GOVT.

OF PUNJAB
DEPARTMENT OF WATER SUPPLY & SANITATION
WATER SUPPLY & SANITATION DIVISION KAPURTHALA

PRELIMINARY SCHEME REPORT (PSR)


FOR CONSTRUCTION OF INTERCEPTING TANKS/SEPTIC
TANKS IN ECONOMICALLY WEAKER HOUSEHOLDS
SEWERAGE SCHEME IN VILLAGES RAIPUR PEER
BUXWALA - BLOCK NADALA, TASHPUR - BLOCK
SULTANPUR LODHI, LAKHAN KALAN – BLOCK
KAPURTHALA, JAID – BLOCK KAPURTHALA, JABBO
SUDHAR - BLOCK SULTANPUR LODHI, BHAKHRIANA -
BLOCK PHAGWARA, DISTRICT KAPURTHALA.

Estimated Cost: Rs. 19.05 Lacs


Division : KAPURTHALA

(PROGRAMME UNDER RDF)


Check List

(To be appended with proposals for Administrative Approvals)

Name of the Work:- CONSTRUCTION OF INTERCEPTING TANKS SEPTIC TANKS IN 6


NOS. SEWERAGE SCHEME OF DIVISION KAPURTHALA DISTT
KAPURTHALA (UNDER WORLD BANK PROJECT)
`
Sr. No Issue/ Item Reply

1. Is the proposal covered under the Annual Action Plan 2013-14? No

Is the proposal covered in the budget for the year No


2. 2013-14?

Has the proposal been granted Administrative Approval


3. previously? if yes, give reasons for re-submission of the No
proposal

Does the proposal involve any revision of estimated costs? If


4. No
yes, give reasons therefore.

Are the estimates attached with the proposal prepared as per


5. Yes
CSR?

Is the proposal fully covered under the Codal provisions of the


6. Yes
Department?

7. Is the proposal fully covered under the guidelines of NRDWP ? No

Is the proposal fully covered under the guidelines of the World


8. Yes
Bank Project?

9. Is the proposal essential and desirable? Yes

10. Indicate tentative date of starting the work. 01.05.2014

11. Indicate tentative date of completion of work. 31.07.2014

12. Give name of the officer who prepared the estimates. Sh. Sanjay Arora Xen

Sh Sarbjit Singh Riar


13. Give name of the officer who checked the estimates.
SE.

Give name of the officer competent to accord technical approval


14. Sh. Sudhir Bhatia (CE)
of the Project.

Are you aware that the proposed work can be undertaken only
15. when requisite funds are released and technical approval of the Yes
proposal is granted by the Competent Authority.

Certified that the above information is correct to best of my knowledge.

Executive Engineer Superintending Engineer Chief Engineer (N)

WSS Division Kapurthala WSS Circle Jalandhar WSS Pb. Patiala


PRELIMINARY SCHEME REPORT (PSR) FOR CONSTRUCTION OF
INTERCEPTING TANKS / SEPTIC TANKS IN ECONOMICALLY WEAKER
HOUSEHOLDS ( SC, YELLOW CARD HOLDER, MARGINAL FARMERS,
HANDICAPPED AND WOMAN HEADED) TO ENABLE THEM TO TAKE BENEFIT
OF SEWERAGE SCHEMES AT VILLAGE RAIPUR PEER BUXWALA - BLOCK
NADALA, TASHPUR - BLOCK SULTANPUR LODHI, LAKHAN KALAN - BLOCK
KAPURTHALA, JAID – BLOCK KAPURTHALA, JABBO SUDHAR - BLOCK
SULTANPUR LODHI, BHAKHRIANA - BLOCK PHAGWARA, DISTRICT
KAPURTHALA. (Under RDF)

REPORT
Govt. of Punjab has launched the execution of Sewerage Schemes under Punjab
Rural Water Supply and Sanitation Programme with the objective of improving the
environmental condition with specific reference to water supply and sanitation in selected
villages within the State.

Providing Sewerage Schemes and Sewerage Treatment Plants is under construction


at Village RAIPUR PEER BAKSHWALA, TASHPUR, LAKHAN KALAN, JAID AND JABBO
SUDHAR, BHAKHRIANA in Kapurthala District by Department of Water Supply & Sanitation,
Punjab.

There are basically two parts of the proposed scheme 1) Sewerage network and
Sewage Treatment Plant (STP) 2) Household Connection. Three agencies GPWSC/SLC,
DWSS and Contractor are involved in completing and implementing the scheme. Contractor
has been engaged to complete sewerage network and STP under direct supervision of
GPWSC/SLC and DWSS. In parallel with construction work, GPWSC/SLC and DWSS will
supervise proper household connection work to be constructed by house owner. Cost of
household connection up to premises boundary will be borne by respective house owner.

Small Bore Sized (Solid Free) Sewerage is a non-conventional technology in which


waste water from the houses is discharged into septic tank and/or a single compartment
intercepting Chamber (IC) so as to trap the solids and the solid free effluent is allowed to
flow into the sewer pipes. The sewer pipes are laid at relatively flat gradients involving lesser
excavation depths. Reduced water requirements, treatment requirements, excavation and
material costs make solid free sewerage system as most desirable option for rural area in
Punjab.

