2.6.2.3.5.3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL GLOBAL 1.00 S/. 30,503.30 S/. 30,503.30
2.6.2.3.5.4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES GLOBAL 1.00 S/. 115,309.45 S/. 115,309.45
2.6.2.3.5.5 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS GLOBAL S/. 1,420.00 S/. 1,420.00
GASTOS GENERALES
2.6.2.3.5.2 GASTOS POR LA COMPRA DE BIENES GLOBAL 1.00 S/. 200.00 S/. 200.00
2.6.2.3.5.2 GASTOS POR LA CONTRATACION DE SERVICIOS GLOBAL 1.00 S/. 7,000.00 S/. 7,000.00
SUPERVISION
2.6.2.3.5.2 GASTOS POR LA COMPRA DE BIENES GLOBAL 1.00 S/. 700.00 S/. 700.00
2.6.2.3.5.2 GASTOS POR LA CONTRATACION DE SERVICIOS GLOBAL 1.00 S/. 7,000.00 S/. 7,000.00
EXPEDIENTE TECNICO
2.6.2.3.5.2 GASTOS POR LA CONTRATACION DE SERVICIOS GLOBAL 1.00 S/. 7,000.00 S/. 7,000.00
LIQUIDACION
2.6.2.3.5.2 GASTOS POR LA CONTRATACION DE SERVICIOS GLOBAL 1.00 S/. 3,500.00 S/. 3,500.00
SUBGENERICA ESPECIFICA
SUBGENERICA
ESPECIFICA
SUBGENERICA
ESPECIFICA DETALLE UND METRADO COSTO UNITARIO COSTO PARCIAL SUB TOTAL MONTO EN S/.
DETALLE
2. GASTOS PRESUPUESTARIOS
6. ADQUISICION DE ACTIVOS NO FINANCIEROS
2. CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
3. OTRAS ESTRUCTURAS
5. AGUA Y SANEAMIENTO
3. ADMINISTRACION DIRECTA PERSONAL 30,503.30 30,503.30
PERSONAL DE OBRA 30,503.30 30,503.30
PERSONAL DE OBRA 30,503.30
TOPOGRAFO 1 dia 14.00 100.00 S/. 1,400.00
OPERARIO 3 mes 2.00 2,160.00 S/. 12,960.00
OFICIAL 2 mes 2.00 1,890.00 S/. 7,560.00
PEON 2 mes 2.00 1,620.00 S/. 6,480.00
ALMACENERO 1 mes 2.00 1,051.65 S/. 2,103.30
2. GASTOS PRESUPUESTARIOS #VALUE!
6. ADQUISICION DE ACTIVOS NO FINANCIEROS
2. CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
3. OTRAS ESTRUCTURAS
5. AGUA Y SANEAMIENTO
4. ADMINISTRACION DIRECTA BIENES 115,309.45 115,309.45
MATERIALES DE CONSTRUCCION 115,309.45 115,309.45
FIERROS, ALAMBRES (PUESTO EN OBRA) 7,927.50
ALAMBRE NEGRO RECOCIDO N° 8 KG 72.00 4.50 324.00
ALAMBRE NEGRO RECOCIDO N° 8 KG 117.00 4.50 526.50
FIERRO CORRUGADO DE Ø = 1/4" UND 255.00 8.00 2,040.00
FIERRO CORRUGADO DE Ø = 3/8" UND 255.00 19.00 4,845.00
CLAVOS PARA MADERA CON CABEZA DE 3" KG 40.00 4.80 192.00
LADRILLO (PUESTO EN OBRA) 4,364.00
LADRILLO KIN KING ARTESANAL 8X11X21CM UND 10,910.00 0.40 4,364.00
CARPINTERIA METALICA 7,716.30
PUERTA METALICA DE (1.80 X 0.75M) UND 24.00 140.00 3,360.00
TUBO METALICO CUADRADO DE 1 1/2" X 1 1/2" X 1M M 223.00 8.10 1,806.30
PLANCHA METALICA CON ALUZINC RECTO CURVO M2 102.00 25.00 2,550.00
