INTRODUCTION: LP water pump is required for initial filling, make up & cooling of bottom ash hopper. It is
obtained by 08 nos of LP water pump for 06 units. For 03 units 03 nos LP water pump is running and another one is
standby).
PRE CHECKS:
LP WATER PUMP TECHNICAL DATA:-
Make Zhenjiang Auxilary Quantity 08 Nos
Machinery
Type 100HS-E Discharge Capacity 355m³/h
Discharge 0.5mpa Rotating speed r/min
Pressure
Sealing fan’s motor
Type Y315S-4 Power 30kW
Voltage 11KV Current 415V
Rotating speed r/min
OPERATING PROCEDURE -
Sr. RESPONSIBILITY
No Description UCE DE FE EE
.
PRE- START CHECKS:
1 All permits and cross permits have been returned.
2 Power supply and control power supply available.
3 Pump suction & discharge valve open.
START PERMISSIVE :
1 Pump bearing temp normal.
2 Motor bearing temp normal.
3 Motor winding temp normal.
4 Pump suction & discharge valve open.
5 Emergency push button is in release condition.
PUMP LP WATER START UP SEQUENCE :
1 Open the LP water pump suction & discharge valve.
2 Start the LP water pump.
SHUTDOWN SEQUENCE:
1.PLANNED SHUTDOWN :
1 Insure that stand by LP pump is running condition.
2 Stop the LP water pump & closed the suction valve.
3 Rectify the probable problem, if any.
INTERLOCKS : Remarks
1 Buffer water tank level is low .
ABRIVIATIONS / NOTATIONS:-
o SOP: Standard Operating Procedure