Septic Tank/Intercepting chamber (I.C.): The wastewater generation sources in the


house (except rainwater) are connected to a single chamber for retaining the floating and
settle able solids. The solid free effluent is carried to the main sewer pipe through household
connecting pipes. The chamber requires cleaning every two to three years. The size of
chamber depends upon the number of users and cleaning frequency.
The success of Small Bore Sized (Solid Free) Sewerage primarily depends upon this
component. In this type of sewerage system, only solid free effluent is to be carried by the
sewerage network and Septic Tank/Intercepting chamber is the key component, which is to
be constructed to trap the solids.

In all the villages of district Kapurthala, where sewerage schemes are under
execution, majority of households are having septic tanks / intercepting chambers. Only a
few households (as per list attached at Appendix ‘A’) are not having septic tanks /
intercepting chambers constructed in their premises. Village wise data of households without
septic tanks / intercepting chambers was collected and economically weaker households
under various categories such as SC, BPL, Small marginal farmers, households headed by
physically handicapped persons and women were signified. The proposal for constructing
septic tanks / intercepting chambers in economically weaker households by the department
was sent to Punjab Rural Development Board by SPMC, DWSS, Punjab for obtaining funds
as no funds for such purpose were available in PRWSS Project. Punjab Rural Development
Board vide their letter no. PRDB/E-3/413 dated 19/2/2014 released Rs. 12.24 Crore in
SPMC account with some terms and conditions for construction of septic tanks / intercepting
chambers to these economically weaker households which are unable to construct septic
tanks / intercepting chambers.

The cost of septic tanks / intercepting chambers as per specified drawing, comes out
to be Rs. 10244/- as per revised Premium applicable on CSR wef 11/12/2013. (Drawing and
quantity/cost calculation attached.)

Executive Engineer,
W/s & Sanitation Division,
Kapurthala
No. of households without Septic tanks/ IC Chambers in 6 Schemes where sewerage system is to be laid
(As per information received from Circle/ Field offices)

General Abstract (Cost Calculation)


Sr. Sewer Block Total House SC households BPL Others Small marginal physical women headed Total Total Cost
no. Scheme Cost hold farmers handicapped household HH @ Rs.
(in Lac) without 10244/- per
Total without Total without Total without Total without Total without Septic septic
Septic Septic Septic Septic Septic Tank/ Tank/ IC
Tank/ IC Tank/ Tank/ IC Tank/ IC Tank/ IC IC (Rs. in
IC Lacs)
1 Raipur Nadala 193.29 450 24 9 1 0 75 11 6 4 19 7 31 3.18
Peerbux
2 Tashpur Sultanpur 126.4 170 40 6 10 4 69 10 0 0 2 1 21 2.15
Lodhi

3 Lakhan Kapurthala 230.25 512 227 14 1 1 73 11 3 0 12 0 26 2.66


Kalan

4 Jaid Kapurthala 194.04 317 64 0 11 11 55 3 7 4 15 12 30 3.07

5 Jabo Sultanpur 89.78 94 40 13 7 1 34 0 0 0 2 1 15 1.54


Sudhar Lodhi
6 Bhakhriana Phagwara 189.27 295 151 63 15 0 28 0 4 0 20 0 63 6.45

District & Divn. Total: 1023.03 1838 546 105 45 17 334 35 20 8 70 21 186 19.05

Sub Divisional Engineer, Sub Divisional Engineer, Sub Divisional Engineer, Sub Divisional Engineer,
W/s & Sanitation Sub Division, W/s & Sanitation Sub Division, W/s & Sanitation Sub Division, W/s & Sanitation Sub Division No.1,
Phagwara. Bhulath at Kapurthala. Sultanpur Lodhi. Kapurthala.
Executive Engineer,
W/s & Sanitation Division,
Kapurthala.
No. of households without Septic tanks/ IC Chambers in 6 Schemes where sewerage system is to be laid
(As per information received from Circle/ Field offices)

General Abstract (Cost Calculation)


Sr. Sewer Block Total House SC households BPL Others Small marginal physical women headed Total Total Cost
no. Scheme Cost hold farmers handicapped household HH @ Rs.
(in Lac) without 10244/- per
Total without Total without Total without Total without Total without Septic septic
Septic Septic Septic Septic Septic Tank/ Tank/ IC
Tank/ IC Tank/ Tank/ IC Tank/ IC Tank/ IC IC (Rs. in
IC Lacs)
1 Raipur Nadala 193.29 450 24 0 1 0 75 20 6 4 19 7 31 3.18
Peerbux
2 Tashpur Sultanpur 126.4 170 40 7 10 4 69 9 0 0 2 1 21 2.15
Lodhi

3 Lakhan Kapurthala 230.25 512 227 0 1 24 73 0 3 0 12 2 26 2.66


Kalan

4 Jaid Kapurthala 194.04 317 64 0 11 11 55 4 7 3 15 12 30 3.07

5 Jabo Sultanpur 89.78 94 40 11 7 2 34 0 0 0 2 2 15 1.54


Sudhar Lodhi
6 Bhakhriana Phagwara 189.27 295 151 63 15 0 28 0 4 0 20 0 63 6.45

District & Divn. Total: 1023.03 1838 546 81 45 41 334 33 20 7 70 24 186 19.05