12.

29 1100 & Driven precast vertical M35 grade


1700 R.C.C. Piles excluding Reinforcement
complete as per Drawing and &
Technical Specification

Pile Diameter = 500 mm

Unit = Running Meter

Taking output = 60 m

a) Materials

RCC Grade M30 cum 11.78 #VALUE! #VALUE!

Rate for concrete may be adopted


same as for bottom plug vide item
no. 12.11( F ) (IV)

b ) Material Pile shoes

a) C.I Shoes Kg 240.00 input #VALUE!

b) M.S. shoes Kg 105.00 input #VALUE!

c) Steel helmet and cushion block Kg 30.00 input #VALUE!


on top of pile head during driving.

c) Machinery

Crane20 t capacity hour 6.00 input #VALUE!

Vibrating Pile driving hammer hour 6.00 input #VALUE!


complete with power unit and
accessories.

d) Labour

Mate/Supervisor day 0.12 input #VALUE!


Mazdoor day 3.00 input #VALUE!

Add 1 per cent of (a+b+c) for #VALUE!


carriage of piles from casting yard
to work site and stacking, and other
imponderables during installation.

e) Overhead charges @ input on #VALUE!


(b+c+d)

f) Contractor's profit @ input on #VALUE!


(b+c+d+e)

Cost for 60 m = a+b+c+d+e+f #VALUE!

Rate per metre (a+b+c+d+e+f)/60 #VALUE!

say #VALUE!
Note The quantity of concrete required to be
removed above the designed top level of
concrete, if any, will be provided for in the
rate analysis.
Item 12.11
(F) iv

M-080

M-125

M-173

P&M-073

P&M-092

L-12
L-13
12.38 C RCC Grade M30

Unit = cum

Taking output = 15 cum

(i) Using Concrete Mixer

a) Material

Cement tonne 6.10 input #VALUE!


Coarse sand cum 6.75 input #VALUE!

20 mm Aggregate cum 8.10 input #VALUE!

10 mm Aggregate cum 5.40 input #VALUE!

b) Labour

Mate day 0.90 input #VALUE!


Mason day 1.50 input #VALUE!
Mazdoor for concreting day 20.00 input #VALUE!

Mazdoor for breaking pile head, day 1.00 input #VALUE!


bending bars, cleaning etc.

c) Machinery

Concrete mixer (cap. 0.40/0.28 hour 6.00 input #VALUE!


cum)

Generator (capacity 33 KVA) hour 6.00 input #VALUE!


Formwork @ 4 per cent on cost of #VALUE!
concrete i.e. cost of a) Material,
b) Labour and c) Machinery

d) Overhead charges @ input on #VALUE!


(a+b+c)

e) Contractor's profit @ input on #VALUE!


(a+b+c+d)

Cost for 15 cum = a+b+c+d+e #VALUE!

Rate per metre (a+b+c+d+e)/15 #VALUE!

say #VALUE!
M-081
M-005

M-053

M-051

L-12
L-10
L-13

L-13

P&M-009

P&M-079
12.41 1600 Supplying, fitting and placing un-coated Mild
steel reinforcement complete in foundation
as per drawing and technical specification

Unit = 1 MT

Taking output = 1 MT

a) Material

MS bars including 5 per cent overlaps tonne 1.05 input


and wastage

Binding wire Kg 6.00 input

b) Labour for straightening, cutting,


bending, shifting to site, tying and placing in
position

Mate day 0.43 input


Blacksmith day 2.25 input

Mazdoor day 6.50 input

c) Overhead charges @ input on (a+b)

d) Contractor's profit @ input on (a+b+c)

Rate for per MT (a+b+c+d)

say
#VALUE! M-126

#VALUE! M-072

#VALUE! L-12
#VALUE! L-02

#VALUE! L-13

#VALUE!

#VALUE!

#VALUE!

#VALUE!