CARPINTERIA DE MADERA 1,080.00
VENTANA C/MALLA MOSQUITERO UND 24.00 45.00 1,080.00
CEMENTO (PUESTO EN OBRA) 16,225.00
CEMENTO PORTLAND TIPO I (42.5KG) BLS 649.00 25.00 16,225.00
AGREGADOS (PUESTO EN OBRA) 17,010.00
PIEDRA CHANCADA DE 1/2" M3 31.00 85.00 2,635.00
PIEDRA MEDIANA DE 4" M3 18.00 85.00 1,530.00
PIEDRA GRANDE DE 8" M3 31.00 85.00 2,635.00
PIEDRA CHICA DE 2" M3 13.00 85.00 1,105.00
ARENA FINA M3 11.00 140.00 1,540.00
ARENA GRUESA M3 37.00 85.00 3,145.00
HORMIGON DE RIO M3 52.00 85.00 4,420.00
MADERA (PUESTO EN OBRA) 4,304.50
MADERA TORNILLO PARA ENCOFRADOS INCLUYE CORTE P2 535.00 5.50 2,942.50
ESTACAS DE MADERA UND 681.00 2.00 1,362.00
MATERIALES DE FERRETERIAS Y SIMILARES 7,115.00
TAPA CON MARCO FIERRO GALVANIZADO PARA DESAGUE 12" X 24" PZA 48.00 45.00 2,160.00
CAJA DE DESAGUE DE 12" x 24" UND 48.00 35.00 1,680.00
PEGAMENTO PARA PVC DE 1/4 GLN UND 3.00 35.00 105.00
NIPLE PVC SAP DE 1/2" x 1 1/2" UND 48.00 2.00 96.00
BISAGRA CAPUCHINA ALUMINIZADA DE 3"x3" PAR 72.00 5.00 360.00
CERROJO PARA PUERTA UND 24.00 5.00 120.00
TIRAFON + CAPUCHON DE 1/4" X 2½" UND 204.00 1.00 204.00
SUMIDERO DE BRONCE DE 2" UND 48.00 5.00 240.00
TUBO DE ABASTO 1/2" UND 24.00 15.00 360.00
VALVULA COMPUERTA DE 1/2" UND 24.00 25.00 600.00
GRIFO DE BRONCE DE 1/2" UND 24.00 20.00 480.00
DUCHA INC. CRIF 1 LLAVE UND 24.00 25.00 600.00
WINCHA DE 50 m UND 1.00 50.00 50.00
YESO EN BOLSA DE 28 KG BOL 5.00 12.00 60.00
BIODIGESTOR (PUESTO EN OBRA INCL/ INSTAL) 31,200.00
BIODIGESTOR 600 LTS INC.ACCESORIOS UND 24.00 1,300.00 31,200.00
APARATOS SANITARIOS(PUESTO EN OBRA) 5,280.00
INODORO TQUE. BAJO COLOR BLANCO INCLUI. ACCESORIOS PZA 24.00 220.00 5,280.00
TUBERIAS Y ACCESORIOS (PUESTO EN OBRA) 11,392.00
CODO DE F°G° DE 1/2" x 90° UND 24.00 2.00 48.00
UNION UNIVERSAL PVC DE 1/2" UND 48.00 5.00 240.00
UNION SIMPLE PVC SAP 1/2" UND 24.00 2.00 48.00
TUBERIA PVC SAP C-10 DE 1/2" M 253.00 4.00 1,012.00
CODO PVC SAP 1/2" X 90° UND 48.00 1.50 72.00
CODO PVC SAP 2" x 90° UND 120.00 2.00 240.00
CODO PVC SAL 4"x90° UND 96.00 8.00 768.00
CODO PVC SAL 4"x45° UND 48.00 8.00 384.00
CODO PVC SAL 2"x45° UND 144.00 4.00 576.00
CODO PVC SAL 2"x90° UND 144.00 4.00 576.00
CODO PVC 90°C/REDUCCION DE 4" A 2" UND 24.00 8.00 192.00
TEE PVC SAL 2"X2" UND 72.00 5.00 360.00
TIPO DE TRANSACCION PRESUPUESTO SEGÚN EXPEDIENTE TECNICO TOTAL
GENERICA DEL GASTO
SUBGENERICA ESPECIFICA
SUBGENERICA
ESPECIFICA
SUBGENERICA
ESPECIFICA DETALLE UND METRADO COSTO UNITARIO COSTO PARCIAL SUB TOTAL MONTO EN S/.
