SECTION F
BA-1701 NHT CHARGE HEATER TUBES DE-COKING BY PIGGING IN CCR 1 DURING
SHUTDOWN.
Tender for De-Coking and cleaning of BA1701 NHT Charge Heater Tubes by by
Mechanical pigging in CCR 1 during the shutdown as per Process Engineering job list.
Mangalore Refinery & Petrochemicals Ltd., Mangalore, is located in Mangalore- west coast of
Southern India. MRPL is located 24 Kms away from the city of Mangalore & 7 Kms from Surathkal
(National Highway No:66) & Konkan Railway Station
1. SCOPE OF WORK.
Decoking & Cleaning of BA1701 NHT Charge Heater Tubes by by Mechanical pigging in CCR
1 unit. Scope of work includes supply & supervision of manpower with all necessary
Technology, Tools, Equipments, Tube end attachments & Transportation during the above
mentioned period as per the Detailed Scope of work below
2. Heater Details.
The Heater Tube Inlet & Outlet are located at an elevation of 15.54 metres. This is a single
Pass Heater and the details are given in Table I
TABLE –I
BA1701 –NHT Charge Heater Details
Sl No Description RADIANT
1.A pre-project meeting shall be conducted to discuss the work program and
procedure that will be deployed to complete the project.
2. The value of maximum flow rate at defined pressure and at defined skin
temperatures (based on historical data) will be mutually discussed and agreed
between contractor and EIC during pre-project meeting. Contractor technical personnel
may access the same by discussing with our technical services dept. Contractor shall
ensure complete coke removal without tube metal loss. Samples shall be collected
after every 2 hours over the duration of mechanical pigging of each pass. After
completion of pigging, foam pig shall be launched and its receiving in good condition
shall be confirmed. However the judgement of cleanliness shall be decided by
EIC/Technical services after completion of the job in close co-operation with contractor
and his responsible field engineer. The job shall be complete only after satisfactory
report by our Operation /technical service department.
3.Within 48 to 60 hours after start up of heater, post pigging, the skin temperatures & coil
differential pressure should come to the range agreed jointly by MRPL & contractor
based on historical data. If the same is not achieved during execution, MRPL reserves
the right to terminate the contract immediately without assigning reasons for it.
4.To avoid any confusion , the initial 12 hours identified standby time shall be considered
as free of charge.
5.The contractor has to report to EIC at least four to five days in advance before
commencement of shutdown and ensure the following:
6.Contractor has to provide detailed post project report containing pigging data forms,
quantities of contaminates removed, health report of tubes and project duration.
1. The Contractor shall strictly follow House keeping and Safety regulations in the
contractor’s area of work.
2. The Contractor has to ensure use of skilled manpower to carry out Job of this nature.
3. The Contract personnel shall maintain Good Discipline, Safety Standards,
Commensurate with Industrial standard as mentioned in the attached Annexure A& B.
In the opinion of the Engineer-in-charge, any of the contractor personnel is found
unsuitable services of such personnel shall be discontinued and the contractor shall
provide suitable alternate personnel immediately.
4. The Contractor shall return all the special tools, equipment and other items taken from
MRPL on completion of work duly certified by the Owner/Engineer-in-charge. For any
items lost or damaged by the Contractor, the replacement cost shall be recovered from
the Contractor’s bills.
5. Along with the offer the Contractor shall submit Details of Technology, a List of
proposed deployment of manpower, equipment, tools tackles etc. including supervisors
required to complete the job within the scheduled time.
6. The Contractors are advised to go thro’ all the attachments carefully before quoting for
the Job.
7. A canteen contractor is operating a canteen in MRPL premises. Contractor can make
his own arrangements for Tea, Snacks, Lunch& Dinner during the job inside the
refinery.
6. TIME OF COMPLETION
1. Contractor will be given a notice of 15days for mobilisation & set up of equipment at
our site. Contractor should be ready to take up job immediately as per instruction of
Engineer-In-Charge.
2. Mechanical pigging of heater is to be completed in maximum of 48 hours from the
time of handing over the heater for pigging.
7. CONTRACT VALIDITY
The contract will be valid for a period of one year from the date of PO.
SECTION G
Schedule of Rates
(To be quoted in EPS System directly)
BA-1701 NHT Charge Heater Tubes De-coking by Pigging in CCR-1 during shutdown.
Note 2:
1. Quoted rates shall be inclusive of all supplies, Labour, materials, required PPE’S for the
deployed personnel, consumables, overheads and all other costs, charges, expenses
including all applicable taxes/ duties, excluding GST.
2. GST shall be extra at actuals to MRPL A/c.
3. Quantities shown in SOR are indicative only. No minimum Quantity/Value is guaranteed.
However Payment shall be released based on the actual Quantity executed by the
contractor.
4. Rates shall be firm and fixed till execution of the contract.
5. MRPL may call for detailed breakup of the quotes, if required later.
6. All expenditure related to the scope of work to be included in the quote.