PROJECT: Proposed 2-Storey Residential Extension

LOCATION: Block 16 Lot 9 Elmwood Lane Parksring Village San Pedro, Laguna
OWNER: Joselito de Jesus
SUBJECT: Quotation
DATE: 7-Sep-19

MATERIAL
ITEM DESCRIPTION QTY UNIT
UNIT COST AMOUNT
I General Requirements
1.01 Mobilization / Demobilization 1 lot
1.02 Temporary Facilities / Transportation 1 lot
1.03 Working Permit 1 lot
1.04

II Architectural Works
A Kitchen
1 Supply and Installation of backsplash tiles 1.34 sq.m 1,278.75 1,713.53
B Dining Area / Living Area
1 Supply and Installation of painted gypsum ceiling. 24.5 sq.m 1,050.00 25,725.00
2 Supply and Installation of painted gypsum drop ceiling. 7.6 sq.m 1,750.00 13,300.00
3 Supply and Installation of wall mounted mirror. (650x2400) 4 pcs 3,300.00 13,200.00
4 Supply and Installation of living area tv console and cabinets. 1 set 25,500.00 25,500.00
5 Supply and Installation of working desk and shelves on living area. 1 set 10,200.00 10,200.00
C Bedroom Area
1 Supply and Installation of painted gypsum ceiling. 13.5 sq.m 1,050.00 14,175.00
2 Supply and Installation of painted gypsum drop ceiling. 7.8 sq.m 1,750.00 13,650.00
3 Supply and Installation of tv console and cabinets. 1 set 31,500.00 31,500.00
4 Supply and Installation of dresser. 1 set 9,750.00 9,750.00
5 Supply and Installation of bed headboard 1 set 11,250.00 11,250.00
6 Supply and Installation of wall mounted mirror. (650x1200) 4 pcs 1,950.00 7,800.00
D Utility Room
1 Supply and Installation of washing overhead cabinet. (800x800x400) 1 set 15,500.00 15,500.00
E Toilet & Bath
1 Supply and Installation of towel rail. 1 pc 7,500.00 7,500.00
2 Supply and Installation of frosted sticker film. 4.05 sq.m 1,600.00 6,480.00
F Others as required.

III Electrical Works


1 Installation of lighting fixtures
Pin lights 26 pcs 975.00 25,350.00
Pendant lights 3 pcs 975.00 2,925.00
Surface mounted 2 pcs 975.00 1,950.00
LED T5 2 pcs 1,800.00 3,600.00
2 Roughing ins, conduits, mouldings 1 lot

IV Plumbing Works
1 Waterline extension for washing machine. 1 length
2 Drain extension for washing machine. 1 length
3 Coring Works 1 lot

V Window Finishes
1 Supply and Installation of window valance. 1 lot 4,500.00 4,500.00
2 Supply and Installation of curtain. 1 lot 5,000.00 5,000.00

VI Finishing Works
1 Interior Painting Works 208.65 sq.m 280 58,422.00
LABOR TOTAL
UNIT COST AMOUNT AMOUNT

55,000.00
15,000.00
10,000.00

806.00 1,080.04 2,793.57

652.50 15,986.25 41,711.25


1,085.00 8,246.00 21,546.00
990.00 3,960.00 17,160.00
17,850.00 17,850.00 43,350.00
7,140.00 7,140.00 17,340.00

652.50 8,808.75 22,983.75


1,085.00 8,463.00 22,113.00
22,050.00 22,050.00 53,550.00
7,312.50 7,312.50 17,062.50
2,250.00 2,250.00 13,500.00
585.00 2,340.00 10,140.00
10,850.00 10,850.00 26,350.00

300.00 300.00 7,800.00


650.00 2,632.50 9,112.50

390.00 10,140.00 35,490.00


390.00 1,170.00 4,095.00
390.00 780.00 2,730.00
720.00 1,440.00 5,040.00
42,000.00

8,000.00
7,000.00
12,000.00

1,800.00 1,800.00 6,300.00


2,000.00 2,000.00 7,000.00

400 83,460.00 141,882.00

TOTAL AMOUNT 678,049.57