Mangala Wellpads Manifest 25-Jul-18
Manifest
Project-
Salvage material dismantling , valve de-torqueing and loading on trailer for slot no-201,203,204 Mechanical 160357
Operation
Premansoon activity , cellar pit , trench pit bund wall and all repairing civil work Construction 160358
E - house and old S/S , batery room housekeeping to be done Electrical 160367
Maintenance
Well no 273 choke vavle , chemical line , trim line and FP outlet spool removal and re installation to be done Mechanical 160398
Maintenance
Electrical
EHT transformer and Heat-tracing Panel pm job to be done Maintenance 160401
Manual Excavation for Chain line fencing and steel fixing , shuttering , concereting , housekeeping work Project-Civil 160410
Scaaffolding erection and dismantling modification work Project- 160412
Mechanical
New cellar pit Rig mate breaking , material loading , unloading slot no-109,110 HLB-CIVIL 160414
All MWP New cellar pit slot no-199,200, steel fixing , shuttering , concreting , backfilling , compaction work HLB-CIVIL 160417
Material loading , unloading for civil work Project-Civil 160418
Scaffolding for support E & I work activity and cable tray installation well no-98,101 Project-Electrical 160419
Cable laying , glanding , termination activity in inside subtaition Project-Electrical 160421
Instrument cable tray and support installation , cable laying , glanding and termination work in VFD area for well no-98,101 Project- 160422
Instrument
Mechanical and Manual Excavation , backfilling for new Irrigation HDPE line Opic 160424
Manual Excavation , concreting , shuttering , steel fixing and backfilling , brick work for new VFD and RMU Project-Civil 160426
New cellar pit Manual Excavation for trail pit slot no-109,110 HLB-CIVIL 160427
New cellar pit Manual Excavation for trail pit slot no-207,208,111,112 HLB-CIVIL 160428
Photography to be done from waste pit & flar pit for PE activity Petroleum 160431
Manual excavation for cable laying for new MCP Installation Instrument 160436
Maintenance
Cable laying , glanding & termination , tray work , tubing, and , tray support installation for new H2s scavenging project OPIC 160438
Mechanical
Polymer pump - 208 section line isolation valve replacement to be done Maintenance 160446
Down hole tubing from autoclave valve to CI line for new H2S scaveging Project inside well no- 15,45,240,&276 OPIC 160451
New cellar pit rig mate breaking and loading and unloading slot no-99,100/199,200 Project-HLB 160455
All MWP,MS-1 Cable glanding, termination ,tray fixing, and light fixer installation Project-Electrical 160458
All MWP Material loading and unloading and material shifting, housekeeping Project-Electrical 160459
Commissioning-
All MWP,supp,ms-1 325 KVA step up transformer commisioning & charging activity Electrical 160460
All MWP-SUPP-MS-1-
CPF H2s Measurement Lab 160461
Cluster-D,7,8,9,17 Water injection element to be replacement job Mechanical 160463
Maintenance
EORP Stringing , Loading, Unloading at SRP area Project-Pipeline 160469
MPT CCR Pipe shifting , stringing, and materil loading, unloading for MIPAP Project. Project-Pipeline 160471
MPT out-pipe coridir- Rov suvey , grading, loading & clearing work Project-Pipeline 160472
supp
MPT to MWP-
6,7,8,9,17,SUPP New cellar pit manual excavation for trial pi Project-Pipeline 160473
MPT to MWP- To carry out new polymer header line and branch line installation work Project- 160474
6,7,8,9,17,SUPP Mechanical
MWP-01 Conductor Rig operation , drilling to install conductor casing in new cellar pit casing installation and grouting and housekeeping , concreting work Drilling 160479
MWP-01 Scaffolding erction & removal to be done Petroleum 160481
MWP-01,09,17 Earthing integrity checks to be done Electrical 160493
Maintenance
MWP-02 Vehicle Movement for x-mass tree and well head greasing job Mechanical 160496
Maintenance
MWP-02 Concreting , shuttering , steel fixing , brick work , plastering and backfilling for new VFD and RMU Project-Civil 160497
MWP-02 Diesel loading and unloading to be done at near SUPP diesel storage tanker EORP area Petroleum 160501
MWP-02 Material loading , unloading, lifting, for new H2s skid OPIC 160513
MWP-02 Pipe jointing, laying , area leveling for new irrigation HDPE line OPIC 160514
Electrical
MWP-02 General light maintenance Maintenance 160515
Electrical
MWP-02 Earth pit chamber cover resistance valve painting Maintenance 160516
MWP-02 To perform material loading unloading shifting and erection for VFD & RMU structure shed work Project- 160519
Mechanical
Project-
MWP-02 Scaffolding erection and dismantling modification for cellar pit inside and outside slot no-201,203,204 Mechanical 160520
MWP-02 Material loading & unloading & shifting to be done[ Mechanical 160536
Maintenance
MWP-04 Well-217 UMV-4063 feedback switch remove & refixing. Instrument 160560
Maintenance
Pre-
MWP-04 33 KV new RMU panel commissioning & transformer testing and charging activity Commissioning 160567
MWP-04 Compecting,Shutering,Brick work,plastering,Scaffolding erection, backfilling for VFD & RMU Project-Civil 160572
Mechanical
MWP-04 Polymer pump 6 month PM checks & PSV calibration to be done & electrical cable removal to be done Maintenance 160575
MWP-05 RCC, backfilling ,PCC, compaction , Painting , Housekeeping, material loading, unloading Civil-HLB 160582
Electrical
MWP-05 HVAC VRF And pakage AC general inspection Maintenance 160586
MWP-05 New H2s scavenging skid leaved test & punch point rectification OPIC 160587
MWP-06 WN-319 UMV Feedback sancer remove and reffixed to be done Instrument 160603
Maintenance
Electrical
MWP-06 Polymer motor greasing job to be done Maintenance 160605