Sei sulla pagina 1di 1

OBTENCION DE LA CARGA DE EJES EQUIVALENTES W18 - ESTACION 01

ESTACION Nº 01 - Lunes, 07 de Setiembre de 2015 (día con más carga vehicular).

EJE DE DISEÑO PROMEDIO


CONTEO AV. TRAF. IMD ANUAL EJES FACTOR FACTOR DE
VEHICULO TRAF. DESV. IMD ESAL
PALIAN GENERADO VEH/AÑO EQUIVALENTES PRESION CREC.
Ligeros 650 280.00 280.00 1,210.00 441,650 0.0001 1.00 11.2034 495
C2 2 1.00 2.00 5.00 1,825 4.9710 1.00 12.8754 116,806
C3 1 1.00 2.00 4.00 1,460 2.5320 1.60 12.8754 76,155
C4 1 1.00 2.00 4.00 1,460 2.3120 1.70 12.8754 73,884
T2S1 0 0.00 2.00 2.00 730 8.7210 1.50 12.8754 122,953
T3S2 0 0.00 1.00 1.00 365 5.4215 1.70 12.8754 43,313
S3 0 0.00 1.00 1.00 365 7.0490 1.90 12.8754 62,941
2T2 0 0.00 0.00 0.00 0 8.5270 1.90 12.8754 0
2T3 0 0.00 0.00 0.00 0 12.5170 1.80 12.8754 0
B2 2 0.80 0.80 3.60 1,314 4.9710 2.00 12.8754 168,201
B3-1 0 0.00 2.00 2.00 730 2.4884 1.90 12.8754 44,438
Total 709,186
7.1.E+05

W 18= ESALxFdxFc
Factor Direccional Fd= 50% 0.50 2 sentidos
Factor Carril Fc= 80% 1.00 1 carril por sentido
ESAL= 7.09.E+05
M W 18= 354,593 3.55.E+05

* Para el tráfico desviado se ha asumido el 40% del conteo.


* Para el tráfico generado se ha asumido el 40% del conteo.

Potrebbero piacerti anche