9/3/2019 How to Estimate Formworks of Columns, Beams, and Girders | Owlcation
framework for formworks. Formworks for columns start from the boundary between footing and column. Learn the step-by-step procedure from the examples
below.
10 3.05
12 3.666
14 4.27
16 4.88
18 5.49
20 6.10
22 6.71
24 7.32
2" Simple
x 2" Modern Howboard
29.67 to Calculate
foot What Is aboard
20.33 Buchholz
foot
MAVEN
2" Homes
x 3" and Plans Quickly
44.50 boardWithout
foot a Relay and
30.50 How
board foot
Calculator Does It Work?
Table 3: Multiplier for Wood Frames or Lumber
https://owlcation.com/stem/How-to-Estimate-Marble-Tiles-To-Use 2/9
9/3/2019 How to Estimate Formworks of Columns, Beams, and Girders | Owlcation
Perimeter = 2 ( a + b ) + 0.20
Perimeter = 2 ( 0.20 + 0.20 ) + 0.20
Perimeter = 1.00 meter
2. Multiply the value of perimeter obtained by the height of the column. The resulting value is the total surface area of the lateral faces of the column.
3. Solve for the total area of the columns in the storage warehouse. Multiply the obtained area by the number of columns in the storage warehouse. There
are eight concrete posts so multiply it by 8.
2. Get the number of pieces of wood lumber by dividing the total board foot by the volume of the lumber in cubic inches.
Perimeter = 2 ( a + b ) + 0.20
Perimeter = 2 ( 0.40 + 0.50 ) + 0.20
Perimeter = 2.00 meters
2. Multiply the value of perimeter obtained by the height of the column. The resulting value is the total surface area of the lateral faces of the column.
4. Solve for the area of the plywood you will use. In this case, the required size of plywood is 4' x 8'. Converting that to meters, it is equal to 1.20 meters x
2.40 meters.
2. Get the number of pieces of wood lumber by dividing the total board foot by the volume of the lumber in cubic inches.
https://owlcation.com/stem/How-to-Estimate-Marble-Tiles-To-Use 4/9
9/3/2019 How to Estimate Formworks of Columns, Beams, and Girders | Owlcation
Number of pieces = Total Board foot / Volume of Lumber in cubic inches
Number of pieces = 1869 / ( (2) (3) (20/12) )
Number of pieces = 187 pieces of 2" x 3" x 20' wood frame / lumber
Number of Black Metal Sheets Length of 15 cm. Spacing Length of 20 cm. Spacing
Size of Black Metal Sheets Per Square Meter Vertical Ribs (m) Vertical Ribs (m) Length of Circular Ties (m)
2. Solve for the area of a circular column. Multiply the circumference obtained by the total height of a circular column. The height of the column given is 6.00
meters.
3. Solve for the total area of the columns of the two-story office building. There are ten circular concrete columns in the building. Multiply the area of one
column by the number of columns.
https://owlcation.com/stem/How-to-Estimate-Marble-Tiles-To-Use 5/9
9/3/2019 How to Estimate Formworks of Columns, Beams, and Girders | Owlcation
4. Solve for the number of black metal sheets required. Table 4 shows the number of black metal sheets per square meter. Multiply the total area by 0.462.
Length = 94.20 ( 25 )
Length = 2,355.00 meters
2. The commercial length of vertical ribs is 6.00 meters. Divide the total length obtained by 6.00 to get the number of pieces.
2. The commercial length of steel bars is 6.00 meters. Divide the total length obtained by the commercial length of steel bars.
b. 2" x 2" Wood Frame Simple Modern How to Calculate What Is a Buchholz
MAVEN
https://owlcation.com/stem/How-to-Estimate-Marble-Tiles-To-Use 6/9
9/3/2019 How to Estimate Formworks of Columns, Beams, and Girders | Owlcation
A. Solving for 1/4" x 4' x 8' Phenolic Plywood
1. The formula for solving the required number of pieces of plywood for formworks of beams is P = 2 ( d ) + b + 0.10. 'P' is the perimeter of the three sides
you want to estimate, 'd' is the length of the vertical side and 'b' is the bottom form. The constant value 0.10 is the value to consider for the lapping of form
joints.
Perimeter = 2 ( d ) + b + 0.10.
Perimeter = 2 ( 0.40 ) + 0.30 + 0.10
Perimeter = 1.20 meters
2. Multiply the value of perimeter obtained by the length of the beam. The resulting value is the total surface area of the three faces of the beam.
3. Solve for the total area of the beams. Multiply the obtained area by the number of beams. There are eight concrete beams so multiply it by 8.
4. Solve for the area of the plywood you will use. In this case, the required size of plywood is 4' x 8'. Converting that to meters, it is equal to 1.20 meters x
2.40 meters.
2. Get the number of pieces of wood lumber by dividing the total board foot by the volume of the lumber in cubic inches.
https://owlcation.com/stem/How-to-Estimate-Marble-Tiles-To-Use 7/9
9/3/2019 How to Estimate Formworks of Columns, Beams, and Girders | Owlcation
Perimeter = 2 ( d ) + b + 0.10.
Perimeter = 2 ( 0.60 ) + 0.40 + 0.10
Perimeter = 1.70 meters
2. Multiply the value of perimeter obtained by the length of the girder. The resulting value is the total surface area of the three faces of the girder.
3. Solve for the total area of the girders. Multiply the obtained area by the number of girders. There are four concrete girders so multiply it by 4.
2. Get the number of pieces of wood lumber by dividing the total board foot by the volume of the lumber in cubic inches.
https://owlcation.com/stem/How-to-Estimate-Marble-Tiles-To-Use 8/9
9/3/2019 How to Estimate Formworks of Columns, Beams, and Girders | Owlcation
Do you want to learn how to estimate formworks for column footings and wall
footings?
Yes
No
© 2018 Ray
https://owlcation.com/stem/How-to-Estimate-Marble-Tiles-To-Use 9/9