Sei sulla pagina 1di 1

Bladder Tank Maintenance &

Inspection Manual

Chemguard recommends that the installed Bladder This sample should be sent to the foam
Tank Foam Fire Protection System be maintained concentrate manufacturer for analysis.
and inspected on at least a semi- annual basis; Approximately 1 quart will be sufficient.
however, certain requirements can affect the
frequency of inspection: Please recheck all valves installed in the water
line supplying the tank and on the foam
concentrate line to the proportioning controller to
• Location of the system ensure that they are in the correct normal
• System utilization operating position.
• Local Authority/Insurance Company
PLEASE NOTE
To ensure that the system is full and operable,
the following should be checked: Chemguard recommends that on an ANNUAL
basis the following also be carried out.
• The general appearance of the tanks, supports
and installed piping. Check for any corrosion or The system should be flow tested to ensure
mechanical damage. accurate proportioning of the foam concentrate into
the water stream.
• Inspect all valves to ensure correct operation and Ensure that the system flow rate through the
that they are in their normal operating position. proportioning controller is within the recommended
These valves should have either a ring pin or a flow requirements and pressure for the size
seal that locks and secures the valve in the controller installed in the system.
correct position.
After approximately one minute of foam solution
• Check foam concentrate level in tank. This can flow, collect a sample of the discharging foam
only be carried out after the water has been in a clean container. Shut down the system.
drained from around the bladder. As water is
being drained from the tank shell drain valve, it Check the drained foam solution in the container
will be necessary to open the bladder vent with a refractometer or a conductivity meter to
valve and the tank shell vent valve to allow air ensure correct proportioning of the foam concentrate
into the tank. into the water stream.

• Check all nameplates on tank for legibility and On an open discharge device type system, flush the
corrosion. If a hydraulic concentrate control system with fresh water to remove any foam
valve is installed in the foam concentrate solution residue.
piping to the proportioning controller and/or on
the water line into the bladder tank, ensure the If the foam proportioning controller is metering the
valve operates when the system is activated. correct rate of foam concentrate into the water
Once satisfactory operation is achieved, return stream and no further flow testing is required,
the valve to the normal operating position. place all valves in their normal operating position
and ring pin or seal in that position.
• Take a sample of the foam concentrate from the
bladder tank by discharging the concentrate from Drain the water from around the bladder and
the bladder drain/fill valve into a clean plastic replace the foam concentrate used during the
container. system

CHEMGUARD
204 S. 6th Ave • Mansfield, Tx 76063 • (817) 473-9964 • FAX (817) 473-0606
www.chemguard.com
DATA SHEET #D10D03232
REVISION: 09/2005

Potrebbero piacerti anche