Sei sulla pagina 1di 3

PROJECT: 1-Storey (2 Classroom) School Building - Type 2

TOTAL NO. UNITS: 1 UNIT-2 STOREY (1 CLASSROOM) SCHOOL BLDG-TYPE 2


REVISION - 3 ( CORRIDOR RAILING 1.5M)
Item
DESCRIPTION QTY UNIT
No.
I PRELIMINARIES
1.0 Permits & Tax 1 lot
1.1 1.1 Building Permit 1 lot
1.2 1.2 Occupancy Permit 1 lot
2.0 Bonds & Insurances
2.1 Performance Bond 1 lot
2.2 Surety Bond (for D/P) 1 lot
2.3 Guarantee Bond 1 lot
2.4 Contractor's All Risk Insurance 1 lot
2.5 Contractor's Employees Accident Insurance 1 lot
3.0 Temporary Facilities/Utilities/Security (power, water) 1 lot
4.0 Temporary Fence 1 lot
5.0 Mobilization/Demobilization 1 lot
6.0 Material Testing 1 lot
7.0 Safety Requirements 1 lot
8.0 Support Equipment 1 lot
9.0 As-Built Plan 1 lot
10.0 Staff and Engineers Overhead 1 lot
TOTAL PRELIMINARIES
II SITEWORKS
1.0 Excavation 20 cu.m.
2.0 Backfilling & Compaction 9.13 cu.m.
3.0 Clearing & Disposal 1 lot
4.0 Soil Poisoning 183 sqm
5.0 Gravel Bedding 2.40 cu.m.
6.0 Earthfill 32 cu.m.
7.0 Vapor Barrier 183 sq.m
SUB TOTAL FOR SITEWORKS
III CONCRETE
IV 1.1 Foundation 3.12 cu.m.
1.2 Slab on Fill 21.21 cu.m.
1.3 Wall Footing 5.82 cu.m.
1.4 Stiffener Column 4.49 cu.m.
1.5 Beam 5.82 cu.m.
SUB TOTAL FOR CONCRETE
REBARS
1.1 Foundation 164 kgs
1.2 Slab on Fill 1125.97 kgs
1.3 Stiffener Column 729.98 kgs
VI 1.4 Beams 1246.30 kgs
1.5 Wall Footing 355.26 kgs
1.6 CHB Dowel and HB 592 kgs
SUB TOTAL FOR REBARS
V FORMWORKS
1.2 Slab on Fill 11.68 m2
1.4 Stiffener Column 76.62 m2
1.5 Beams 10.72 m2
SUB TOTAL FOR FORMWORKS
VII MASONRY
1.1 CHB 4" in tool joint finish (interior) 73.50 m2
1.1 CHB 6" in tool joint finish (exterior) 204.50 m2
1.2 Plastering (Tool Joint) 278 m2
SUB TOTAL FOR MASONRY
DOORS & WINDOWS
1.1 Doors

1.1.1 0.9x2.10m - Flush Door Type with Jamb, viewing glassand Fixed Glass for transom in complete accessories (@ Classroom) 4 sets

1.1.2 0.9x2.10m - Flush door with jamb and bottom louver and complete hardwares (PWD Toilets) 1 sets
1.1.3 0.7x2.10m - Flush door with jamb and bottom louver and complete hardwares (Boys and Girls Toilet) 2 sets
VIII 1.2 Windows
1.2.1 1.40x1.60 - 6mm thk Frosted Jalousie Glass in Anodized Frame with Fixed glass 8 sets
1.2.2 0.6x1.60 - 6mm thk Frosted Jalousie Glass in Anodized Frame with Fixed glass 4 sets
IX 1.2.3 0.60x0.60m - 6mm thk Clear Glass Awning Window in Anodized Finish 4 sets
SUB TOTAL FOR DOORS AND WINDOWS
CEILING WORKS
1.1 3/16 Ficem Board on Metal Furring @ 2nd Floor 253 m2
X SUB TOTAL FOR CEILING WORKS
ROOFING
1.1 Roofing (rafters and purlins including purlin cleats, sagrods bolt, nuts, washer and other consumables) 2,300 kgs

1.2 Rib type Roofing 0.4mmthk x 0.95mw x ls (including fascia board, end fascia flashing s, screws and other consumables)
XII 253 m2
with 5mm thk P.E. sheet Insulation 2 sided (including tape, blind rivets and other consumables)

