ACHIEVEMENT IN RESPECT OF EHV TRANSMISSION LINES

AS ON 31.03.2014
Sr.NO. PARTICULARS TYPE OF CIRCUIT DATE OF
CIRCUIT LENGTH(CKm) COMPLETION
I) 765 KV LINES
1 765kV S/C ANTA - PHAGI LINE (CKT - II) S/C 213.65 04.01.2014
(Charged on 400kV )
2 765kV S/C ANTA - PHAGI LINE (CKT - I)** S/C 211.848 25.03.2014
(Charged on 400kV )
TOTAL 425.498
II) 400 KV LINES
1 400KV D/C KAWAI SCTPS- (765KV GSS) ANTA LINE D/C 100.596 04.01.2014
2 400KV D/C KALISINDH TPS- (765KV GSS) ANTA LINE** D/C 158.754 26.03.2014
TOTAL 259.350
III) 220 KV LINES
JAIPUR ZONE
REMAINING PORTION OF 220 kV D/C LINE TO CONNECT LILO of HEERAPURA -
1 D/C 8.14 15.07.2013
KHETRI LINE TO LILO OF NEEMRANA - KOTPUTLI LINE
220KV CABLE TO CONNECT SANGANER - MANSAROVAR SECTION TO 220kV GSS
2 S/C 2.245 17.08.2013
MANSAROVAR (GIS)
220KV CABLE TO CONNECT HEERAPURA - MANSAROVAR SECTION TO 220kV
3 S/C 2.23 12.09.2013
GSS MANSAROVAR (GIS)
220kV D/C LINE FROM 400KV GSS PGCIL JAIPUR SOUTH (CHAKSU)- 220KV GSS
4 D/C 15.91 24.10.2013
CHAKSU
5 LILO OF 220KV D/C DAUSA - ANTA LINE AT 220KV GSS LALSOT D/C 21.364 13.11.2013
6 220kV D/C HINDAUN -GANGAPURCITY LINE D/C 107.548 21.12.2013
7 220kV D/C KOTPUTLI - MANOHARPUR LINE D/C 101.738 26.02.2014
AJMER ZONE

8 D/C 2.80 24.07.2013


LILO OF 220KV D/C CHITTORGARH-DEBARI LINE AT 400KV GSS CHITTORGARH
9 LILO OF 220KV KANKROLI - BALI LINE AT 220KV GSS BAMAN KA TUKDA D/C 4.314 06.09.2013
10 LILO OF EXISTING 220KV KHETRI-REENGUS LINE AT 400KV GSS BABAI D/C 1.880 31.10.2013
LILO OF 220KV S/C RATANGARH - REENGUS LINE AT 220KV GSS
11 D/C 6.228 04.03.2014
LAXMANGARH**

JODHPUR ZONE
19.08.2013 &
12
LILO OF 220KV D/C BARSINGHSAR - PHALODI AT 220KV GSS BAAP D/C 51.060 20.08.2013
(i) 220kV Phalodi -Baap section(Line length - 31.207 km) commissioned on
19.08.13 & (ii) 220kV Baap -Barsinghsar section(Line length - 143.388km)
commissioned on 20.08.13)
UPGRADATION OF EXISTING 132KV AMARASAGAR -GTPP RAMGARH LINE ON
13 S/C 19.10.2013
220KV 0.800
220KV D/C BAAP- BHADLA LINE (ONE CKT CHARGED ON 33KV ON 27.02.2014 & 27.02.2014 &
14 D/C 104.112
SECOND CKT CHARGED ON 220KV ON 31.03.2014)** 31.03.2014
TOTAL 430.369
IV) 132 KV LINES
JAIPUR ZONE
1 LILO OF 132KV DHOLPUR-RAJAKHERA LINE AT 132KV GSS MANIYA D/C 29.832 01.04.2013
2 LILO OF 132KV KG BAS -KHUSHKHERA LINE AT 132KV GSS PUR KOTKASIM D/C 11.088 01.04.2013
3 132 KV S/C MANOHARPUR - SHAHPURA(CKT-II) S/C 13.151 08.07.2013
4 132 KV S/C JHAKHARANA - MANDAN LINE S/C 31.895 14.11.2013
5 LILO OF 132KV PAOTA - SHAHPURA LINE AT 132KV GSS BILWADI D/C 11.052 22.01.2014
6 LILO OF 132KV BANSUR - THANAGAZI AT 132KV GSS NARAINPUR D/C 4.02 21.02.2014
132KV D/C LINE FROM 220KV GSS BHIWADI - M/S STRIDE AUTO PARTS
7 D/C 4.454 12.03.2014
LTD.,I/A KAHRANI(DEPOSIT WORK)**
AJMER ZONE
8 LILO OF 132KV KEKRI-DEOLI LINE AT 132KV GSS SAWAR D/C 9.94 11.04.2013
9 132KV S/C MDSU-PUSHKAR ROAD LINE S/C 11.706 12.04.2013
10 132KV S/C GANGAPUR-RAIPUR LINE S/C 22.824 22.04.2013
11 132KV S/C MAVLI - SANWAD LINE S/C 16.738 07.06.2013
12 132KV S/C DHOD - DAYALPUR LINE S/C 30.17 11.06.2013
13 132 KV S/C AJOLIYA KA KHERA - BASSI LINE S/C 18.31 27.07.2013
14 LILO OF 132KV BEAWER -GULABPURA LINE AT 132 KV MASUDA D/C 20.052 29.07.2013
Gentry work of Lilo of 132kV Beawer - Gulabpura line at 132kV GSS Masuda D/C 0.160 23.10.2013
132KV S/C LINE FROM 132KV GSS DANTA - M/S KANCHAN INDIA LTD. NANK
S/C 2.475 15.09.2013
15 PURA(DEPOSIT WORK)
16 LILO OF 132KV KHETRI NAGAR- BABAI LINE AT 132 KV MEHARA D/C 10.372 12.10.2013
17 132KV S/C MAHALPAS-BUHANA LINE S/C 14.251 15.10.2013
18 132KV S/C AJEETGARH - SANWALPURA TANWARAN LINE** S/C 17.108 15.03.2014
JODHPUR ZONE
19 LILO OF 132KV BADNU - JASRASAR LINE AT 132KV GSS LALMDESAR BADA D/C 4.592 03.04.2013
20 LILO OF 132KV PUGAL ROAD -GAJNER AT 220KV GSS GAJNER D/C 31.102 05.04.2013
21 LILO OF 132KV REODAR - ABU ROAD LINE AT 132KV GSS RIICO ABUROAD D/C 0.976 06.04.2013
22 132 KV S/C SANCHORE - PALADAR LINE S/C 17.331 21.08.2013
23 LILO OF 132KV NAPASAR - BADNU LINE AT 132KV GSS MOONDSAR D/C 5.40 21.10.2013
24 132 KV S/C BAITHWASIA - MATORA LINE S/C 18.755 15.11.2013
(33 Mtr gantry portion at 220kV GSS Baithwasia pending)
132KV S/C BORUNDA- NIMBOL LINE FOR M/S SIDHI VINAYAK (DEPOSIT
S/C 15.49 01.03.2014
25 WORK)**

TOTAL 373.244
V) MISCELLANEOUS WORK

33KV S/C LINE ON 132KV TOWERS WITH PANTHER CONDUCTOR FROM 132KV
1 S/C 91.035 02.04.2013
GSS POKHARAN TO RD-1251 - NACHANA FANTA LINE (DEPOSIT WORK OF PHED)

NOTE: ** Indicate achievement during current month


* Indicate late reporting