Taking output = 60 m
a) Materials
c) Machinery
d) Labour
say #VALUE!
Note The quantity of concrete required to be
removed above the designed top level of
concrete, if any, will be provided for in the
rate analysis.
Item 12.11
(F) iv
M-080
M-125
M-173
P&M-073
P&M-092
L-12
L-13
12.38 C RCC Grade M30
Unit = cum
a) Material
b) Labour
c) Machinery
say #VALUE!
M-081
M-005
M-053
M-051
L-12
L-10
L-13
L-13
P&M-009
P&M-079
12.41 1600 Supplying, fitting and placing un-coated Mild
steel reinforcement complete in foundation
as per drawing and technical specification
Unit = 1 MT
Taking output = 1 MT
a) Material
say
#VALUE! M-126
#VALUE! M-072
#VALUE! L-12
#VALUE! L-02
#VALUE! L-13
#VALUE!
#VALUE!
#VALUE!
#VALUE!