Proposed Power Line"

1 Synchronous Machines (Generators, Synchronous Condensers)

Sr.No. Name of the Power Station or Sub-station Rating Transient Reactance


in MVA (Percentage Reactance at
its own Base)
1
2
3

2 Transformers

Sr.No. Name of the Power Station or Connections Voltage Rating Transient Reactance
Sub-station HV/LV Ratio in MVA (Percentage Reactance at
its own Base)
1
2
3

* The Neutral Grounding/Earthing may clearly be specified

3 Reactors

Sr.No. Name of the Power Station or Sub-station Rating Transient Reactance


in MVA (Percentage Reactance at
its own Base)
1
2
3

4 Earthing Transformers

Sr.No. Name of the Power Station or Current Rating Voltage Time Transient Reactance
Sub-station (Short Time) Rating (Percentage Reactance at
its own Base)
1
2
3

Signature :
Name :
Designation :

Page 5 of 10
Annexure - III
Tower Key Diagram for "Name of Proposed Power Line"

Signature :
Name :
Designation :

Page 6 of 10
Annexure - IV
Soil Resistivity Statement for " Name of Proposed Power Line "

Length in kms :
Method Adopted : Four Electrode Method
Formula : ρ=2ΠaR
Where, ρ = Soil Resistivity in Ohm-Meter.
R = Megger Reading in Ohms.
a = Distance Between Two Electrodes in meters.
Note: Inter Electrode Spacing Should be Kept 50 Meters

Megger Soil
Sr. Reading Resistivity
No. Distance from either end Location Name/No. (R) (ρ) Soil Type

Signature :
Name :
Designation :

Page 7 of 10
Annexure - V
Telephone Exchanges Details for " Name of Proposed Power Line "

Sr. Nearest Distance between


No. Name of Sub-Station Name of Telephone exchange Power Line & Sub-Station in

Signature :
Name :
Designation:

Page 8 of 10
Proforma-II
Railway Line Details for "Name of Proposed Power Line"

1 No. of Railway crossings :

2 Details of Railway line or station within 8


Kms. of power line, if any.
a. Name of Railway line :
b. Gauge :
c. Name of nearest Rly. station :
d. Minimum distances from the power :
line to Rly. station

3 Minimum distance between railway station


and power line in Kms. (Even if railway
line/station is beyond 8 Kms. the minimum
distance should be stated.)

a. Name of Railway line :


b. Gauge :
c. Name of nearest Rly. station :
d. Minimum distances from the power :
line to Rly. station

Signature :
Name :
Designation :

Page 9 of 10
EHV Line GPS Co-ordinates for "Name of Proposed Power Line"

From To Voltage Level Route Length Number of Type of Size of Type of Earth Number of Size of Earth
(Sub-station) (Sub-station) (kV) (kms) Ckts. Conductor Conductor Wire Earth Wire Wire

Tower No. / Tower Type & Latitude Longitude


Sr.No. Location No. Extension Degrees Minutes Seconds Degrees Minutes Seconds

Signature :
Name :
Designation :

Page 10 of 10