Sei sulla pagina 1di 2

Job Safety Analysis

Rev. No. PM /WO No Authorization by Dept. Mgr JSA Team:

Job Location Cold Box

Job Description Removing the flange on the 2nd floor Approved signed: Analyzed signed:

Required Tools and Equipments: hand tools, hacksaw blade


Identify the hazards in each step: Pressure/ Electricity/ Chemicals/ Depth/ Height/ Weight/ Slip-Trip-Fall/ Struck By/ Dropped-Moving Object/ Noise/ Hot-
Cold Temperature/ Vibration/ Tool Equipment/ Fire – Explosion/ Heat-Dust-Gas/ Unit Tripped/ Environment/Others

No Sequence of Basic Job Steps Potential Hazards Hazards Control – Recommended Action/ Procedure

1. Inform to Operation about this job Miscommunication PTW

a. Use standard PPE, use safety helmet, use safety


gloves, use full body harness, use safety shoes, use
safety glasses
b. Don’t keep the unnecessary materials on the
Material drop, tools fall down, scaffolding fall scaffold platform.
2. Install scaffolding down, worker fall down
c. Hand tools to be tied with permanent structure or
person.
d. If required barricade the area during the installation
work
No Sequence of Basic Job Steps Potential Hazards Hazards Control – Recommended Action/ Procedure
e. The scaffolding will be permitted if it have ben
tagged
a. Using standard PPE, cotton gloves, dust mask,
safety shoes, safety glasses
Hand injury, material damage, residual dust b. Remove the flange carefully to avoid the hand
3. Remove the flange using hacksaw blade from removing activity, worker fall down injury
c. Using full body harness with double lanyard and
absorber while during remove the flange
a. Using standard PPE, cotton gloves, dust mask,
safety shoes, safety glasses
5. Install the new flange Hand injury, material drop, worker fall down
b. Using full body harness with double lanyard and
absorber while during install the flange

6. Close PTW Perform not according to LOTO procedure Follow LOTO procedure

Potrebbero piacerti anche