DETALLE
2. GASTOS PRESUPUESTARIOS
6. ADQUISICION DE ACTIVOS NO FINANCIEROS
2. CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
3. OTRAS ESTRUCTURAS
5. AGUA Y SANEAMIENTO
2. GASTO DE BIENES Y SERVICIOS NO PERSONALES 3,500.00 3,500.00
TIPO DE TRANSACCION PRESUPUESTO SEGÚN EXPEDIENTE TECNICO TOTAL
GENERICA DEL GASTO
SUBGENERICA ESPECIFICA
SUBGENERICA
ESPECIFICA
SUBGENERICA
ESPECIFICA DETALLE UND METRADO COSTO UNITARIO COSTO PARCIAL SUB TOTAL MONTO EN S/.
DETALLE
SERVICIOS 3,500.00
2. 6. 8. 1. 4. 3. LIQUIDACION MES 1.00 3,500.00 3,500.00
TOTAL
% APORTE
100.00%
###
###
###
100.00%
TOTAL
% APORTE
100.00%
100.00%
100.00%
100.00%
100.00%
TOTAL
% APORTE
100.00%
PLANILLA DE PAGOS
EMPRESA
DESCRIPCION REMUNERACION
RESUMEN
Retrib.y Complementos - Contratos a plazo fijo (Reg. Lab. Púb. y S/. 6,721.65
S/. 6,721.65
LA DE PAGOS
100
RESUMEN
LIQUIDO A PAGAR S/. 6,721.65
TOTAL DESCUENTO S/. -
SNP -
TRANSFERENCIA CORRIENTE S/. -
S/. 6,721.65
PEDIDO
OFICINA SOLICITANTE .: SUB GERENCIA DE OBRAS
RESPONSABLE : ING. SUSY GIOVANA RAMOS GALLEGOS
Mneomónico : 0357
PRESUPUESTO
PROYECTO: CONSTRUCCION : AñoDE2,011
INFRAESTRUCTURA DE LA I. E.
AGROPECUARIO JOSE MARIA ARGUEDAS DE PUTACCA DEL DISTRITO DE
PALCA - HUANCAVELICA
Precio
ITEM DESCRIPCION DEL INSUMO UND.MED CANT. TOTAL
Unitario
I CEMENTO ###
Cemento Portland Tipo I de 42.5 Kg.Unid. 5700 22.00 125400.00
II ACEROS ###
Fierro Corrugado de Ø=3/4" VAR 218.00 75.00 16350.00
Fierro Corrugado de Ø=5/8" VAR 225.00 52.00 11700.00
Fierro Corrugado de Ø=1/2" VAR 970.00 33.00 32010.00
Fierro Corrugado de Ø=3/8" VAR 1850.00 19.00 35150.00
Fierro Corrugado de Ø=1/4" temper VAR 770.00 8.00 6160.00
Clavo para madera de 2 1/2" C/C KG 250.00 4.80 1200.00
Clavo para madera de 2 " C/C KG 200.00 4.80 960.00
Clavo para madera de 3" C/C KG 250.00 4.80 1200.00
Clavo para madera de 4" C/C KG 200.00 4.80 960.00
Alambre negro recocido Nº 16 KG 1700.00 4.80 8160.00
Alambre negro recocido Nº 08 KG 800.00 4.80 3840.00