1.3 J-bolt 6mm diameter 1,180 pcs


SUB TOTAL FOR ROOFING
STEELWORKS
1.1 Ramp Railings - in 42mm dia. B.I. Pipe, Painted Finish 9 lm
1.2 50mm x 50mm x 3mm thk Checkered Plate Nosing @ Concrete Stair 18 lm
SUB TOTAL FOR STEEL WORKS
PLUMBING FIXTURES
1.1 Water Closet 3 sets
1.2 Lavatory with complete accessories 3 sets
1.3 Urinal with complete accessories 1 set
1.4 Stainless Grab Bar 2" 1 pc
XIV 1.5 Stainless Floor Drain 4"x4" 3 pcs
1.6 Facial Mirror (0.9 x 1.275) 3 pc
1.7 Toilet Partition (3/4 plywood) 3 m2
1.9 Unglazed Tile 30x30 (12"x12") 23 m2
2.0 Glazed Tile 30x30 (12"x12") 48 m2
SUB TOTAL FOR PLUMBING FIXTURES
PLUMBING
COLD WATER LINE
A PPR Pipes (PN-10) Fusion Joint
1"X4Mts 2 Length
1/2"X4Mts 6 Length
B PPR Fittings (PN-10) Fusion Joint
Elbow 90°
1" 5 Pcs
1/2" 30 Pcs
Tee Reducer
1" X 1/2" 1 Pcs
Coupling Reducer
1 X 1/2" 1 Pcs
Coupling
1" 2 Pcs
1/2" 6 Pcs
Coupling With Female Thread
1" 2 Pcs
Coupling With Male Thread
1" 2 Pcs
1/2" 6 Pcs
D Valves And Accessories
Gatevalve (Brass)
1" 1 Pcs
1/2" 3
E Consumables 1 Lot
SANITARY LINE
1.0 PVC PIPES
100mm x 3m 5 Length
80mm x 3m 1 Length
50mm x 3m 2 Length
2.0 PVC FITTINGS
WYE
100mm X 100mm 6 pcs.
100mm X 50mm 6 pcs.
80mm X 50mm 1 pcs
ELBOW 45°
100mm 14 pcs.
80mm 2 pcs.
50mm 7 pcs.
ELBOW 90°
100mm 3 pcs.
50mm 4 pcs.
PVC CO
100mm 1 pc
FCO BRASS
100mm 3 pcs.
80mm 1 pc
SANITARY TEE
50mm 4 pcs
P-TRAP
50mm 3 pcs.
COUPLING
100mm 5 pcs
80mm 1 pc
50mm 2 pcs
COUPLING REDUCER
100mm x 80mm 1 pc
3.0 VENTILATION SYSTEM
PVC PIPES
50mm x 3m 14 Length
PVC FITTINGS
TEE
50mm X 50mm 10 pcs.
XIV ELBOW 90°
50mm 25 pcs.
4.0 Septic Tank 1 lot
5.0 CONSUMABLES 1 Lot
TOTAL PLUMBING WORKS
ELECTRICAL
1.0 ROOUGH-IN
1.1 20 mm diameter x 3m pvc pipe 42 lgs
1.3 25 mm diameter x 3m imc pipe 1 lgs
1.4 20 mm diameter pvc coupling 42 pcs
1.7 20 mm diameter pvc male adapter/locknut 100 prs
1.8 25 mm diameter imc connector 1 prs
1.10 25 mm diameter imc elbow 2 pcs
1.12 25 mm-Ø Service Entrance Cap, For IMC Pipe 1 pc
25 mm diameter imc clamp 2 pcs
1.13 Utility Box, 2" x 4" Deep Type 16 pcs
1.14 Junction Box w/ cover, Octagonal 4" 33 pcs
2.0 WIRES & CABLES
2.1 2.0 mmØ TW 190 lm
2.2 2.0 mmØ THHN 90 lm
2.3 3.5 mm² THHN 460 lm
2.4 8.0 mm² THHN 30 lm
3.0 WIRING DEVICES
3.1 One Gang One Way Switch, 15A, 250V, Akari or Equal 3 sets
3.2 Two Gang One Way Switch, 15A, 250V, Akari or Equal 3 sets
3.3 Duplex Convenience Outlet Grounding Type, 15A, 250V 4 sets
3.4 Single Convenience Outlet Grounding Type, 15A, 250V 4 sets
4.0 LIGHTING FIXTURES
4.1 Flourescent Lamp T5 - 36 watts, open type base 16 sets
4.2 Plastic receptacle 4" round 11 sets
4.3 CFL Bulb 18 watts 11 sets
4.4 Ceiling Fan 4 sets
5.0 PANELBOARDS, WIRE GUTTERS & CB GUTTER
5.1 LP, Flush Mounted, NEMA-1R 1 assy
Main CB : 50AT/50AF, 2P, 10kAIC, 230V
Brs. : 3-15AT/50AF, 1P, 10kAIC, 230V
3-20AT/50AF, 1P, 10kAIC, 230V
1-Space, 1P, 10kAIC, 230V
5.2 50AT/50AF, 2P, 230V CB IN NEMA - 3R Enclosure 1 assy
6.0 GROUNDING SYSTEM
6.1 20mm-Ø x 3000mm Length, Copper Clad Steel Ground Rod with Clamp 1 pc
6.2 20 mm - Ø x 3m pvc pipe 1 pc
6.3 2 mm - Ø Male Adapter w/ Lock Nut 1 pc
6.4 5,5 mm² TW Wire 5 lm
7.0 MISCELLANEOUS
XIII Miscellaneous & Hardwares 1 lot
XVI TESTING & COMMISSIONING
8.0 Testing & Commissioning 1 lot
TOTAL ELECTRICAL WORKS
PAINTING 902.20 m2
FURNITURES
1.1 Chairs 90 sets
1.2 Table and Chair for Teacher 2 sets
1.3 Chalkboard 2 sets

TOTAL AMOUNT 1,240,000.00


PER CL 620,000.00
NOTE: REVISED ROOFING DESIGN IS INLCUDED